08-021 (30) City of Northampton September 4, 2003 Page 3 now been delivered to the job site and erection has begun for those partition areas that have been finished. It should be noted that all plumbing, mechanical, telephone and alarm system installation has been contracted separately by the owner and is not under the responsibility of The O' Leary Company or myself. 4 . It is my understanding that the site water service connection to the public line has not yet been made. 5 . Construction of the hydraulic elevator unit has now begun. All structural elevator vertical rails have now been installed and bolted to the masonry inserts per design. Please let me know if you have any questions or comments . Sincerely, Ir%` S Gerald P. Berson, P.E. City of Northampton September 4, 2003 Page 2 interior concrete slabs have been installed per plans. All masonry wall construction has also been completed which includes the interior elevator shaft walls and the exterior 4-foot high split faced block kicker walls around the building perimeter on three sides. 2 . Also as previously reported, erection of all structural steel components for the Butler preengineered metal building system has been completed as well as the standing seam metal roofing system with fiberglass insulation. Miscellaneous perimeter metal building trim at the roof line remains to be completed after exterior wall insulation system is completed. All prefabricated metal roof curbs for rooftop mounted HVAC units have also been installed and meet Butler roof installation specifications. Erection of the exterior insulation finish system for the exterior walls on the North, East and South sides of the building is continuing and is approximately 75% complete. Erection of the prefabricated Butler Style Wall panel system on the West exterior wall has also been completed and the new window unit in this wall system has been installed. Installation of aluminum frame and glass window units at both the first and second floors of the building has now begun and is approximately 50o complete. Finish caulking and sealant is being completed as window unit installation progresses . 3 . On the interior of the building, erection of all metal studs for interior partitions is now complete. Rough in plumbing and electrical work enclosed within the partitions is also basically complete. Installation of all fiberglass insulation has also been completed on the interior side of all exterior perimeter building walls. All appropriate fire stopping within the exterior walls also appears to be completed. Gypsum board erection and finishing for all interior partition areas has now begun and is approximately 75% complete. Metal door frames for interior doors have THEIIIIIINfllfflli111gtflIIINIIHINIII F—C71/ARY ENGINEERING C'�G IIIIAIIilillicoM�j���/ PLAN- / CONE 1955 ION �' SINCE 1955 _ 77--;- September 4, 2003 F' �c' (U l_ r �- - ` {t y Depart f Northampton %`�; ' - `j Department "' ' ' of Building 1 212 Main g Ins ..-1 Street peCtio Northa ns - ,,I r„ ;r os mpton. MA 01060 .c r`€f x i. a �3..<;r�?���__► RE: New Buildin 766 North Kg for Paradise 9 Street Realty Partners Construction Report Northam Na, g Northampton No. MA Gentlemen; Since my last construction has been been on August 20, 2003 fonstru construction with applicable the follow ' this project; PAlicable code except as noted lfoun and construction do found to be 1 . Site currents work operations reported, installation are Continuing. As plastic storm of the below Previously and backfilled water detention grade prefabricated drainage chamber has been piping up to grade. Installation completed embankment g and gravel backfill at of the storm embankment on the West side of the base including connection the site of the and tie in to the is also nearing masonry retaining building roof r the storm drain g walls at drainage system. leaders corners of the the Northwest So with to site have The topsoil material , now been completed and Southwest Northwest corner of Dress-up and backfilled the site up °f the embankment Also as remains to be at the Previously noted, completed, pad has been installed d, the precast Underground electrical Southeast corner transformer has now been installed conduit for the Corner of the site. fled primary power power wiring has been tO the transformer supply installed at this pad. It is time, No primary being my understanding that the sanitary se bwner and not installed under separate Ptic Com under the he ' system is Pant' or myself, responsibility of The by the O'Leary No additional last d concrete work has port, All reinforced been completed pleted since my \.UTLE� THE O�LEARY foundation work and COMPANY INC. MAIL ADDRESS: P. BUILDER OFF/CE O. sox 377, ADDRESS: SOUTHAMPTON, i'Ef.EPHDNE 413 376 COLLEGE HIGHWAY, E 1a , SOU p377 3 527-1360 • FAX 413 527-2499 UTE 1O SOUTHAMPTON. co O1Qj3 MA WEB www.otearyco,com