Loading...
06-039 (5) A, s A .. 4 CONSTRUCTION CONTROL FIELD INSPECTION REPORT Project: Zoe Senior Retirement Community SAGE ENGINEERING&CONTRACTING,INC. Job Location: 345 Haydenville Road 199 SERVISTAR INDUSTRIAL WAY, SUITE 2 Northampton,MA 01060 WESTFIELD, MASSACHUSETTS 01085 Inspection Date: 11-05-2013 (413)562-4884 Time: 11:00 AM to 2:00 PM Sage Job Number: 0482-04-13 Building Permit No: BP-2013-1095 WEATHER: Sun,62 ° EST. %OF COMPLETION: 15% CONSTRUCTION SUPERVISOR: Ed Fortini,Sage Engineering&Contracting, Inc. PRESENT AT SITE -Sage Engineering&Contracting, Inc. -Waldo Construction(Site Sub Contractor) -McCain and Sons(Plumbing Sub Contractor) -Gustafson(Electrical Sub Contractor) -Warehouse Mechanical(Fire Protection Sub Contractor) -Staruk Inc(Framing Sub Contractor) Equipment: 2 x Lull 844C -Cat 12H Grader -Ford Simon-RD -Mobile Office Trailer -Cat 330 Excavator -(3)Portable Restroom Facilities -Cat 312 Excavator -Storage Container -Sage Storage Trailer -Snorkelift tb42 -JLG Lift RSC-600 WORK IN PROGRESS - 1st floor rough framing of bearing walls and partition walls west of gridline 6.5 - 2nd floor trusses and deck is being installed west of gridline 6.5 - Fine grading of parking lot and driveway - Rough electric on 3rd floor east of gridline 6.5 - Rough plumbing 3`d floor east of gridline 6.5 - Fire protection rough 3'd floor east of gridline 6.5 WORK COMPLETED SINCE PREVIOUS INSPECTION - Phase 1 exterior windows installed - Temporary doors installed at exits - Temporary lighting installed on 1st,2nd and 3rd floors - Waste and vent lines completed east of gridline 6.5 - Fire line from storage tank to building pressure tested - Roof has been shingled east of gridline 6.5 - Bathroom exhausts duct work have been roughed east of gridline 6.5 OBSERVATIONS Work in Progress Is In Compliance With Plans&Specifications. INFORMATION OR ACTION REQUIRED COMMENTS INSPECTION BY: ,,,_1 :4141( ENGINEER: I ris Nikolaidis Frank DeMarinis, P.E. DATE: 1 +5-2013 DATE: 11-05-2013 .." , 4 .0.01.400%.,..f WO.UM...--4.11-100111MINAPNIMPINK..,„., . .......... ..........pmetwamo**RMITRAml.a.rcem.a..........11110.1... - SAGE ENGINEERING AND CONTRACTING, INC. DESIGN-BUILD DEVELOPMENT, ARCHITECTURAL ENGINEERING, AND CONSTRUCTION MANAGEMENT November 5th , 2013 Louis Hasbrouck, Building Commissioner 1.I Li Nov 7 2013 City of Northampton 21 2 Main Street Electric, Plurnoinc d i Northampton, Ma 01060 h� ,r, ,,r, ons RE:Zoe Senior Retirement Community, 345 Haydenville Road, Northampton, Ma SAGE Project No. 0482 City of Northampton Building Permit No: BP-2013-1095 Dear Mr. Hasbrouck: On behalf of Chakalos Investments, Inc., please find the enclosed Construction Control Field Inspection Report dated I 1 -05- 13 as required by The 2009 International Building Code and the Massachusetts State Amendment to the 2009 International Building Code for your reference on the existing project in progress named above. We are available at your convenience to review the inspection reports, answer any questions or concerns you may encounter regarding this project. Sincerely, Elias-Dimitris Nikolaidis Junior Engineer SAGE ENGINEERING CONTRACTING, INC. 199 SERVISTAR INDUSTRIAL WAY-SUITE 2 WESTFIELD, MASSACHUSETTS 0I 085 TEL: 413-562-4884 FAX: 4 13-562-4899 PAGE I OF I www.sage-Ilc.com