Loading...
31B-282 . _ JhallI, , , l J(aooachue16' A 1 [ o�< - o �ai g `tt yyy efki 9 fwe5 gloom/130d So64n5 4aooadwdef#o'0,2108-1618 - , ,: °off s 9ne-/617/ 727-3200 .L a eFaar/617/ 7,27-573,2 Jaaf `` rEpi CF DWI DING in, .- ti`' CONSTRUCTION CONTROL DOCUMENT N°R7"AM rcv Project Title: City of Northampton—New Police Station Project Date: 6/10/11 Project Location: Central Street,Norhtampton Ma Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking structure. Demolition of existing police station building. In accordance with the 6th edition of the Massachusetts State Building Code: I,Curtis Edgin, Mass.Registration Number 7352 being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [X] Entire Project [X] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other(specify) for the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. Furthermore,I understand and AGREE that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved by the building permit and shall be responsible for the following as specified in section 116.2.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for the building permit,and approval for the conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine,in general,if the work is being performed in a manner consistent with the construction documents. I shall submit periodically,in a form acceptable to the building official,a progress report together with pertinent comments. Upon completion of the work,I shall submit to the building official a final report as to the satisfactory completion and readiness of the project for occupancy. iii, e, Signature and Seal of registered professional: S corns A. ,144. , 1: ijw She, Wonuotontelealiko, 01 / 44 / 1 • LL " ' . V 13aadani, J1aaaackriAie 02708-7678 Wwiter/677) 727-3200 ZuII c3 z (61 7) 727-5732 DEPT.OF BUILDING INSPECT ,•:,, NORTHAMPTON MA,070600 SECONDARY CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) Project Title: City of Northampton—New Police Station Project Date: 6/10/11 Project Location: Central Street,Norhtampton Ma Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking structure. Demolition of existing police station building. In accordance with the sixth edition Massachusetts State Building Code,780 CMR: T4)6 L A S S. L443 i G Mass.Registration Number 4 - 33 being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection 'Electrical [ ] Other(specify) for the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit. Upon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned portion of the work. gt-' *NCF 4 70 i • DOUGLAS yG Signature and Seal of registered professional: v LAJOIE �,V ELECTRICAL ,0 42533 �? i�0�9FGISTE. '1c. SiONAt.ts4 Wommonweetak " i / 1 1 / 4 I e9() �1����t�„ f/In ,Yacei de mi1301 PWoata,, e�aaaactuca /02108-7618 till i 3h nei(61 7) 727-3200 DEFT:RF BUILDING INS t Cpgp NS 3air(61 7) 727-5732 SECONDARY CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) Project Title: City of Northampton—New Police Station Project Date: 6/10/11 Project Location: Central Street,Norhtampton Ma Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking structure. Demolition of existing police station building. In accordance with the sixth edition Massachusetts State Building Code,780 CMR: I, Sm I "l2 • Mass.Registration Number 41 2. i 5 being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural 1.4 Mechanical Fire Protection [ ] Electrical pi Other(specify) TujyriN 1.1G for the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit. Upon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned portion of the work. (11/1/Signature and Seal of registered professional: stArn_ort DELBERT B. �`� MECHANICAL 4t21$ o �w tip�op,9FGIST�P,09> ►i;SS/ONAk-� ►n gisw Wometionaseallive# A"' t Asuiazoistalettee IF & 1301 ioalosK aaoac4uoe 4'02108-16.18 one'(617) 727-3200 DEPT OF BUILDING INSf ELT Saar 727-5732 NORTHAMPTON,MA 01050 SECONDARY CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) Project Title: City of Northampton--New Police Station Project Date: 6/10/11 Project Location: Central Street,Norhtampton Ma Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking structure. Demolition of existing police station building. In accordance with the sixth edition Massachusetts State Building Code,780 CMR: I, C t?A!C7 fr?ENGlf — Mass.Registration Number 4/5-0 3 2- being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: [ ] Entire Project [ ] Architectural )Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other(specify) for the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable laws for the proposed project. Furthermore,I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit. Upon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned portion of the work. Signature and Seal of registered professional: os CRAIG S. y FRENCH m STRUCTURAL No.45032 / - \, TA ism H �ø44di �= pat:4 D*.c A44444.144. la, R�+. 1341__ - _ M it ye ., 144440 c1'4, 02108-1 1 A� (611) 72?-3200 i 3 20H fMt (617) 727-5732 DEPT.OF BUILDING INSPECTIQNS NORTHAMPTON,MA 01060 SECONDARY CONSTRUCTION CONTROL, DOCUMENT (for Professional Engineers/Architects responsible for only a portion of a controlled project) Project Title: City of Northampton New Police Station Project Date: 6/101 I I Project Location: Central Street, Norhtampton Ma Scope of Project: Construction of a new 36,300 square foot police facility and new raised parking structure. Demolition of existing police station building. In accordance with the sixth edition Massachusetts State Building Code.780 CMR: I. Dana C. Huff Mass. Registration Number 34729 being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans.computations and specifications concerning: I I Entire Project I ) Architectural I I Structural [ J Mechanical I I Fire Protection [ I Electrical [X] Other(specify Civil for the above named project and that to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building(:'ode, all acceptableengineering practices and all applicable laws for the proposed project. Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with thcdocuments approved for the building permit, l Jpon completion of the work,I shall submit a final report as to the satisfactory completion of the above mentioned portion of the work. ,,, 0off Signature and Seal of registered professional *0 '.� ,. tic e' k, A r< t► o I, .qi * "' 4e , N.. 40..s*6.66yde, # C...__i� t a `' t I ie) a. //��/,�RECEI\) ® CURTISA EDGIN AIA,N AR.B . L 111 Y II4......... JAMES M HANIFAN.A I A NC ARB • El Pir KENNETH R JODRIE.AIA.LEED AP JUL ' 3 M" BERTRAM W.GARDNER.AIA,NC ARB CAOLO & •0 �T� p`� SOCIATES , INC . A R C H I T E C T U R E • PLANNING I N T E R I O R D E S I G N LETTER OF TRANSMITTAL TO: City of Northampton DATE: July 13, 2011 JOB NO: 201030 Billing Department ATTN: 29 Center Street RE: Northampton Police Dept. HQ Northampton, MA 01060 WE ARE SENDING YOU: ▪ Attached ❑ Under separate cover via Handcarried the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change Order ❑ COPIES DATE NO. DESCRIPTION 3 Stamped and Signed Specification 3 Stamped and Signed Drawings 5 Stamped and Signed Affidavits THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approval as submitted ❑ Resubmit copies for approval • For your use ❑ Approval as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment [] ❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: COPY TO: file SIGNED: ,/ e4, Nowt If enclosures are not as noted,kindly notify us at once. I -l `. 1, - 1 .1Il;i • 1 1 f.I :al_ �1� f. , r�