08-021 (29) . . 5,e,l• '44'''')',;'''1,4‘..,',.;,, v,:4:x.
I
. 117,r
..,
, 1
Z'
, A."}-i''' - ' -i4.!'.-,..4',4,,,''''''',-, LI— •
__
,,,...,.... , ,
—
, .,,t, , 1 Z
. 1., , .
1-,„,:.
c -
4 %
1- 1
iu tu . 1
() A U
(_) y, i
( ()
, \ \
■
, 1
1 '
7,.....,
C)k) 1
q4 1
'1
Qs: vr) (1)
—I
0
A) c)
illns
; —
i
1-1
Cottman Transmission Center
, ,Mil
s 245 N. King Street /�ID
Cottman® Northampton, MAO 01060
TRANSMISSION 413.585.8688
c -u f
Fax: 413.586.9185
i F,.) CL L.Ii ;v [t - f
I f trod,
www.cottman.corn ! ` I '• , CS OF LOCATI.QS COAST 1-COAST!
i _ v ( , t\
N AN a. • . IP :
September 7, 2003 , i \': ' r
DEPT LING IN rC1iJ i t` 1 'ar p - ° L
ti ti bleTUN .+A :j Q :J 3
To Anthony L. Patillo, CBO r
„,....----..-m-
.
From: John Hunter
Re: Cottman Transmission Air Compressor Placement
Tony,
Pursuant to our conversation last Friday I'd like to have your approval for the location of the Air
Compressor to be installed in the Cottman Transmission Centers storage area this week. As
requested, below are the specifications for the compressor and dimensions of storage area. My
understanding is that with the 4"wall /barrier at the top of the stairway this location meets code.
Please let me know if you have any additional questions. I look forward to hearing from you.
Sincerely,
lili' --4\t-----
Jo L. Hunter
Compressor
Ingersol Rand
230 Volt, 28 Amp, single phase, 5 hp, 80 Gallon tank, 175 PSIG
Height 68", Width 38", Depth 22"
Storage Area
Total Height 89", Length 18', Width 6'4", Floor of storage area to garage floor level , 33".
Hunter Development Group Inc.
9/7/2003
/ 3- 73
ELPHI
CONSTRUCTION INC
September 25, SEP
Se � 2003 I
p
DEPT OF Sk}ILD{"
Mr. Anthony L. Patillo, CBO n�Ta, - ---1
Building Commissioner
City of Northampton
212 Main Street, Room 100
Northampton, MA 01060-3189
RE: New England Deaconess Association
Rockridge Project, Northampton, MA
Dear Mr. Patillo,
Thank you for taking the time to meet with our Project Team on Wednesday,
September 24, 2003. We appreciate the opportunity to review this project with
you early in the process. I am including several of my business cards for you and
your staff as requested.
Feel free to call me anytime if there are any questions or concerns. We are
looking forward to a successful project.
Sincerely,
Jacob G. Simmons
President
Encl.
2250 Main Street, Concord, MA 01742 ! PHONE 978.371.99391 FAX 978.371.4944 I www.delphiconstruction.net
City of Northam
September 30, 2003n
Page 3
is also now
supported w complete including
It should be fixtures and mechanical installation on °f ceiling
and e noted ents,
alarm that
contracted syste all plumbing,
cont m deli
responsibility separately design and
has telephone
Installation of The owner been
however, n of finish O'Leary Company ors not under the
drain Itplu plumbing observed hbave fixtures has not
n units require ed that several yet be
quire b n delivered begun,
drain n t ' modification floor to the job
including ion, Installation clean-outs and
g swit Prior to final
floor is ches and n °f finish electrical fixture
exit continuing outlets at t ical f.
lighting g including he first and ixtures
at
the rooftop mounted and signag in As llation second
the rooftop package HVAC previously emergency
supplied by p level on prefabricated units have ben reported,
been y The 0' ricat installed
electrical the rooftop y" Gas Service curbs
units connections, op unit piping has
s along
4 Construction have not yet been activated understanding steel.with finish
Elevator shaft°f the eel °r tested, that these
ator shaft hydraulic elevator unit
the hydraulic been completed is continuing.
anticipated components are platform has l unit . Construction
with
ion
also truct '
for the that elevato on the Job g and all
next r construction site. It is
elevator several weeks.
shaft will not Finish enclosure wi11 be Conti
construct ' ruing
have been
construction has been completed completed until elevator t the
d elevator °r cab
Please let me know if you r door units
Sinc ely, have any questions or comments.
Gerald 's
P. Berson, `
P:E,
City of Northampton
September 30, 2003
Page 2
All exterior reinforced concrete stoops and pads have now
been poured along with the concrete bases for the exterior
lighting poles .
All site utilities have also now been completed including
installation of the below grade propane tank and the new
electrical transformer. All exterior tenant gas service
meters have been installed, however, final connection to
the gas piping serving the rooftop mounted package units
has not yet been completed on the exterior of the building.
2 . As previously reported, all reinforced concrete foundation
work and interior slab construction for the new building
has been completed as well as all structural steel erection
and standing seam metal roofing. At the main building
entry, all steel framing for the entry canopy has been
completed as well as the architectural standing seam metal
roof panel installation.
Erection of the exterior insulation finish system (EIFS)
for the North, East and South exterior building walls is
now complete along with finish sealant at the base of the
EIFS system. The Butler Style Wall exterior building
panels on the West wall have also been completed as well as
the 4-foot high masonry kicker walls around the base of the
building on the North, East and South sides. All exterior
wall window units have also been installed with appropriate
sealant. Finish painting of all exterior wall systems is
now approximately 99% complete.
3 . Interior building finish is continuing. All metal stud and
gypsum board partitions have now been erected and finish
coat painted on both the first and second floors . Instal-
lation of vinyl wall covering is continuing at the second
floor tenant areas . All rough in plumbing, electrical and
mechanical items enclosed within the partitions also
appears to be complete. Installation of the metal grid
system for the hung ceiling at the first and second floor
THEIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIII ENGINEERING ry Fjl��
O'LEARY CPLANNING
ONSTRUCTION
IIIIIIIIIIIIIICOMPANY SINCE 1955
September 30, 2003
City of Northampton _-
Department of Building Inspections
212 Main Street
Northampton, MA 01060
RE: New Building for Paradise Realty Partners
766 North King Street, Northampton, MA
Construction Report No. 11
Gentlemen:
Since my last report on September 17, 2003, the following
construction has been completed and except as noted found to be
in compliance with applicable codes and construction documents
for this project:
1 . Site work operations are continuing. Installation of the
storm drainage piping at the base of the embankment on the
West side of the site has been completed, however, gravel
backfill and dress-up at the base of the embankment remains
to be completed. As previously noted, the masonry
retaining walls at the Northwest and Southwest corners of
the site have been completed. Dress-up of the embankment
at the Northwest corner of the site remains to be
completed, however, all other embankments have been
completed and seeded. Final dress-up of all embankments
may be required prior to project completion.
Installation of the below grade sanitary septic tank and
piping has now been completed and backfilled up to grade.
This work has been completed under separate contract by the
owner and not under the responsibility of The O' Leary
Company or myself. This installation required some
modification of the below grade storm water piping by The
O' Leary Company in the vicinity of the new septic system
installation. Although I did not inspect the modified
installation, The O' Leary site work superintendent had
inspected the installation and verified that all work was
properly completed.
THE O'LEARY COMPANY, INC.
CUTLER, MAIL ADDRESS P.D. BOX 377, SOUTHAMPTON, MA 01073-0377
OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073
BUILDER TELEPHONE 413 527-1360 FAX 413 527-2499 WEB SITE www.olearyco.com
N �
City of Northampton
October 31, 2003
Page 3
With the completion of the above noted items along with
local final inspections, this building will be complete and
occupyable and it is recommended that an occupancy permit
be issued.
Please let me know if you have any questions or comments.
Sincerely,
Gerald P. Berson, P. E.
City of Northampton
October 31, 2003
Page 2
flooring has also now been completed including ceramic
tile, vinyl tile and carpeting in those specified areas .
Vinyl base material has also been completed except for one
noted office area. All interior doors, door frames and
hardware have also now been installed. All miscellaneous
interior finish trim and cabinet work has also now been
completed.
Installation of all electric work including finish electric
items, emergency exit lighting and exit signage is also now
basically complete. Several recessed lighting cans in one
office area remain to be installed and are not yet on the
job site.
Installation of finish plumbing fixtures is now
approximately 80o complete and was ongoing at the time I
visited the job site. All HVAC equipment has now been
installed and the system appears to be operational . All
exterior building mounted tenant gas meters have also now
been installed and the system is connected to the under-
ground propane supply tank. Installation of the fire alarm
system which includes smoke detectors in the common areas
also now appears to be complete. It should be noted that
all plumbing, mechanical, telephone and alarm system design
and installation has been contracted separately by the
owner and is not under the responsibility of The O' Leary
Company or myself.
4 . Construction of the hydraulic elevator unit also now
appears to be basically complete. All elevator controls
and equipment appears to be complete, however, it is not
known at this time if the final State elevator inspection
has been completed.
THE IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ENGINEERING fez"
O'LEARY
CONSTRUCTION
IIIIIIIIIIIIIICOMPANY SINCE 1955
t;
October 31, 2003
City of Northampton
Department of Building Inspections
212 Main Street
f I,
Northampton, MA 01060
RE: New Building for Paradise Realty Partners
766 North King Street, Northampton, MA
Construction Report No. 13
Gentlemen:
Since my last report on October 14, 2003, the following
construction has been completed and except as noted found to be
in compliance with applicable codes and construction documents
for this project:
1 . Site work operations under The O' Leary Company
responsibility is now basically complete. All asphalt
pavement has been completed in the parking lot and driveway
areas along with striping. Installation of accessible
parking space signage remains to be completed. Vegetation
has now been established for the majority of the embankment
along the South and East sides of the site. Minor dress-up
of the embankment may be required in the spring due to
winter conditions . All site lighting poles have also now
been erected. All site utility installation is also
complete. All miscellaneous exterior concrete pads and
stoops are also now complete.
2 . As previously noted, construction of the building exterior
shell has been completed including all exterior wall
finish, painting, caulking and sealant. At the time of my
site visit, the window sub-contractor was installing
additional caulking and sealant around the exterior windows
for the entire perimeter of the building.
3 . Interior building finish is also nearing completion. All
interior partitions have also been completed including
finish paint and installation of vinyl wall covering in
those designated areas . Installation of the suspended
ceiling system is also now complete including ceiling
supported light fixtures and HVAC vents . All finish
THE O'LEARY COMPANY, INC.
<BULLER MAIL ADDRESS: P.O. BOX 377, SOUTHAMPTON, MA 01073-0377
OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073
BUILDER TELEPHONE 413 527-1360 • FAX 413 527-2499 • WEB SITE www.olearyco.com
14 4
City of Northampton
October 14, 2003
Page 2
includes ceiling supported light fixtures and HVAC vents.
Installation of finish electrical items including lighting,
emergency exit lighting, smoke detectors and exit signage
is also nearing completion. All HVAC equipment has been
installed and installation of finish vents for the
individual rooms is nearing completion. Plumbing fixtures
have been delivered to the job site, however, finish
plumbing installation has not yet begun. Installation of
miscellaneous interior finish cabinet work and trim is
continuing and is approximately 75% complete. Vinyl
flooring installation has been completed in those
designated rooms and carpet installation for the remaining
rooms is approximately 70o complete. Vinyl base
installation remains to be completed throughout the
building.
It should be noted that all plumbing, mechanical, telephone
and alarm system design and installation has been
contracted separately by the owner and is not under the
responsibility of The O' Leary Company or myself.
4 . Construction of the hydraulic elevator unit is continuing.
Construction of the elevator shaft enclosure is also
nearing completion. The elevator door frames have been set
at each floor and the fire rated gypsum shaft partitions
have been finished. Construction of the elevator cab unit
within the shaft is also nearing completion, however, final
inspection by the State has not yet been scheduled.
Please let me know if you have any questions or comments.
Sincerely,
Gerald P. Berson, P.E.
(1 y_ov
_ E
THEIIIIIIIIIIIIIIillllllllllllllllllllllll ENGINEERING i j, !
•
O'LEARY PLANNING I!! ; ; I;
CONSTRUCTION I I '' ' " 11
IIIIIIIIIIIIIICOMPANY SINCE 1955 1 J I OCT 1 6 , r:ic3 �' 1 I
i L
October 14 2003
DEPT OF BUILD !!IS°EC F^v$�
NORTi4aL4PiON,
City of Northampton
Department of Building Inspections
212 Main Street
Northampton, MA 01060
RE: New Building for Paradise Realty Partners
766 North King Street, Northampton, MA
Construction Report No. 12
Gentlemen:
Since my last report on September 30, 2003, the following
construction has been completed and except as noted found to be
in compliance with applicable codes and construction documents
for this project:
1 . Site work operations are now nearing completion. All
asphalt pavement has now been installed in the parking lot
and driveway areas as well as the sidewalk areas at the
street front . Dress-up of the soil embankments along the
West side of the site has also been completed as well as
the drain pipe and gravel backfill along the base of the
embankments. The concrete protection pad over the storm
drainage pipe at the rear of the building adjacent to the
septic system was being installed at the time I visited the
job site. Installation of the below grade propane tank
serving the building heating system has also now been
completed and connected to the building gas piping system.
All other site utilities had previously been completed.
2 . Construction of the building exterior shell is now complete
including finish painting and caulking and sealant
installation as required.
3 . Interior building finish is continuing. All metal stud and
gypsum board partitions have been erected and finish coat
painted on both the first and second floors . Installation
of vinyl wall covering for the second floor areas is also
complete. All rough in plumbing, electrical and mechanical
items enclosed within the partitions is also complete.
Installation of the suspended ceiling system has also now
been completed on both the first and second floor. This
THE O'LEARY COMPANY, INC.
CBUTLE5> MAIL ADDRESS: P.O. BOX 377, SOUTHAMPTON, MA 01073-0377
OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073
BUILDER TELEPHONE 413 527-1360 FAX 413 527-2499 WEB SITE www.olearyco.com
W06-04
■\.)'■
l UNICIPAL WATER AVAILABILITY
E r n Northampton Water Department
237 Prospect St.
c ,,,C� ,ticn ( tnS Northampton, MA 01060
10, 587-1098
Location: 766 North King St.
Inquiry Made By: David Thurber, O'Leary Co. , College Highway, Southampton, MA
413-527-1360
Date of Inquiry: May 20, 2003
Municipal Water Main in Front of Location: Yes x No
Size of Water Main: 6" Material: Cast Age: 1926
Approximate Street Pressure: 110 ApproximatePSl
Size of Service Connection: 1
Comments: The Water Department cannot guarantee adequate water pressure during peak
demand times at elevations above 320 feet.
A corresponding "water entrance fee" shall be paid prior to making any connection to the
municipal water system. Arrangements of such installation shall be made with the Northampton
Water Department with a minimum of 5 working days notification. All work shall conform to
ton Wat epartment pe j. ications.
Charles Borowski,
Superintendent of Water
cc: Ned Huntley, Asst. City Engineer
Anthony Patillo, Building Inspector