08-021 (31) City of Northampton September 17, 2003 Page 3 responsibility of The O' Leary Company or myself. Installation of these building components is continuing. The rooftop mounted package HVAC units have been installed at the rooftop level on prefabricated metal roof curbs supplied and installed by The O' Leary Company. 4 . Construction of the hydraulic elevator unit is continuing. All structural elevator vertical rails have been installed and installation of the main hydraulic elevator control unit is ongoing. Construction of the elevator cab platform has begun, however, the cab construction has not yet begun at this time. All elevator components have now been delivered to the job site and it is anticipated that construction of this unit will be ongoing. Please let me know if you have any questions or comments. Sincerely, 7 110r Gerald P. Berson, P. E. City of Northampton September 17, 2003 Page 2 Installation of exterior concrete stoops at grade were also being installed at each building entrance at the time I visited the job site. 2 . All reinforced concrete foundation and interior slab construction for the new building has previously been completed as well as all structural steel erection and the standing seam metal roofing system. At the main building entry, steel framing for the canopy structure has been completed and architectural standing seam metal panel roofing was being installed at the time I visited the job site. Erection of the exterior insulation finish system (EIFS) for the North, East and South exterior building walls is now basically complete. Finish sealant installation at the base of the EIFS system remains to be completed around the perimeter of the building. All other exterior wall construction is also now complete including the 4-foot high masonry kicker walls around the perimeter base of the building as well as the Butler Style Wall building panels at the exterior West wall . All exterior wall window units have also now been installed with appropriate sealant. 3 . Interior building finish is continuing. All metal stud and gypsum board partitions have now been erected. Gypsum board material has been finished with finish coat painting completed at the second floor and prime coat painting at the first floor. All rough in plumbing, electrical and mechanical items to be enclosed within the partitions also appears to be complete at this time. Installation of the metal grid system for the hung ceiling at the second floor has also now begun and is approximately 15% complete. Erection of interior metal door and window frames has also now begun and is approximately 30% complete. It should be noted that all plumbing, mechanical, telephone and alarm system design and installation has been contracted separately by the owner and is not under the THE 111111111111111111111111111111111111111 ENGINEERING Pi k./ PLANNING G ' ` O'LEARY CONSTRUCTION IIIIIIIIIIIIIICOMPANY SINCE 1955 L D September 17, 2003 _ ---�'n-G' City of Northampton Department of Building Inspections 212 Main Street Northampton, MA 01060 RE: New Building for Paradise Realty Partners 766 North King Street, Northampton, MA Construction Report No. 10 Gentlemen: Since my last report on September 4, 2003, the following construction has been completed and except as noted found to be in compliance with applicable codes and construction documents for this project: 1 . Site work operations are continuing. Installation of the storm drainage piping at the base of the embankment on the West side of the site has been completed, however, gravel backfill and dress-up at the base of the embankment remains to be completed. As previously noted, the masonry retaining walls at the Northwest and Southwest corners of the site have been completed. Dress-up of the embankment at the Northwest corner of the site remains to be completed, however, all other embankments have been completed and seeded. Final dress-up of all embankments may be required prior to project completion. The new electrical transformer has now been installed on the precast concrete pad at the Southeast corner exterior of the building. Primary and secondary electrical power wiring has now been installed and connected to the main interior electrical service panel along with sub-panels and meters for tenant use. Installation of the below grade sanitary septic tank was being completed at the time I visited the job site. It is my understanding that this work is being completed under separate contract by the owner and not under the responsibility of The O' Leary Company or myself. THE O'LEARY COMPANY, INC. <BUTLER> MAIL ADDRESS: P.O. BOX 377, SOUTHAMPTON, MA 01073-0377 OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073 BUILDER TELEPHONE 413 527-1360 • FAX 413 527-2499 • WEB SITE www.olearyco.com