08-021 (23) r.. City of Northampton June 26, 2003 Page 2 reinforced concrete slab on grade has not yet been poured. It is my understanding that all plumbing work for the new building is being completed under separate contract by the owner and not under the responsibility of The O' Leary Company. 3 . The Butler preengineered metal building system has now been delivered to the job site. It is my understanding that a full building permit has now been received from the City of Northampton and structural steel erection has begun. All structural steel columns, beams, wall girts and roof purlins to support the roof structure have now been erected and bolted in place. Installation of the structural bracing system for the perimeter shell of the building is continuing. All structural steel column base plates line up properly with anchor bolts with only minor modifications to the base plates necessary for proper steel alignment. Structural steel columns and beams to support the second floor level have not yet been erected. The structural steel bar joists for the second floor framing have not yet been delivered to the job site. Construction of the masonry elevator shaft enclosure has now begun and is approximately 50% complete. Installation of steel inserts and solid masonry supports for elevator rail framing appears to be proceeding properly. 4 . At the exterior of the Southeast corner of the new building, installation of the precast concrete transformer pad has been completed as well as secondary electrical conduit from the pad into the new building area. No primary electrical conduit has been installed at this time and no electrical service wiring has been pulled. No other site utility construction has been completed at this time. Please let me know if you have any questions or comments. S 'Ecerely, P G-ral• P. Berson, P.E. � r r0- THEIIIIIIIIIllIIIIIIIIIII!IIIIIIIIIIIIIM ENGINEERING O'LEARY CONSTRUCTION IIIIIIIIIIIIIICOMPANY SINCE 1955 June 26, 2003 l�ni 2.N.: City of Northampton 4 1 �. '1 1 , Department of Building Inspections _J 212 Main Street C1prtt tt {1 11 ,p 1r1 ',1 1 ;tl,J Northampton, MA 01060 "i` _ RE: New Building for Paradise Realty Partners 766 North King Street, Northampton, MA Construction Report No. 4 Gentlemen: Since my last report on June 9, 2003, the following construction has been completed and except as noted found to be in compliance with applicable codes and construction documents for this project: 1 . As previously noted, all site clearing and grading for the new building and parking lot area has been completed. Installation of the site storm drainage piping at the base of the embankment along the West property line remains delayed until stabilization of the embankment has been completed. At the Northwest corner of the site, the embankment will require stone stabilization to direct ground water to the new drainage piping to be installed at the base of the embankment along the West property line. At the North property line, construction of the split faced masonry landscape retaining wall is now basically complete. Installation of a similar retaining wall to be installed along the South property line has not yet begun. 2 . Also as previously noted, installation of the reinforced concrete footings, foundation walls and column piers for the new building as well as the elevator shaft have been completed and backfilled up to grade. All anchor bolts have been set in preparation for structural steel erection. Prior to backfill, styrofoam insulation has been placed on the interior face of all exposed perimeter foundation walls . All under slab plumbing and electrical service conduit have also been installed on the interior of the new building and stubbed up above finished slab level . The interior THE O'LEARY COMPANY, INC. MAIL ADDRESS: P.O. BOX 377, SOUTHAMPTON, MA 01073-0377 OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073 BUILDER TELEPHONE 413 527-1360 FAX 413 527-2499 • WEB SITE www.olearyco.com