Loading...
08-021 (14) THE O'LEARY COMPANY, INC. Mr. Anthony Patillo Page 2 April 16, 2003 8. A copy of a letter dated February 3, 2003, from the Planning Board Secretary, Angela Dion, stating that she would record the order of conditions once the ten day appeal period was expired. (I do not have a copy of this receipt,but I assume the Planning Board does.) Although the final construction plans for the building are still being worked on, we are hoping to be allowed to work on "foundation only" at this time for the project to stay on schedule. The floor plans are complete, and the remaining architectural, mechanical, and fire alarm drawings are getting underway. There will also be an energy code compliance narrative submitted. We would like to start our foundations the week of April 28 if this timeframe works for you. The final septic system design is being worked on by Tim Maginnis, since the location of the system has moved on the site to accommodate the last round of changes. I expect to have copies of this design soon and will be able to pass them along to you or others as needed. Let me know if you have any questions at this time, and I will be in touch with you if I don't hear back from you first. Thanks for your consideration. Very truly yours, THE O'LEARY COMPANY, INC. Gordon Hutchinson Senior Project Manager lmk Enclosures THEIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ENGINEERING O'LEARY CONSTRUCTION IIIIIIIIIIIIIICOMPANY SINCE 1955 April 16, 2003 Mr. Anthony Patillo Building Commissioner City of Northampton Municipal Building 212 Main Street Northampton, MA 01060 Re: Paradise Realty Dear Tony: Enclosed are the following items for your use to process our request for a building permit on this project: 1. Building permit application (five pages) dated April 15, 2003. 2. Workers compensation insurance affidavit dated April 15, 2003. 3. Construction control document dated April 15,2003. 4. Check No. 021159 in the amount of$3,385.80 dated April 15, 2003. Also attached to the check is the worksheet on how the permit fee was calculated. 5. Three sets of site plans SPR-1 through SPR-6 by the Berkshire Design Group, Inc., all revised and dated April 7, 2003. 6. Three sets of building plans by The O'Leary Company including a cover sheet with code review, floor plans A101 and A102,building elevations on A104, a progress print of wall sections on A106 and A107, and foundation plans S101 through S106 with all plans having an issue date of April 15, 2003. 7. A copy of the receipt dated April 2, 2003, for recording the Planning Board decision on this project at the Hampshire County Registry of Deeds. THE O'LEARY COMPANY, INC. BUTLER MAIL ADDRESS. P.O. BOX 377, SOUTHAMPTON, MA 01073-0377 c> OFFICE ADDRESS: 376 COLLEGE HIGHWAY, ROUTE 10, SOUTHAMPTON, MA 01073 BUILDER TELEPHONE 413 527-1360 . FAX 413 527-2499 • WEB SITE www.olearyco.com