39-039 (2) 182 MOUNT TOM RD SM-2014-0038
COMMONWEALTH OF MASSACHUSETTS
CITY OF NORTHAMPTON
GIS#: 110415 1
°a T°tip
r
Map' I 39 ' 4—� *
Block: 039
41.1510! SHEETMETAL PERMIT
Lot: ool
Permit: SHEETMETAL SHEETMET °
RCENTEj�
Category: SHEETMETAL
Permit# sM-2014-0038 PERMISSION IS HEREBY GRANTED TO:
Project# JS-2014-000375
Est. Coss- - --� - 00 Contractor: License:
'•.. t: $99,650.00 Expires:
Charged:Fee Charged:$50.00
`-._-- -_- BUZZEE'S HEATING&AIR COND
Balance Due:';$.00 Owner: AMO DEVELOPMENT LLC
r
'#of Fixtures: Applicant: BUZZEE'S HEATING&AIR CONDITIONING
DigSafe# AT: 182 MOUNT TOM RD
'UseGroup
ConstClass
A
ISSUED ON: 10-Dec-2013 AMENDED ON: EXPIRES ON:
TO PERFORM THE FOLLOWING WORK:
INSTALL SUPPLY&RETURN
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature:
Fee Type: Receipt No: Date Paid: Check No: Amount:
Sheetmetal REC-2014-002478 09-Dec-13 8749 $50.00
212 Main Street,Phone:(413)587-1240,Fax:(413)587-1272,Email:Ihasbrouck @northamptonma.gov
GeoTMS®2013 Des Lauriers Municipal Solutions,Inc.
File#SM-2014-0038
APPLICANT/CONTACT PERSON BUZZEE'S HEATING&AIR CONDITIONING
ADDRESS/PHONE P 0 BOX 227 (413)527-3412
PROPERTY LOCATION 182 MOUNT TOM RD
MAP 39 PARCEL 039 001 ZONE
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out 179
Fee Paid
Typeof Construction: INSTALL SUPPLY&RETURN
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFJMATION PRESENTED:
(/ Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER: §
Intermediate Project: Site Plan AND/OR Special Permit with Site Plan
Major Project: Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
' -• 't • eet Co • ssion �� Permit DPW Storm Water Management
gir AMA ��./� g/g—/3
Signa eof Building G ficial Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning&Development for more information.
Commonwealth of Massachusetts
J L ILI,
i City Of Northampton
i
Electric, umbing&Gas Ir,NhLrpic`\PA , Sheet Metal Permit =/t�/-3g ate: Permit# �m
Estimated Job Cost: $ -I t (oSC) (CO Permit Fee: $g71/9 cc
Plans Submitted: YES NO K. Plans Reviewed: YES NO
Business License# Applicant License#
Business Information Property Owner/Job Location Information:
f�(q�i ki4y4c4 ) .. vcoott �a Name:�d _AMC)
Name: [���
Street: 155p »3t-Tb�v\ ?d� c Street: 1‘ ,Mouu\corm Td
City/Town: No AA--k110,.w-(J's-c. tJ
City/Town: c0KM1C1W�1-uAN-
■
Telephone: s�(, -O O 5 d 7 3 7 / ephone:
S V 6 -Ob ct O
Photo I.D. required/ Copy of Photo I.D. attached: YES NO
— Staff Initial
/1J M-1- I - tricted licens-
J-2/M-2-restricted to dwellings 3-stories or less and commercial up to 10,000 sq. ft. /2-stories or less
Residential: 1-2 family Multi-family Condo/Townhouses Other
Commercial: Office Y Retail Industrial Educational
Institutional Other
Square Footage: under 10,000 sq. ft.2_ over 10,000 sq. ft. Number of Stories: I
Sheet metal work to be completed: New Work: 7 Renovation:
HVAC Metal Watershed Roofing Kitchen Exhaust System
Metal Chimney/Vents Air Balancing
Provide detailed description of work to be done:
:05--alitei 13 had �r..c,c-wL JL wiR' If Co,'LI 1\1.e0.) sop�1,.(°I-Pet-urc►.�
A-ao Nk\; -pao j . cf->ea io(QF-twio pe.6 iA-6 ),.a.uttpl,( coLA i t 0
✓A;txl,A Z-6 F\ (s to ice RA4.4, 3 QoInutQ. act) ,Ann .05,6k__
Fees with Building Permit: $25.00 Residential, $50.00 Commercial. Fees for jobs without a Building Permit$6.00 per$1000
�`�q Minimum fees for jobs without Building Permit$50.00 Residential, $100.00 Commercial
INSURANCE COVERAGE:
I have a current liability insurance policy or its equivalent which meets the requirements of M.G.L.Ch.112 Ye JO No❑
If you have checked Yes,indicate the type of coverage by checking the appropriate box below:
A liability insurance policy Other type of indemnity ❑ Bond ❑
OWNER'S INSURANCE WAIVER: 1 am aware that the licensee r►n'q not have.the insurance coverage required by Chapter 112 of the
Massachusetts General Laws,and that my signature on this permit application waivAsthis requirement.
Check One Only
Owner ❑ Agent ❑
Signature of Owner or Owner's Agent
By checking this box ,I hereby certify that all of the detailsiand information I have submitted(or entered)regarding this application are true and
accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be
in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of the General Laws.
Duct inspection required prior to insulation installation:YES NO
Progress Incnnctinns
Hate Comments
Final IncpPPfinn
Pate Comment
Type of License:
By ❑Master
Title ❑ Master-Restricted
City/Town ❑Journeyperson
Signature of Licensee
Permit#
❑Journeyperson-Restricted
License Number:
Fee$ ❑
Check at www macc gnv/dp(
Inspector Signature of Permit Approval
414m,
'� 5 y7'-'2,24t41* klf.4r Est }
Prpject Report
Project Title: Highway Salvage
Designed By: Dwm
Project Date: Wednesday, October 30, 2013
Reference City: Westover AFB, Massachusetts
Daily Temperature Range: Medium
Latitude: 42 Degrees
Elevation: 270 ft.
Altitude Factor: 0.990
Elevation Sensible Adj. Factor: 1.000
Elevation Total Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Elevation Heating Adj. Factor: 1.000
Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Dry Bulb Difference
Winter: 0 0 30 72 31
Summer: 87 71 50 75 24
Total Building Supply CFM: 1,095 CFM Per Square ft.: 1.178
Square ft. of Room Area: 930 Square ft. Per Ton: 351
Volume (ft3) of Cond. Space: 9,300 Air Turnover Rate(per hour): 7.1
°.sE3'"a" t.a:��� -"` `�. � '. � �.�� � ^P� 'g�+, .'3 -wr �,. . :�.�.w .,�eew-..r. ._. ,�i,.tea•.. ,
._-,;:.�_. -_'-_ _. •s�. _� w>_.,.�.... _.._ ..��'� ��. -rla �,'s: x�x�r,�" "tea'. a'u°,�i. �,e,
Total Heating Required With Outside Air: 37,625 Btuh 37.625 MBH
Total Sensible Gain: 23.863 Btuh 96 %
Total Latent Gain: 1,000 Btuh 4 %
Total Cooling Required With Outside Air: 24,863 Btuh 2.07 Tons (Based On Sensible+ Latent)
2.65 Tons (Based On 75% Sensible Capacity)
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\Program Files\Elite\Rhvacw\Projects\-UNTTLO.rhv Wednesday, October 30, 2013, 10:48 AM
t
Y 1
„—, ate t x . : �- '� `'° - �' . , :;,a. r ,w -,_
a u 9.2. h ,r g'- ., ' , -;,,, �. -4 a:,_ .,_ "s _w. � `_
Load Preview Report
Building 930 23,863 1,000 24,863 37,625 493 1,095 1,095
5
System 1 930 23,863 1,000 24,863 37,625 493 1,095 1,095 12x16
Zone 1 930 23,863 1,000 . 24,863 37,625 493 1,095 1,095
1-Sales 500 13,868 400 14,268 25,747 338 637 637 6-6
2-Office 1 250 5,832 400 6,232 4,738 62 268 268 2-7
3-Office 2 180 4,163 200 4,363 7,140 94 191 191 2-6
1
•
C:\Program Files\Elite\Rhvacw\Projects\—UNTTLO.rhv Wednesday, October 30, 2013, 10:48 AM
�' fi+ '�:-' i '7 e ~ -_U, " F r,yT - a ,; "-is .„r ,
F
,' + m=gt °°" - - - m c Jfi `" �
Detailed Room Loads Room 1 - Sales (Average Load Procedure)
EL IL__ ? '._ .t T .6'".� � ' � � _a k-.�At.?``ax z,.A
" _�_ :: a_- -..._ '....s .. _,.. Y'"'__ _ :...�:. ,x`-L- -• ter'-'a,. % ,& -41 i;+t > .�-...F�. x _�'
Calculation Mode: Htg. &clg. Occurrences: 1
Room Length: 25.0 ft. System Number: 1
Room Width: 20.0 ft. Zone Number: 1
Area: 500.0 sq.ft. Supply Air: 637 CFM
Ceiling Height: 10.0 ft. Supply Air Changes: 7.6 AC/hr
Volume: 5,000.0 cu.ft. Required Vent.: 0 CFM
Number of Registers: 6 Actual Winter Vent.: 0 CFM
Runout Air: 106 CFM Percent of Supply.: 0
Runout Duct Size: 6 in. Actual Summer Vent.: 0 CFM
Runout Air Velocity: 540 ft./min. Percent of Supply: 0
Runout Air Velocity: 540 ft./min. Actual Winter Infil.: 0 CFM
Actual Loss: 0.185 in.wg./100 ft. Actual Summer Infil.: 0 CFM
61,.....__, ,_-_,--, -,--_, _,-,---4---1-4_,----z--.-------;-f-----.-T---:i-s=;-------,- ---1-4 ,-.----4.--1-,i---.2._ ,41,--E--- --1-7.,_---z-.....0.-1-7- --„T ----,,--74,„.--rp-tmeic„
N -Wall-13AA-0fc 20 X 10 115 0.304 21.9 2,517 4.4 0 503
E-Wall-13AA-Ofc 25 X 10 210 0.304 21.9 4,596 4.4 0 919
S-Wall-13AA-Ofc 20 X 10 200 0.304 21.9 4,378 4.4 0 876
N -Door-11 J 3 X 7 21 0.600 43.2 907 13.8 0 290
N -Gls-1B-cb shgc-0.78 100%S 64 1.070 77.0 4,931 27.8 0 1,777
E -GIs-1 B-cb shgc-0.78 0%S 40 1.070 77.0 3,082 86.1 0 3,444
UP-Ceil-16A-38 25 X 20 500 0.026 1.9 936 1.7 0 871
Floor-22A-ph 45 ft Per. _-_-- 45 1.358 -_— 97.8 4,400 0.0 0 0
_...........
Subtotals for Structure: 25,747 0 8,680
Infil.: Win.: 0.0, Sum.: 0.0 650 0.000 0 0.000 0 0
People: 200 lat/per, 230 sen/per: 2 400 460
Equipment: 0 2,000
Lighting .__._800 . ....__._.--_- _...... _ _ 2,728
Room Totals: 25,747 400 13,868
C:1Program Files\Elite\Rhvacw\Projects\-UNTTLO.rhv Wednesday, October 30, 2013, 10:48 AM
' <' , ". 'r f g : rte.
ec, 0,
„ ' - I` 4,-14: te` ^4` w r " zs
2. ' >y i C 2 �:_ _tl�w n'"'�rv4,-� = , , - � y x` � __ 'i as '.0 .�d t i ,
_A
Detailed Room Loads- Room 2 - Office I (Average Load Procedure)
Calculation Mode: Htg. &clg. Occurrences: 1
Room Length: 25.0 ft. System Number: 1
Room Width: 10.0 ft. Zone Number: 1
Area: 250.0 sq.ft. Supply Air: 268 CFM
Ceiling Height: 10.0 ft. Supply Air Changes: 6.4 AC/hr
Volume: 2,500.0 cu.ft. Required Vent.: 0 CFM
Number of Registers: 2 Actual Winter Vent.: 0 CFM
Runout Air: 134 CFM Percent of Supply.: 0
Runout Duct Size: 7 in. Actual Summer Vent.: 0 CFM
Runout Air Velocity: 501 ft./min. Percent of Supply: 0
Runout Air Velocity: 501 ft./min. Actual Winter Infil.: 0 CFM
Actual Loss: 0.19 in wg/100 ft. Actual Summer Infil.: 0 CFM
F.- � tcm.__� .�?'.�_" y , > _5..�fs "�� "�" � �� �3 -,"r ,=" � s.;
W-Wall-13AA-Ofc 10 X 10 80 0.304 21.9 1,751 4.4 ' &_.. "
W-GIs-1 B-cb shgc-0.78 0%S 20 1.070 77.0 1,541 86.1 0 350
UP-Ceil-16A-38 25 X 10 250 0.026 1.9 468 1.7 0 1,722
0 436
Floor- ph 10 ft._Per_ 10 1.358 97.8 978 0.0
Subtotals for Structure: 4,738 0 2,508
Infil.: Win.: 0.0, Sum.: 0.0 100 0.000 0 0.000 0 0
People: 200 lat/per, 230 sen/per: 2
400 460
Equipment: 0 1,500
Lighting. 400 1,364
Room Totals: 4,738 400 5,832
C:\Program Files\Elite\Rhvacw\Projects\—UNTTLO.rhv Wednesday, October 30, 2013, 10:48 AM
t&r4Vgr v.:; - r 7 w.sn�w --Y:r - , , -`-fin r�� , *xI 5 r' `" Y.r^ - '
' , s- , �
ad s �- - a ` ` Zt , y °n " `ms . £ 4 ,
te Y k „ ,£r $. .»c tr.'-; * --- __ ---i.- -------4.- . . �7v- ,. -s ,4',.. 'z 7-u c a !_� _
Detailed Room Loads - Room 3 Office 2 (Average Load Procedure
-^ n T f a� :I'LL -a 3K .rt„, rt
�^ �•, - - le-
� .`.,..�..�=..�'-.��:°`_ .«h.e �� <,.�,.,�r, s�-�, -��- ��.�,�.:t � � ate;� ' -
Calculation Mode: Htg. &cig. Occurrences: 1 _ y
Room Length: 18.0 ft. System Number: 1
Room Width: 10.0 ft. Zone Number: 1
Area: 180.0 sq.ft. Supply Air: 191 CFM
Ceiling Height: 10.0 ft. Supply Air Changes: 6.4 AC/hr
Volume: 1,800.0 cu.ft. Required Vent.: 0 CFM
Number of Registers: 2 Actual Winter Vent.: 0 CFM
Runout Air: 96 CFM Percent of Supply.: 0 %
Runout Duct Size: 6 in. Actual Summer Vent.: 0 CFM
Runout Air Velocity: 487 ft./min. Percent of Supply: 0 %
Runout Air Velocity: 487 ft./min. Actual Winter Infil.: 0 CFM
Actual Loss: 0.151 in.wg./100 ft. Actual Summer Infil.: 0 CFM
e, .,,,,. ;.fit, 1, ,. as 4 �`” sx- � '�' x?� a" -4bas- 14,'r.
5 ;"`.. , ... .�...s..e...,.. �._... sa s='. `c_,..�.� �s sc.=: �...,_.�____ ° i.fir. " .+r,-s rf G+ x .
�x s�`'M, d�?:�. : �.,. tea,
N -Wall-13AA-Ofc 18 X 10 160 0.304 21.9 3,502 4.4 0 700
N-Gls-1B-cb shgc-0.78 100%S 20 1.070 77.0 1,541 27.8 0 555
UP-CeiI-16A-38 18 X 10 180 0.026 1.9 337 1.7 0 314
Floor-22A-ph 18 ft..Per_ 18 1.358 97.8 1,760 0.0 0 0
Subtotals for Structure: 7,140 0 1,569
Infil.: Win.: 0.0, Sum.: 0.0 180 0.000 0 0.000 0 0
People: 200 lat/per, 230 sen/per: 1 200 230
Equipment: 0 1,000
Lighting — — - -- —.. 1,364
— - T�__ _ __ — - ___ __ ---
Room Totals: 7,140 200 4,163
C:\Program Files\Elite\Rhvacw\Projects\-UNTTLO.rhv Wednesday, October 30, 2013, 10:48 AM