38A-144 36. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks
are engineered for post attachment supporting a railing. Lateral attachment is required for each deck
per section 502.2.2.3.
37. Smoke and CO detectors as required. 780 CMR R314 and R315.
a. Smokes in each bedroom,within 10'of a bedroom door, and at the bottom of a stair leading to
a finished floor above.
b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the
mechanical room) Except if there are no fossil burning fuels.
c. Heat detector in attached garage, and other large unfinished unconditioned spaces.
38. Closets beneath stair which have doors must be drywalled with%".780 CMR R302.7
39. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of
ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in
an accessible place. It must be insulated,gasketed, and secured in place.
Relevant items must be submitted to the building department for approvals before inspections and or
Certificates of Occupancy can be issued.
Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday
through Friday,8:30 am to 4:30 pm,excepting we close for walk-ins at 12:00 noon on Wednesdays. My email
address is: cmiller @northamptonma.gov
Thank you for your cooperation on these ers.
uck Miller
City of Northampton
Assistant Commissioner and Zoning Enforcement
more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails
must be continuous and returned to the wall if not to newel post.780 CMR R311.7.
22. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than
30" above floor or grade within 36",4"sphere rule. 780 CMR R312.1.
23. Educate the plumber and electrician about maximum notch and hole sizes, and placement.780 CMR
R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge,
In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes
in joist are a maximum 1/3 the depth not closer than 2"from the top or bottom or to any other hole.
Notches are different.
24. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition
requires a 16 GA 1 1/2" strap across the area and 6" beyond each side with 8-10nd nails. 780 CMR
R602.6.1
25. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen,
and require 3' clearance from windows.780 CMR M1502.3
26. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780
CMR M1502.4.3
27. Dryer duct maximum equivalent length is 25' less 5' per 90°elbow or per manufacturer's specs.780
CMR M1502.4.4.1, no screwed connections.
28. Markup air is required for any exhaust hood of 400 CFM or more.780 CMR M1503.4
29. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work
maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors. 2009 IECC
402.4.3
30. Fire and draft stopping shall be completed before rough inspection.Typical locations, top (ceiling)and
bottom (floor) plates, soffits, and every 10'within enclosed cavities. 780 CMR R302.
31. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316.
32. Dwelling/Garage fire separation.An attached garage (within 3'of main structure) is required to have 1/2"
drywall on the garage side of the separation wall and if there is a finished space above the garage all
walls must have%2" drywall and the ceiling 5/8" drywall. 780 CMR R302.6
33. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC.
a. An initial HERS evaluation is required including insulation levels anticipated.
b. A final HERS evaluation confirming code requirements have been met including duct testing.
c. A signed copy of the Thermal Bypass Checklist.
d. Energy information including mechanical equipment posted on the electric panel.
e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star
Windows and the Thermal Bypass Checklist. Duct blast testing when practicable.
f. All band joist insulation must be enclosed within an air tight cavity, which you must create.
34. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is
a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air
flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion).
A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has
to be absolute and complete. If air can leak through an electrical device or through a crack it follows the
path of least resistance and carries 99%of the moisture in a structure.This is evident every time one
exposes fiberglass insulation and finds black insulation,which is dirt filter out of the air moving through
the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements.
35. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4.
6. Foundation anchor bolts must be%2" and be embedded a minimum of 7" into the concrete. 10" bolts!
780 CMR R403.1.6
7. CMU foundations require 3/8" parging before damp proofing.780 CMR R406.1 see exceptions.
8. Emergency escape is required out of every basement whether habitable or not.780 CMR R310.1
9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust
only systems), or treating the space with supply and return.See 780 CMR R408
10. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties
and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common
are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is
required with a load path to the foundation.
11. Steel straps over the ridge or 1x4 minimum collar ties are required 4'OC in the upper 1/3rd 780 CMR
R802.3.1
12. Ridge boards must be the full depth of the cut.780 CMR R802.3.
13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and
number of jack studs required.
14. All framing materials which are not code prescriptive must have stamped engineering.
a. LVLs
b. I-joist and or Floor Truss
c. Roof truss
15. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall
method being used. 780 CMR 602.10.
a. Garage corners and large corner window/door layout may require special solutions.
b. All corners must be appropriately attached to the foundation.
c. When using PFH (R602.10.3.3)or PFG (R602.10.3.4)the nailing requirement is 4" and 3"
respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full
headed with the temper and shank sizing meeting the strict code requirement.
16. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep
perforate the sheathing weakening it and contribute to building damage in high wind events.
17. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a
shower head is used, 6'8" for basements, 6'4" at beams/ducts.780 CMR R305.1. MA amended
18. Hazardous glazing locations,within 24" of a door, or within 60" of a stair, or across from hot tubs, spas,
bathtubs within 60" if not 60" above the walking surface, and other locations.780 CMR R308.4
19. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4"
sphere rule. Order restrictors. 780 CMR R612.2
20. Egress and emergency escape requirements shall be strictly met.
a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310
b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft
at 1st floor. Minimum clear opening 20"x24" or 24"x20".780 CMR R310.1.1
c. Two doors remote as possible at the normal level of travel,opening measured from the face of
the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high.780 CMR
R311.2
d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7%"from
the top of the threshold and only in-swinging doors. 780 CMR R311.3
21. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9",
maximum riser 8%", maximum overall variance for the run is 3/8",4" sphere rule on risers except where
the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle.
Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or
City of Northampton
Massachusetts �� - '�{,
ur
", DEPARTMENT OF BUILDING INSPECTIONS
\ 212 Main Street • Municipal Building
Northampton, MA 01060 t
INSPECTOR
Transformations Inc. November 19,2013
8 Coppersmith Way
Townsend, MA 01469
Subject Location:9 Laurel Street
Map Block: 38A-144
Mr. Scott,
Your building permit application and plans dated 10-04-2013 have been approved as drawn, noted and per
this memo.All changes to the permit plans must be documented.All work must meet all applicable codes
whether noted or not included within this memo.
Please follow up on the following items and provide additional information as needed:
These items will need to be accomplished as the project moves forward and before rough inspections;
1. The egress shown on the plan does not meet the remote as possible requirements of R311.2.We
will accept a personnel door exiting the garage the same size or larger than the mudroom door, but
a minimum of 28"face of door to stop per R311.2.
2. LVL engineering is required before the rough inspection.
3. An attic hatch is required and can not be in a closet.
4. The thermal plastic insulation in the basement will need to be covered with a thermal barrier per
R316.1
5. An interior air barrier is typically required on the inside face of permeable insulation. Raters to my
knowledge consider dense cellulose permeable.The rater is not listed on the "Home Energy Rating
Certificate" so I could not resolve this issue.This building department would not require one.
6. The netting for the cellulose insulation must be sufficiently attached to permanently maintain the
desired density.
7. Additional information is needed on the Simpson LST straps restraining the 2nd floor exterior walls.
Note August 16th 2013 begins the newest energy code 2012 IECC with MA amendments with a
concurrency period until July 1,2014 and an expectation that a new Stretch Code will be forth coming.
As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments.
In the following are some generic requirements which seem to be problematic.
This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes.
Read only international codes are available on line at http://publicecodes.cvberregs.com/icod/one
must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs
The current relevant building codes are:
2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments.
1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments.
2. Grading plan for structures being constructed required.780 CMR R401.3 for drainage requirements.
3. A basement drainage system is required in all basements 780 CMR R405.2.3.except those in group I
soils(table R405.1)
4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.
5. Through wall form ties must be removed from both faces and patched with hydraulic cement.780 CMR
R406.2 of amendments.
36. Deck ledgers and post must be appropriately attached, bolts or lags.780 CMR R502.2.2.1 Note:ThruLoks
are engineered for post attachment supporting a railing. Lateral attachment is required for each deck
per section 502.2.2.3.
37. Smoke and CO detectors as required. 780 CMR R314 and R315.
a. Smokes in each bedroom,within 10'of a bedroom door, and at the bottom of a stair leading to
a finished floor above.
b. CO within 10' of bedroom doors, at each level,for every 1500 sqft, (plumbing code in the
mechanical room) Except if there are no fossil burning fuels.
c. Heat detector in attached garage, and other large unfinished unconditioned spaces.
38. Closets beneath stair which have doors must be drywalled with%".780 CMR R302.7
39. If there is mechanical equipment or a combustible roof, 30 sqft of space, and 30" measured from top of
ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in
an accessible place. It must be insulated,gasketed, and secured in place.
Relevant items must be submitted to the building department for approvals before inspections and or
Certificates of Occupancy can be issued.
Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday
through Friday,8:30 am to 4:30 pm, excepting we close for walk-ins at 12:00 noon on Wednesdays. My email
address is: cmiller(a�northamptonma.gov
re
Thank you for your operation on these matters.
ill itilirr-
uck Miller
City of Northampton
Assistant Commissioner and Zoning Enforcement
more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails
must be continuous and returned to the wall if not to newel post.780 CMR R311.7.
22. Guards 36" minimum height above walking surface,a bench is a walking surface, required for more than
30" above floor or grade within 36",4" sphere rule.780 CMR R312.1.
23. Educate the plumber and electrician about maximum notch and hole sizes, and placement.780 CMR
R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge,
In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes
in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole.
Notches are different.
24. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition
requires a 16 GA 11/2" strap across the area and 6" beyond each side with 8-10nd nails. 780 CMR
R602.6.1
25. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen,
and require 3'clearance from windows.780 CMR M1502.3
26. Dryer duct transition is limited to 8' of aluminum flex, must be exposed, and the proper UL listing.780
CMR M1502.4.3
27. Dryer duct maximum equivalent length is 25' less 5' per 90°elbow or per manufacturer's specs.780
CMR M1502.4.4.1, no screwed connections.
28. Markup air is required for any exhaust hood of 400 CFM or more.780 CMR M1503.4
29. Fireplaces require all combustion air be provided from the exterior and below the firebox,duct work
maintaining 1" clearance for 5' from the duct outlet for all fireplaces and airtight doors. 2009 IECC
402.4.3
30. Fire and draft stopping shall be completed before rough inspection.Typical locations,top (ceiling)and
bottom (floor) plates, soffits, and every 10'within enclosed cavities.780 CMR R302.
31. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316.
32. Dwelling/Garage fire separation.An attached garage (within 3'of main structure) is required to have%2"
drywall on the garage side of the separation wall and if there is a finished space above the garage all
walls must have%2" drywall and the ceiling 5/8" drywall. 780 CMR R302.6
33. Energy aspects shall comply with the stretch energy code.780 CMR Appendix 115AA or 2009 IECC.
a. An initial HERS evaluation is required including insulation levels anticipated.
b. A final HERS evaluation confirming code requirements have been met including duct testing.
c. A signed copy of the Thermal Bypass Checklist.
d. Energy information including mechanical equipment posted on the electric panel.
e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star
Windows and the Thermal Bypass Checklist. Duct blast testing when practicable.
f. All band joist insulation must be enclosed within an air tight cavity, which you must create.
34. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is
a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air
flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion).
A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has
to be absolute and complete. If air can leak through an electrical device or through a crack it follows the
path of least resistance and carries 99%of the moisture in a structure.This is evident every time one
exposes fiberglass insulation and finds black insulation,which is dirt filter out of the air moving through
the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements.
35. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4.
6. Foundation anchor bolts must be%2" and be embedded a minimum of 7" into the concrete. 10" bolts!
780 CMR R403.1.6
7. CMU foundations require 3/8" parging before damp proofing.780 CMR R406.1 see exceptions.
8. Emergency escape is required out of every basement whether habitable or not. 780 CMR R310.1
9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust
only systems), or treating the space with supply and return.See 780 CMR R408
10. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties
and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common
are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is
required with a load path to the foundation.
11. Steel straps over the ridge or 1x4 minimum collar ties are required 4' OC in the upper 1/3rd780 CMR
R802.3.1
12. Ridge boards must be the full depth of the cut.780 CMR R802.3.
13. A complete window and header schedule is required.780 CMR Table R502.5 for header sizing and
number of jack studs required.
14. All framing materials which are not code prescriptive must have stamped engineering.
a. LVLs
b. I-joist and or Floor Truss
c. Roof truss
15. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall
method being used. 780 CMR 602.10.
a. Garage corners and large corner window/door layout may require special solutions.
b. All corners must be appropriately attached to the foundation.
c. When using PFH (R602.10.3.3)or PFG (R602.10.3.4)the nailing requirement is 4" and 3"
respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full
headed with the temper and shank sizing meeting the strict code requirement.
16. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep
perforate the sheathing weakening it and contribute to building damage in high wind events.
17. Ceiling heights minimum 7'for habitable spaces, 6'8"for bathrooms includes tub/shower area if a
shower head is used, 6'8"for basements, 6'4" at beams/ducts.780 CMR R305.1. MA amended
18. Hazardous glazing locations, within 24" of a door,or within 60" of a stair, or across from hot tubs,spas,
bathtubs within 60" if not 60" above the walking surface, and other locations.780 CMR R308.4
19. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4"
sphere rule.Order restrictors. 780 CMR R612.2
20. Egress and emergency escape requirements shall be strictly met.
a. Basements, habitable attics, and all sleeping rooms require emergency escape.780 CMR R310
b. Windows within 44" of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft
at 152 floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1
c. Two doors remote as possible at the normal level of travel, opening measured from the face of
the slab to the stop with door at 90 degrees,one 32" and one 28" minimum 78" high. 780 CMR
R311.2
d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7%"from
the top of the threshold and only in-swinging doors. 780 CMR R311.3
21. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9",
maximum riser 8'A", maximum overall variance for the run is 3/8",4" sphere rule on risers except where
the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8"on balustrade, 6" in the triangle.
Graspable rail 1%" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or
City of Northampton
Massachusetts 4, *
vs;
DEPARTMENT OF BUILDING INSPECTIONS
'I. -`
C.. _ ;
212 Main Street • Municipal Building 0�
Northampton, MA 01060 /1'140°.
INSPECTOR
Transformations Inc. November 19, 2013
8 Coppersmith Way
Townsend, MA 01469
Subject Location: 3 Laurel Street
Map Block: 38A-145
Mr.Scott,
Your building permit application and plans dated 10-04-2013 have been approved as drawn, noted and per
this memo.All changes to the permit plans must be documented.All work must meet all applicable codes
whether noted or not included within this memo.
Please follow up on the following items and provide additional information as needed:
These items will need to be accomplished as the project moves forward and before rough inspections;
1. The egress shown on the plan does not meet the remote as possible requirements of R311.2.We
will accept a personnel door exiting the garage the same size or larger than the mudroom door, but
a minimum of 28"face of door to stop per R311.2.
2. LVL engineering is required before the rough inspection.
3. An attic hatch is required and can not be in a closet.
4. The thermal plastic insulation in the basement will need to be covered with a thermal barrier per
R316.1
5. An interior air barrier is typically required on the inside face of permeable insulation. Raters to my
knowledge consider dense cellulose permeable.The rater is not listed on the "Home Energy Rating
Certificate" so I could not resolve this issue.This building department would not require one.
6. The netting for the cellulose insulation must be sufficiently attached to permanently maintain the
desired density.
7. Additional information is needed on the Simpson LST straps restraining the 2nd floor exterior walls.
Note August 16th 2013 begins the newest energy code 2012 IECC with MA amendments with a
concurrency period until July 1,2014 and an expectation that a new Stretch Code will be forth coming.
As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments.
In the following are some generic requirements which seem to be problematic.
This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes.
Read only international codes are available on line at http://publicecodes.cvberregs.com/icod/one
must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs
The current relevant building codes are:
2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments.
1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments.
2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements.
3. A basement drainage system is required in all basements 780 CMR R405.2.3.except those in group I
soils (table R405.1)
4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.
5. Through wall form ties must be removed from both faces and patched with hydraulic cement. 780 CMR
R406.2 of amendments.
F
fit o f Nori1uritrt -
zr i 8 t I�
ii i: ; J
1=
'� 7; DEPARTMENT OF BUILDING INSPECTIONS '� ` ?
INSPECTOR 212 Main Street 0 Municipal Building 7��,;, — .�•
Northampton,MA 01060 i;•s�
.� i tzwrq
LOCA TION
SQUARE FOOTAGE AMOUNT
BASEMENT® .20 I I7G 0.?& 6:d °
1sT FLOOR @.SO 1 1 37C
2ND FLR @.30 • i Z d J f7' "e
%2 FLOORS, FINISH ATTIC,GARAGE @.20 Szg /d 5' (o
DECK/PORCHES @ :20 / 15 Z 3 ` c°
TOTAL Ciji I 18`- if O
Transformations, Inc. Trade Subcontractor List
As of October 7, 2013
CATEGORY COMPANY NAME CONTACT TELEPHONE#
1---
Cleaning (interior) David A. Hardy, Contractor, LLC David Hardy 413-527-2655
Drywall ,Rod's Drywall Jalbert Rod
, 413-977-3679
I I-
Drywall (alternate) !Glidden Drywall !Mark Glidden, Sr. 413-527-4340
Electrician I Dan Whiteley, Inc. Dan Whiteley 413-527-1440
[ .
L ,
Excavator !Truehart Paving & Construction I Paul Truehart 413-527-9246
1 !
Finish .David A. Hardy, Contractor I David Hardy 413-527-2655
Flooring First Prize Flooring Mike Labrecque 413-529-2662
. 1
,
Framing (labor) David A. Hardy, Contractor !David Hardy 413-527-2655
,
Framing (labor) (Alternate) F. Roy & Sons Construction, Inc. l Fred Roy 413-455-5929
! 1-
Foundation Sub K&T Concrete Services ,Keith Tardy 413-626-9003
,
Garage Doors Ircaynor Door Sales Peter Paniczko 413-527-2447
HVAC Tin Man Heating &A/C :4
John Hamilton ' 413-527-7722
Insulation ,Collins & Co. !Keith Elmy . 860-870-9803
1 ,
Insulation (Alternate) First Prize Foam Insulators I Mike Labrecque 413-529-2662
Landscaping Ia y Haluch, Inc. Joanne Martins 413-583-6508
Landscaping (Alternate) r Pioneer Landscapes, Inc. I Brian Campedeli — 413-527-0852
-1-- -A_
L ,
Painting I David A. Hardy, Contractor David Hardy 413-527-2655
-[
I !
Plumbing I Philli• •
4 p's Plumbing & Heating, Inc. I Phil Hurteau
413-527-0340
1 .
I iChris Thomson &
Roofing R.C.I. Roofing, LLP iMark Delise 413-527-4775
I I
Siding !Charles T. Laveck Home Improvements Chuck Laveck 413-246-9718
Siding (Alternate) All Star Insulation & Siding Co., Inc. I Ed Losacano L413-527-0044
Stairs Northeast Stair Co., LLC Bill Drzyzga 860-875-3358
Tile ;Keenan Tile Co. Tom Keenan 413-7394124
_ r
.
CC:
Joe Fydenkevez, Jr. ,-
R. Carter Scott
David Hardy
1
SI Tell 2"Flimil)
CSFA-0S5181
ROBERT C SCOTT =
8 COPPERSMITR WAY
TOWNSEND Mk-01469
•
0711412014,
BEIMMISBEMBIBEr
• MUNICIPAL SEWER/AVAILABILITY APPLICATION
Northampton Streets Department
125 Locust Street
Northampton, MA 01060
587-1570
A Department of Public Works Trench Permit and Sewer Entry Permit shall be required
prior to any construction or connection activity associated with this application.
Location:
3 Laurel Street, Northampton
Inquiry Made By:
Transformations Pam Kimball 978-790-9476
Date of Inquiry: 11/4/13
Reason for
Request: Hook into City Sewer New Construction
Municipal Sewer Main in Front of Location: Yes A No
Municipal Storm Drain Available: 5 '/2 deep Yes No x
Size of Sewer Main: c,P Material: CL AY 4.. Pi vi G Age: /?d,3
Depth of Sewer Main: LI— 5 f<6 -7---
Length of Sewer Main: Sao ,f' ,
Size of Service Connection:. V /0 k1 n r)it.)A/
Type of Service Connection:
Tie-in to Sanitary Main Tie-in to Sanitary Stub
Comments:
Note: If this availibility is for new construction,this form must be hand delivered to Building
Inspector.
A corresponding"sewer entrance fee"shall be paid prior to making any connection to the municipal sewer
system.Arrangements of such installation shall be made with the Northampton Streets Department with a
minimum of 5 working days notification. All work shall conform to Northampton Streets Department
specifications.
0_1„ A.E/7
ohn Hall
ewer Department X
cc: Ned Huntley, Director DPW
Louis Hasbrouck, Building Commissioner / 661
MUNICIPAL WATER AVAILABILITY APPLICATION
Northampton Water Department
237 Prospect St.
Northampton,MA 01060
. 587-1097
A Department of Public Works Trench Permit shall be required prior to any construction or
connection activity associated with this application.
Location: 3 Laurel Street, Northampton,MA 01060
Inquiry Made By:
Transformations,Inc. Pam Kimball 978-790-9476
Date of Inquiry: 11/4/13
Number of Type of Single Family X Type of Private X
Units: 1 Unit(s): Apart. Comm Ownership: Condo
Multi-family Rental
(Applicant to fill out the above)
Municipal Water Main in
Existing service to
Front of Location?
Yes: X No: site? Yes: No X
Size of Water Main: 8" Material: Ductile Iron Age: 2010
Approximate Static Street Flow Test Conducted:Yes: No: X
Pressure: 90 psi If done attach results
Size of Service Connection
1"
Suggested Meter Size: 5/8"
Comments: The Water Department cannot guarantee adequate water pressure during peak demand
times at elevations above 320 feet.
• A corresponding water entrance fee shall be paid prior to making any connection to the municipal water
system.
• Arrangements of such installation shall be made with the Northampton Water Department with a minimum
of 5 working days noti •.f`on.
• 1 work shall nfo,ii . Northampton Water Department specifications.
te,.. ) e ILI_
David W. Sparks, Superintendent of Water Dept.
Water Entry$200.00 Meter$100.00 Radio$100.00
cc: Ned Huntley,Director
cc: Louis Hasbrouck, Building Commissioner
Note: If this availability is for a new construction,it must be hand delivered to the Building
Inspector. �N
`,\snth.I'+admin\Permits\Water Application', Avai.i.ability.doc ,
o r m - 3 G.
�p "
m ? C' cv A 3 G
* 7 n N r! G. A, ,.-. > D ?' O tir.et
ro w a cc < t/1 Q ^ n 3 n a 7 . 2 �.r�
CCD to c S io a uo CD u* rD CD of o a -w 0- �.I
m o D oc, o o, m * s o o a s vs cg° m o' n op 3 om s< x r--n * uo uo ° w ED c a •v v re pp-1 o a :r aj iglf:reTcc ID
3 3 ' e� rr 2 c0 3 vii g w rn
Q - uo uo is H 7, uo n ,- c r. w v N O_ •p•
W
O u1 moo, •o m w 7o Z �*+ oO 3 m rn d w w o• N
$ C b OD P o• 11 c n 0 ; �i N a
-
eD
, oZ -n n n 2 6
1T+ c • G tiy,a
„ . goop a
M 44
XI
N N
- o ,'Ti`s = n Co , n n f o
apo `�, d�1 t'1 ^ f• W VO p O _ ad•
(n au et - N K 1m N uo N N 7 C .i 0 d 4.4
0. A" r YM{W 7n r 0 O
1II O N N • C m m ,a
no
e n m p tee', 'n g N d fD T 8 Q O f -. •
o = -1 , 2 N
coa avv aw N,� g
-, = rn x x rrP Q
fflF891 9 O w rnm W 2 C Z 70 0, p '^a� '� ,c H 8 n = rt, eD N i
Y�. a in r, 2
°. "a $ .o ° m !"!
a
5 "4 o, a. < i ? .o.
nr-t rIN
IN.,
� � iD
o
M
of
oo " C 3 co = n a o =i eu io o o 0
o ai •*R r^ Pi'
;a► m N N a o
O
. 4 a it y N C D et)
N W 1rnA
et
a N
I N
re
a.
a
3
O tl0 N a 1 d
I.4 n, 0 CO c
rn
3
as
v+ 51 n
'0 WO P . N et 0
N
rt.
W
&z
03/15/2019 23:24 FAX LJuuiiuui
-TRAVELERS] . • WORKERS COMPENSATION.
•
• AND
EMPLOYERS LIABILITY POLICY
• TYPE AR INFORMATION PAGE WC 00 00-01 ( A)
.POLICY NUMBER: (6HUB-0326N39-A-13) .
RENEWAL OF (6KUB-0326N39-A-12)
INSURER: THE TRAVELERS INDEMNITY COMPANY:OF AMERICA
1. NCCI CO CODE: 13439
INSURED: PRODUCER:
TRANSFORMATIONS INC - GALLANT INS AGENCY INC
8 COPPERSMITH WAY - P 0 BOX 1428 •
TOWNSEND MA 01 469-441 2 -PEPPERELL MA 01-463.
Insured is A CORPORATION-
•
Other work places and Identification numbers are shown in the schedule(s) attached.
2. The policy period is from 04-02-13 to 04-o2-14. 12:01 A.M.at the insured's mailing address.
3. A. WORKERS COMPENSATION INSURANCE:_ Part One of the policy.applies.to the Workers
Compensation Law of the State(s)listed here:. .
MA
0
B. EMPLOYERS LIABILITY INSURANCE: Part Two of the policy applies to work in each state listed in
Item 3.A. The limits of our liablity under.Part Two are:
Bodily Injury by Accident: $ 500000 Each Accident
• Bodily Injury by Disease: $ - 500000 Policy Limit
Bodily Injury by Disease: • $ 500000 Each Employee.-
o=- • C. OTHER STATES INSURANCE:,Part Three of the policy applies to the states, if any,listed here:
COVERAGE REPLACED BY ENDORSEMENT WC 20 03 06A
(
mew
D. This policy includes these endorsements and schedules:
SEE LISTING OF ENDORSEMENTS - EXTENSION OF INFO PAGE
osat
4. The premium for this policy will be determined by our Manuals of Rules, Classifications, Rates and Rating.
�-� Plans. M required information is subject to verification and change by audit to be made ANNUALLY.
mmat
DATE OF ISSUE: .03-25-13 WC ST ASSIGN: MA .
OFFICE: ORLANDO INDUS AFF 161 .
PRODUCER: GALLANT INS AGENCY INC 22TR8
000740
-•
Information and Instructions
Massachusetts General Laws chapter 152 requires all employers to provide workers' compensation for their employees.
Pursuant to this statute, an employee is defined as"...every person in the service of another under any contract of hire,
express or implied, oral or written."
An employer is defined as "an individual, partnership, association, corporation or other legal entity, or any two or more
of the foregoing engaged in a joint enterprise, and including the legal representatives of a deceased employer, or the
receiver or trustee of an individual, partnership, association or other legal entity,employing employees. However the
owner of a dwelling house having not more than three apartments and who resides therein, or the occupant of the
dwelling house of another who employs persons to do maintenance, construction or repair work on such dwelling house
or on the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer."
MGL chapter 152, §25C(6)also states that"every state or local licensing agency shall withhold the issuance or
renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any
applicant who has not produced acceptable evidence of compliance with the insurance coverage required."
Additionally, MGL chapter 152, §25C(7)states"Neither the commonwealth nor any of its political subdivisions shall
enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance
requirements of this chapter have been presented to the contracting authority."
Applicants
Please fill out the workers' compensation affidavit completely, by checking the boxes that apply to your situation and, if
necessary, supply sub-contractor(s) name(s), address(es) and phone number(s) along with their certificate(s) of
insurance. Limited Liability Companies (LLC)or Limited Liability Partnerships(LLP)with no employees other than the
members or partners, are not required to carry workers' compensation insurance. If an LLC or LLP does have
employees, a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial
Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should
be returned to the city or town that the application for the permit or license is being requested, not the Depai tment of
Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers'
compensation policy, please call the Department at the number listed below. Self-insured companies should enter their
self-insurance license number on the appropriate line.
City or Town Officials
Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom
of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant.
Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant
that must submit multiple permit/license applications in any given year, need only submit one affidavit indicating current
policy information (if necessary) and under"Job Site Address"the applicant should write "all locations in (city or
town)." A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the
applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each
year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture
(i.e. a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit.
The Office of Investigations would like to thank you in advance for your cooperation and should you have any questions,
please do not hesitate to give us a call.
The Department's address, telephone and fax number:
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
1 Congress Street, Suite 100
Boston, MA 02114-2017
Tel. # 617-727-4900 ext 7406 or 1-877-MASSAFE
Revised 7-2013
Fax# 617-727-7749
www.mass.gov/dia
Oct 09 13 11:31a David Hardy 413-527-7916 p.2
The Commonwealth of Massachusetts
T _,—_ r7) Department of Industrial Accidents
1'n °-7 �' Office of Investigations
I Congress Street, Suite 100
�.� Boston,MA 02114-2017
r
www mass.gov/dia
Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Legibly
Name (Business.Organizationfindividual):
Transformations, Inc.
Address: 9 Coppersmith Way
City.StateiZip: Townsend, MA 01469 Phone #: 978-597-0542
Are you an employer? Check the appropriate box: Type of project(required):
:.❑ I am a employer with 4. LI I am a general contractor and T 6. ❑ New construction
employees(full anc!or part-time).' have hired the sub-contractors
2.E 'aril a sole proprietor or partner- listed on the attached sheet. 7. []Remodeling
These sub-contractors have
s:,iF and have no employees 8. ❑Demolition
working for me in any capacity. employees and have workers'
F ty 9. 7 Building addition
No workers' comp. insurance comp. insurance.t
rec uired.] 5. [] We are a corporation and its 10.0 Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions
myself. [No workers' camp. right of exemption per MGL 12.0 Roof repairs
insures:ce required.: - c. 152, §1(4),and we have no
employees. [No workers' 13.0 Other
I comp. insurance required.]
'Any applicant that checks box`-_tnus.also fill out the section below showing their workers'compensation policy information.
t Horseown 'eio subrr:i:this aff dart indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
=C an:facte rs:hat check i-Es bore must attached an addi:ional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sic-contractors:tare employees.they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: Travelers Insurance Company
Policy #or Self-ins. Lc.#: 6KUB-0326N39-A-13 Expiration Date: 04/02/2014
lob Site Address: 3 tat-� ' c5 1/ City!State/Zip t ampton, MA mole
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under Section 25A of Iv1GL c. 152 can lead to the imposition of criminal penalties of a
line up to S1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA fix insurance coverage verification.
f do hereby certify under the pains and penalties of perjury that the information provided above is true and correct
Sienatu-e: ( - -a Date: 1111/13
Phone#: q 1 9 - 5`?1- 05-4E-
Official use only.. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
Tnn/TnnF1 Iva 9Z:ZO 6TOZ/ET/L0
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: ( /�/!► C Not Applicable ❑
Name of license Holder: .� �n�` l l )/ :t V C. �'~• 5 4f c$FA -6S5 I I
�+ �A // License Num er
( cprt�( VII1 � VV , T Ms t (, 1A O116 14- 26l /�'
Address ExpirAtion Date
/0�[�C
Signature Telephone
9.Registered Home Improvement Contractor: Not Applicable ❑
A - oSS 12 I
Company Name Registration Number
1 Svv�l ,fi�zs, c . 4 1 14(26 l2h"
Addr ss _ Expiration Date
Telephone1 P3- Y` 7-6--;42_
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes ❑ No ❑
11. - Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 1083.5.1.
Definition of Homeowner: Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature N/,
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House Addition ❑ Replacement Windows Alteration(s) ❑ Roofing E
Or Doors ❑
Accessory Bldg. ❑ Demolition ❑ New Signs [0] 4 Decks � Siding [0] Other[Ca
�JI� J
Brief Descrj'f�ti4p,of Propqsed "1
Work: 1 IA(444 04- Sa U�. 'tom" � �t2 cVI�it2'j t. C' -
Alteration of existing bedroom Yes No Adding new bedroom Yes No
Attached Narrative Renovating unfinished basement Yes No
Plans Attached Roll -Sheet
6a. If New house and or addition to existing housing, complete the following:
a. Use of building : One Family V Two Family Other
b. Number of rooms in each family unit: 7 +" Number of Bathrooms 3
c. Is there a garage attached? 1,4'5 -1 /, /4 bt sue? t- , / , /
d. Proposed Square footage of new construction.I, 166- r 523 J imelisions 3 3 X ill- 6 (4/€_ ka y- -,.
e. Number of stories? 2" f
f. Method of heating? G /14/h tbts1 Ar .. c4ifJ / gplaces or Woodstoves Number of each
g. Energy Conservation Compliance. i� Masscheck Energy Compliance form attached? ✓
h. Type of construction __Y-not N/i
i. Is construction within 100 ft.of wetlands? Yes ✓ No. Is construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade /
k. Will building conform to the Building and Zoning regulations? 4/ Yes No.
I. Septic Tank City Sewer V Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I, tii1t , as Owner of the subject
property
hereby authorize L)) c
to act on my behalf, in all matters relative to work authorized by this building permit application.
P/Pc
Signature of Owner Date
I, �� �""� , as Owner/Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the ains and penalties of perjury.
/ !X1%1 S f. �`�`1'� 4'l .
Print Name
Signature of Owner/Agent Date
•
•
Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information
Existing Proposed Required by Zoning
This column to be filled in by
Building Department
Lot Size 1,___ __1 ? Iii 5-43 .542. i I.
FrontageI____ .___....._...___J 1_1011-1-_______J L..._.__._--._r_ _-_�.__._._..______I
Setbacks Front 1. -r l____t
Side L:1 I R:1 . 1 L:e .5'i. l 6a{1 I 1 l
Rear 1._ ..__1 LQ_L...i l I
Building Height 17-1 Wr-67ft 1 1
Bldg. Square Footage 1= % l_ _
Open Space Footage % E
(Lot area minus bldg&paved L_____j L__._,_,-.J ET ni #.--_.-.I t
parking) WW1:tAztAWiAt
#of Parking Spaces
Fill: 1:..,..:,.__:,::._._..�.._.�..._._......�,.._.__....i
(volume&Location)
A. Has a Special Permit/Variance/Finding a er been issued for/on the site?
NO Q DONT KNOW YES 0
-y
IF YES, date issued:1 J
IF YES: Was the permit recorded at the Registry of Deeds?
NO Q DONT KNOW Q YES Q
IF YES: enter Book I I Pagel , 1 and/or Document#i I
B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW Q YES 0
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Q Obtained Q , Date Issued:
C. Do any signs exist on the property? YES NO Q
IF YES, describe size, type and location: } r Cat f f-tiy cis
D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO r
IF YES, describe size, type and location: ` __....1
E. Will the construction activity disturb(clearing, grading,exca ation, or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES Q NO 0
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
tlitoti
.::4410;„ziew:r.E.0:04,01m0i4,Ratugagatitoffigyikottineggikoi
. -
---"'5,,91nilliatall,04,ENALIANitktitgektOtthigattla
t...$.la,k,,t5,;k1Paiifilthrptgailiilkkk,,,tittithkgregt ,,;,;;;;;;:„.,.-„,-;;;Rlinnolltum,,,,F.,„,..0
FrAgitt PA,Yill,i. ttr-4:kiewaY,II,E,:aliik.F-2,e-4,1PA:50,gitia;41144-5511,11t-,x,,,,,ft:,::,,I!tilic,i!,,,,q.,:!:,
if( 7, 57:774r. city. of Northampton
t
leurp:±*9$501:9:1yrogiiiiviklqw.4itmintialti.,!,!. .,!!•':,-1„,4:2;14giriegimErgillm.ski;
■ I .,ff-', '.•--:=' !' ' '.":'-.L--L--2-1 1 Building
11P142t4'Lkgj'Magt'faA46IrAktllt:Z;'''ViFrMIN15V.F''MTirh'P:: ::!!.:tii!:.*in2ii
IReWpIq9.911.xidieRNAIVVVREINE'Mk't!':-
,;H7.444:5WlIltritAilq:PAIIP:::'::::;;tiAlria:igaiiiiiilletaiiEr'1:1!!FI:4:::!;:;;VrOtl%
:FRRgVAIN":41149101910tgailig.! It:t;:,''IL4P4K:Ft'ittelregYggiitih
I..-R•1' ' L i 212 oMoami n 1Street o o 01060 LI: NOV — 62013
..,-„.",,.0f., truttqc4.:4:,,,,,,,04,,.„,,R,41,,,,:„Nawn,T,,,,,Rioort,:rte4:050:
liveive„N:,i,,„,:,,.,,,,posomon,,,43:1,14,,:.,,„,,,,0„6„,,,,41,,,.ev.*Efklillayil
..
1272 : '
PV4-I.r1P-114°1111t9"-•''!.:L.:;;;41:•iiiitt41.4`115,1S1114141:MIMkie:r:,:•;i1,..1"'''''
El actric, Flu,nr,,,rig&,..'-_-?,,s,Lnseihi3
i l'1-1:s Northampton, Fax 041103-587-
_
CONSTRUCT,ALTER,REPAIR,RENOVATE APPLICATION TO CONSTR
•.-...••..•-:-..':-
: 1661idfilltO479;711::7:::?::;!;•:i.:?::;.':•N':..;'.:,:.;':::':.11;:..;''F:1:.-::':::,
OR DEMOLISH A ONE OR
Milif!i:'11111Pililillilegirg. .: ::ii;.0!:,.!.!•11 .,:,-,.,„...,:,..,„):
SECTION 1 -SITE INFORMATION
filitililail,":01::::.„A-•::: •;Lb -••7-f:..!' -4!:,iii:!:: s. -1.-i.!:,;!"•S.,-'4,.;,:11:.::i.:1, :.`1,::11;.:,:;,::.:..::',:!i'.:::.':.!'•.'!Ii.:,:*
L-42'.le
1.1 Pro e Address: siyi.el_ , 3)
''IltiiiiM:'!iit!IIIEN4;:•':!:IN:ii1:41:111!:::ilp.iiib•lieflayilDiSIFIF, :::!:zi:mcg.:i!:•••;:.;.i .;;:::-:•,,,•:•:,•:.,,':,•'•
1. teuviey ,•
ill:zone.t.:::-
65•DiStgct.,••-- •
41011!IhigftilIiiR4-.A:411,IidthOili!;::10:::Ii::; :q,T.,,u.....•••••-•
Zone Werlitla-WI l• ElftillSt:IpNtr!cti.,:.,,..
Ok 114'1 °111 61
SECTION 2 i-PROPER
•‘...
TY OWNERSHIP/AUTHORIZED HORIZED
Wi1sei,
2 Goe,,,s- orliflik VA. C1.2.._11-6
2.1 Owner of Record:
< ',sr •
s - ,ivp•rn.ao-i-',,---'="" Curinit
--rr,',N-1,
Telephone
Name(Print g ing Address:
Signature
2.2 Authorized Agent:
Name(Print) Current Mailing Address:
Telephone
Signature
• Only
Official Use
SECTION 3-ESTIMATED CONSTRUCTION COSTS :
Item Estimated Cost(Dollars)to be •• ' '.. :. '
completed by permit applicant
i 72.2, 41 o
1. Building
i I/ .5(1° Construction
2. Electrical
Building
:(Cab))Building li dmi nagtePdeTrorntfairtol Fee
t)o f
i i 5°61
3. Plumbing
6, 500 Permit Fee
(47
4. Mechanical(HVAC)
/g" '
Check Number .
5. Fire Protection 5)
6. Tota i67 ./$1,--. 1:11 This S3ec.tion For Official I=( +2+3+4+ .••• : • '' ' T. . . Date
I Use Only ,
Building Permit Number: ,
Date
.._ „...
Signature: ,
•
Building CommisSioner/Inspectortf Buildings ,
File#BP-2014-0584 ^®(j S/°-Q
APPLICANT/CONTACT PERSON TRANSFORMATIONS INC VV
ADDRESS/PHONE 8 COPPERSMITH WAY TOWNSEND (978)597-0542 f\ QAA)
efiViCs
PROPERTY LOCATION 9 LAUREL ST
MAP 38A PARCEL 144 001 ZONE
9 r7 8 - L 7651
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST I'6lAks K 1 pl.8A L L`-=---
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT -MAN S FOk
Fee Paid
Building Permit Filled out /t(519
/ JY /) L$-i9 '"` I , ' co m
Fee Paid
Typeof Construction: CONSTRUCT 2 STORY SFH W/ATT GARAGE
n
New Construction PAK`(i J 'L
Non Structural interior renovations Tyykr4Sf6RMlk'cloNS
Addition to Existing
Accessory Structure I N C .Co f`'■
Building Plans Included: (1/011j Owner/Statement or License 055181
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF RMATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
ii-y. 'ti•. l elay
i _ //-/97i?
. ',•. re of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
9 LAUREL ST BP-2014-0584
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 38A- 144 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category:New Single Family House BUILDING PERMIT
Permit# BP-2014-0584
Project# JS-2014-000973
Est. Cost: $249990.00
Fee: $1163.40 PERMISSION IS HEREBY GRANTED TO:
Const.Class: Contractor: License:
Use Group: TRANSFORMATIONS INC 055181
Lot Size(sq.ft.): 12545.28 Owner: TRANSFORMATIONS INC
Zoning: Applicant: TRANSFORMATIONS INC
AT: 9 LAUREL ST
Applicant Address: Phone: Insurance:
8 COPPERSMITH WAY (978) 597-0542 WC
TOW NSENDMA01469 ISSUED ON:11/19/2013 0:00:00
TO PERFORM THE FOLLOWING WORK:CONSTRUCT 2 STORY SFH W/ATT GARAGE
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 11/19/2013 0:00:00 $1163.40
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner