Loading...
08-021 (28) City of Northampton August 20, 2003 Page 3 has begun at the second floor level and was approximately 20o complete at the time I visited the job site. No finishing has begun at this time. Installation of wood blocking has also been completed at both the first and second floor and all wood blocking materials were noted to be fire retardant pressure treated. It should be noted that all plumbing, mechanical, telephone and alarm system installation has been contracted separately by the owner and is not under the responsibility of The O' Leary Company or myself. 5 . It is my understanding that the site water service installation and underground electric power service will not be installed for several weeks . 6. Components for the elevator installation have now been delivered to the job site, however, construction of the elevator unit has not yet begun. Please let me know if you have any questions or comments . Sincerely, o Gerald P. Berson, P.E. City of Northampton August 20, 2003 Page 2 finished. All under slab plumbing and electrical conduit has been stubbed up above finished slab level at the first floor. All masonry wall construction has also been completed which basically includes the interior elevator shaft walls and exterior 4-foot high split-faced block kicker walls around the building perimeter on three sides . 3 . Erection of all structural steel components for the Butler preengineered metal building system has been completed along with the building bracing system. Installation of the standing seam metal roofing system with fiberglass insulation has also been completed along with prefabricated metal roof curbs to support the rooftop package HVAC units . Perimeter metal trim at the roof line remains to be completed after exterior wall system installation. Also as previously noted, erection of the exterior 6-inch steel studs to support the exterior insulation finish system (EIFS) on the North, East and South walls has been completed along with rough framing for the window and door units . Installation of fiberglass faced gypsum sheathing and foam board has also now been completed on those walls . Mesh reinforcement and base coat installation for the EIFS finish system has also now begun and is approximately 35% complete. Erection of the prefabricated Butler Style Wall panel system on the West exterior wall has also been completed at this time. 4 . On the interior of the building, erection of all metal studs for interior partitions is basically complete. Rough in plumbing and electrical work to be enclosed within the partitions also appears to be basically complete. It is my understanding that close-in inspections by the local inspectors have been completed for partitions at both the first and second levels . All fiberglass insulation has also now been installed on the interior side of the exterior perimeter building walls . Gypsum board erection r V l THEIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ENGINEERING O'LEARY PLANNING CONSTRUCTION IIIIIIIIIIIIIICDMPANY SINCE 1955 August 20, 2003 City of Northampton l j Department of Building Inspections "-`r, 212 Main Street Northampton, MA 01060 I I-- RE: New Building for Paradise Realty Partners 766 North King Street, Northampton, MA Construction Report No. 8 Gentlemen: Since my last report on August 7, 2003, the following construction has been completed and except as noted found to be in compliance with applicable codes and construction documents for this project: 1 . Site work operations remain basically as previously reported. All storm drainage piping and the below grade prefabricated plastic detention chamber has been installed and backfilled up to grade. Some minor slippage of the embankment at the Northwest corner of the site was noted and will require dress-up prior to project completion. Finish grading around the perimeter of the building and parking lot areas remains to be completed. The masonry retaining wall at the North property line has been completed, however, the similar retaining wall at the South property line remains to be installed. Although the precast concrete transformer pad has been installed on the exterior of the Southeast corner of the building along with secondary electrical conduit extending into the building, no primary or secondary electrical service wiring has been pulled at this time. A temporary electrical service has been stubbed up on the interior of the first floor and remains in place. It is my understanding that the sanitary septic system is being designed and installed under separate contract by the owner and not under the responsibility of The O' Leary Company or myself. 2 . As previously reported, all reinforced concrete foundation work and interior concrete slabs have been poured and THE O'LEARY COMPANY, INC. <BUTLE> MAIL ADDRESS: P.O. BOX 377, SOUTHAMPTON, MA 01073-0377 OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073 BUILDER TELEPHONE 413 527-1360 • FAX 413 527-2499 WEB SITE www.olearyco.com