CONSTRUCTION CONTROL DOCUMENT N°R7"AM rcv
Project Title: City of Northampton—New Police Station Project
Date: 6/10/11
Project Location: Central Street,Norhtampton Ma
Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking
structure. Demolition of existing police station building.
In accordance with the 6th edition of the Massachusetts State Building Code:
I,Curtis Edgin, Mass.Registration Number 7352
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised
the preparation of all design plans,computations and specifications concerning:
[X] Entire Project [X] Architectural [ ] Structural [ ] Mechanical
[ ] Fire Protection [ ] Electrical [ ] Other(specify)
for the above named project and that to the best of my knowledge,such plans,computations and specifications meet
the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all
applicable laws for the proposed project.
Furthermore,I understand and AGREE that I shall perform the necessary professional services and be present on
the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the
documents approved by the building permit and shall be responsible for the following as specified in section 116.2.2:
1. Review of shop drawings,samples and other submittals of the contractor as required by the construction
contract documents as submitted for the building permit,and approval for the conformance to the design
concept.
2. Review and approval of the quality control procedures for all code-required controlled materials.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine,in general,if the work is being performed in
a manner consistent with the construction documents.
I shall submit periodically,in a form acceptable to the building official,a progress report together with pertinent
comments. Upon completion of the work,I shall submit to the building official a final report as to the satisfactory
completion and readiness of the project for occupancy.
iii, e,
Signature and Seal of registered professional: S corns
A.
,144. ,
1: ijw
She, Wonuotontelealiko,
01 / 44 / 1 •
LL " ' .
V
13aadani, J1aaaackriAie 02708-7678
Wwiter/677) 727-3200 ZuII
c3 z (61 7) 727-5732 DEPT.OF BUILDING INSPECT
,•:,,
NORTHAMPTON MA,070600
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers/Architects responsible for only a portion of a controlled project)
Project Title: City of Northampton—New Police Station Project
Date: 6/10/11
Project Location: Central Street,Norhtampton Ma
Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking
structure. Demolition of existing police station building.
In accordance with the sixth edition Massachusetts State Building Code,780 CMR:
T4)6 L A S S. L443 i G Mass.Registration Number 4 - 33
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised
the preparation of all design plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical
[ ] Fire Protection 'Electrical [ ] Other(specify)
for the above named project and that to the best of my knowledge,such plans,computations and specifications meet
the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all
applicable laws for the proposed project.
Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit.
Upon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned
portion of the work.
gt-' *NCF
4 70 i • DOUGLAS yG
Signature and Seal of registered professional: v LAJOIE �,V
ELECTRICAL
,0 42533 �?
i�0�9FGISTE. '1c.
SiONAt.ts4
Wommonweetak
" i / 1 1 / 4
I
e9() �1����t�„
f/In ,Yacei de mi1301
PWoata,, e�aaaactuca /02108-7618 till i
3h nei(61 7) 727-3200
DEFT:RF BUILDING INS t Cpgp NS
3air(61 7) 727-5732
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers/Architects responsible for only a portion of a controlled project)
Project Title: City of Northampton—New Police Station Project
Date: 6/10/11
Project Location: Central Street,Norhtampton Ma
Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking
structure. Demolition of existing police station building.
In accordance with the sixth edition Massachusetts State Building Code,780 CMR:
I, Sm I "l2 • Mass.Registration Number 41 2. i 5
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised
the preparation of all design plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural 1.4 Mechanical
Fire Protection [ ] Electrical pi Other(specify) TujyriN 1.1G
for the above named project and that to the best of my knowledge,such plans,computations and specifications meet
the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all
applicable laws for the proposed project.
Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit.
Upon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned
portion of the work.
(11/1/Signature and Seal of registered professional: stArn_ort
DELBERT B. �`�
MECHANICAL
4t21$ o �w
tip�op,9FGIST�P,09>
►i;SS/ONAk-�
►n
gisw Wometionaseallive#
A"' t
Asuiazoistalettee
IF
& 1301
ioalosK aaoac4uoe 4'02108-16.18
one'(617) 727-3200
DEPT OF BUILDING INSf ELT
Saar 727-5732 NORTHAMPTON,MA 01050
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers/Architects responsible for only a portion of a controlled project)
Project Title: City of Northampton--New Police Station Project
Date: 6/10/11
Project Location: Central Street,Norhtampton Ma
Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking
structure. Demolition of existing police station building.
In accordance with the sixth edition Massachusetts State Building Code,780 CMR:
I, C t?A!C7 fr?ENGlf — Mass.Registration Number 4/5-0 3 2-
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised
the preparation of all design plans,computations and specifications concerning:
[ ] Entire Project [ ] Architectural )Structural [ ] Mechanical
[ ] Fire Protection [ ] Electrical [ ] Other(specify)
for the above named project and that to the best of my knowledge,such plans,computations and specifications meet
the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all
applicable laws for the proposed project.
Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit.
Upon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned
portion of the work.
Signature and Seal of registered professional: os CRAIG S. y
FRENCH m
STRUCTURAL
No.45032
/ -
\, TA ism H �ø44di
�= pat:4
D*.c A44444.144. la, R�+. 1341__ - _
M it ye
., 144440 c1'4, 02108-1 1
A� (611) 72?-3200 i 3 20H
fMt (617) 727-5732
DEPT.OF BUILDING INSPECTIQNS
NORTHAMPTON,MA 01060
SECONDARY CONSTRUCTION CONTROL, DOCUMENT
(for Professional Engineers/Architects responsible for only a portion of a controlled project)
Project Title: City of Northampton New Police Station Project
Date: 6/101 I I
Project Location: Central Street, Norhtampton Ma
Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking
structure. Demolition of existing police station building.
In accordance with the sixth edition Massachusetts State Building Code.780 CMR:
I. Dana C. Huff Mass. Registration Number 34729
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised
the preparation of all design plans.computations and specifications concerning:
I I Entire Project I ) Architectural I I Structural [ J Mechanical
I I Fire Protection [ I Electrical [X] Other(specify Civil
for the above named project and that to the best of my knowledge, such plans, computations and specifications meet
the applicable provisions of the Massachusetts State Building(:'ode, all acceptableengineering practices and all
applicable laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with thcdocuments approved for the building
permit,
l Jpon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned
portion of the work.
,,, 0off
Signature and Seal of registered professional *0 '.� ,.
tic e' k,
A r< t►
o
I, .qi * "' 4e
, N.. 40..s*6.66yde, #
C...__i� t a `' t
I
ie) a.
//��/,�RECEI\) ® CURTISA EDGIN AIA,N AR.B
. L 111 Y II4......... JAMES M HANIFAN.A I A NC ARB
• El Pir KENNETH R JODRIE.AIA.LEED AP
JUL ' 3 M" BERTRAM W.GARDNER.AIA,NC ARB
CAOLO & •0 �T� p`� SOCIATES , INC .
A R C H I T E C T U R E • PLANNING I N T E R I O R D E S I G N
LETTER OF TRANSMITTAL
TO: City of Northampton DATE: July 13, 2011 JOB NO: 201030
Billing Department ATTN:
29 Center Street RE: Northampton Police Dept. HQ
Northampton, MA 01060
WE ARE SENDING YOU:
▪ Attached ❑ Under separate cover via Handcarried the following items:
❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications
❑ Copy of letter ❑ Change Order ❑
COPIES DATE NO. DESCRIPTION
3 Stamped and Signed Specification
3 Stamped and Signed Drawings
5 Stamped and Signed Affidavits
THESE ARE TRANSMITTED as checked below:
❑ For approval ❑ Approval as submitted ❑ Resubmit copies for approval
• For your use ❑ Approval as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
❑ For review and comment []
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US
REMARKS:
COPY TO: file
SIGNED: ,/ e4, Nowt
If enclosures are not as noted,kindly notify us at once.
I -l `. 1, - 1 .1Il;i • 1 1 f.I :al_ �1� f. , r�