Loading...
34-036 (6) 3 Ly _ 03 ` „e - ENERGY STAR Qualified Homes � . .- Thermal Bypass Inspection Checklist Home Address: 1 i O : t i,'c , // � R; City: /11.'; ate c iii State: 1 Thermal Bypass Inspection Guidelines Corrections Builder Rater N/A Needed Verified Verified 1. Overall Air Barrier Requirements: and Thermal Insulation shall be installed in full contact with sealed interior and exterior air barrier except for alternate to interior air barrier Barrier Alignment under item no.2(Walls Adjoining Exterior Walls or Unconditioned Spaces) All Climate Zones: 1.1 Overall Alignment Throughout Home ❑ ❑ RV ❑ 1.2 Garage Band Joist Air Barrier(at bays adjoining conditioned space) ❑ ❑ 113- ❑ 1.3 Attic Eave Baffles Where Vents/Leakage Exist ❑ ❑ CV 1 ❑ Only at Climate Zones 4 and Higher: 1.4 Slab-edge Insulation(A maximu %-of-the-slabb ) ❑ ❑ ❑ uninsulated in Climate Zone .)p,,wtid 7. F,4 Id:et „,f;' t u,. Best Practices Encourag d,Not R t --- 1.5 Air Barrier At All Band a Zones 4 and higher) ❑ ❑ ❑ I ❑ 1.6 Minimize Thermal Bridging(e.g.,OVE framing,SIPs,ICFs) ❑ ❑ ❑ ❑ 2. Walls Adjoining Requirements: Exterior Walls or • Fully insulated wall aligned with air barrier at both interior and exterior,OR Unconditioned • Alternate for Climate Zones 1 thru 3,sealed exterior air barrier aligned with RESNET Grade 1 insulation fully supported Spaces • Continuous lop and bottom plates or sealed blocking 2.1 Wall Behind Shower/Tub ❑ ❑ El*"" l ❑ 2.2 Wall Behind Fireplace ❑ ❑ [j V-- ❑ 2.3 Insulated Attic Slopes/Walls ❑ ❑ D-`' ❑ 2.4 Attic Knee Walls ❑ ❑ ❑ g 2.5 Skylight Shaft Walls ❑ ❑ ❑ 2.6 Wall Adjoining Porch Roof ❑ ❑ ❑ 2.7 Staircase Walls ❑ ❑ ❑ 2.8 Double Walls ❑ ❑ ❑ X 3. Floors between Requirements: Conditioned and • Air barrier is installed at any exposed fibrous insulation edges Exterior Spaces • Insulation is installed to maintain permanent contact with sub-floor above including necessary supports(e.g.,staves for blankets,netting for blown-in) • Blanket insulation is verified to have no gaps,voids or compression. • Blown-in insulation is verified to have proper density with firm packing / 3.1 Insulated Floor Above Garage ❑ ❑ ®/ ❑ 3.2 Cantilevered Floor ❑ ❑ ID ❑ 4. Shafts Requirements: Openings to unconditioned space are fully sealed with solid blocking or flashing and any remaining gaps are sealed with caulk or foam(provide fire-rated collars and caulking where required) 4.1 Duct Shaft ❑ ❑ [a/ ; ❑ 4.2 Piping ShafUPenetrations ❑ ❑ L4' 1 ❑ 4.3 Flue Shaft ❑ ❑ (Z2('''~I ❑ 5. Attic/Ceiling Requirements: Interface • All attic penetrations and dropped ceilings include a full interior air barrier aligned with insulation with any gaps fully sealed with caulk,foam or tape • Movable insulation fits snugly in opening and air barrier is fully gasketed 5.1 Attic Access Panel(fully gasketed and insulated) ❑ ❑ Ei--r ❑ 5.2 Attic Drop-down Stair(fully gasketed and insulated) ❑ ❑ ❑ Zi 5.3 Dropped Ceiling/Soffit(full air barrier aligned with insulation) ❑ ❑ ❑ M 5.4 Recessed Lighting Fixtures(ICAT labeled and sealed to drywall) ❑ ❑ B37. ❑ 5.5 Whole-house Fan(insulated cover gasketed to the opening) ❑ ❑ ❑ X 6. Common Walls Requirements: Between Dwelling Gap between drywall shaft wall(i.e.,common wall)and the structural framing between units is fully sealed at all exterior Units boundary conditions 6.1 Common Wall Between Dwelling Units ❑ ❑ ❑ Home Energy Rating Provider: L f,r7 Rater Inspection Date:;(fr,Jr; f 'J, Builder Inspection Date: Home Energy Rater Company Name 'r ex 11.0 �4 )(,';/4WtiirtjBuiider Company Name: Home Energy Rater Signature: .(4' '''r'; ° ` '7/Builder Employee Signature: 3 - d3C AIR LEAKAGE REPORT Date: September 04,2013 Rating No.: 064-12 Building Name: 320-2 Turkey Hill Rd Rating Org.: Power House Energy Consulting Owner's Name: Phone No.: 413-835-5162 Property: 320-2 Turkey Hill Rd Rater's Name: Matt Turcotte Address: Northampton,MA01062 Rater's No.: 1497133 Builder's Name: Michael Banas Weather Site: Northampton,MA Rating Type: Confirmed File Name: 064-12 320-2 Turkey Hill Rd FINAL.blg Rating Date: 8/29/13 Blower door test Whole House Infiltration Heating Cooling Natural ACH: 0.13 0.09 ACH @ 50 Pascals: 1.78 1.78 CFM @ 25 Pascals: 365 365 CFM @ 50 Pascals: 573 573 Eff.Leakage Area: [sq.in] 31.5 31.5 Specific Leakage Area: 0.00009 0.00009 ELA/100 sf shell: [sq.in] 0.77 0.77 Duct Leakage Leakage to Outside Units ducts CFM @ 25 Pascals: 67 CFM25/CFMfan: 0.0719 CFM25/CFA: 0.0263 CFM per Std 152: N/A CFM per Std 152/CFA: N/A CFM @ 50 Pascals: 105 Eff.Leakage Area: [sq.in] 5.77 Thermal Efficiency: N/A Total Duct Leakage Units CFM25/CFA Total Duct Leakage: 0.1200 Ventilation Mechanical: Exhaust O nlyl Sensible Recovery Eff.(°/°): 0.0 Total Recovery Eff.(%): 0.0 Rate(cfm): 55 Hours/Day: 24.0 Fan Watts: 12.4 Cooling Ventilation: Natural Ventilation ASHRAE 62.2-2010 Ventilation Requirements For this home to comply with ASHRAE Standard 62.2-2010 Ventilation and Acceptable IndoorAir Quality in Low-Rise Residential Buildings,a minimum of 55 cfm of mechanical ventilation must be provided continuously, 24 hours per day. Alternatively,an intermittently operating mechanical ventilation system may be used if the ventilation rate is adjusted accordingly. For example,a 111 cfm mechanical ventilation system would need to operate 12 hours per day,as long as the system operates to provide required average ventilation once each hour. REM/Rate-Residential Energy Analysis and Rating Software v12.99 This information does not constitute any warranty of energy cost or savings. ©1985-2012 Architectural Energy Corporation,Boulder,Colorado. ao x gl — C o o n aY x cn o m ; 3 � �_. n " ._.L� m �'+�,' Q U < mi : i yY 3 awi m m ` m < ', 3 0 w N a = se A rt in -+ o o m < I o a` , olw tin l c.m j• - F w L) .'i ° m w ° • �C -" v z m w m o' a s o f o, a g c d -- o N w ° m m ( O I O 2 f: 3 < m , N. "• 7o m m ° m o ti m �' 3 ° m o m `` o ° ° !01 cc � m w � a m v, O �' �, �' 3 m O , N co w rv� w rt Oo ° �, w co M a)N w w .. O• O { x x xi 70 - j m x 0) o D ° w m ") _ cn 7p �' � ,_�o o w x O ° m w p O ID O Mk:, O O c0 (O - . A) O C 00 i O W H��, N W N oa C '' O O a""', d .,t O in n 'O„ a N ar;iu, g j,i�.Nn! Iv c CD n m y o 0 0 C' ' - ° K o o w �', c Fi° o� n xp y N N Q I- h� N w ai o C C7 c n Q Ii , o c_n m m � o w p Cfl 7 ,mT,,,N.,ii. ,,,,:,:,,,,,,,,,,,,,,,.. o- -!3 0 (1) .03 ir.) yritiz3 y O (D cD CAD O N +ji 01 * SD ' to CO Z W 14 �G ffi1 O y n 0,1':i!,,, � y O) Cn c.a Io Z 'O Ul CD 9 7 CJl m ila O• co 7 O O S 7 'k,rt 0 cJl cn 0 I L — rn :. O O O '! rF G1 `� �e °' Z `�` m rt w ° w °o act -s N • m N c Ti e Ill pi Clikti 00 0 O # T N cD , Vii,% �i N O Q 3 � 2 C Z7 . m '1 L. co N P < m cn • rn m O N O•. O O cD cD ,fiiNk v W IV '7 ,,�U�r it.O-t ° ICI '_� W f.,A t7 `^fi s O = Wp i '1%,„•,. m cn �, �u�4 ; " cnl � n L___ iii: f. CD w GI wt -,1 W CI it is y 3 N p, wI 1 t1 (7 D () x o a ° w ° o o CD o DO m y3 r 5 fi:•.: 0 CD ° =- O ff-. ,` . ,' o m o w - -. m Cn r �r'... m < w (0 (O C �' a m ° -o w u) I i: O N N i�t4.: A) c) ' �. P1 N fs W n �`; c c 0 m m Z ce I, IP a) 3. t l,, co G O1 C a _ O t Ii ;=. ¢ .p E 7 3 ;_ ,,..k.--) =a) ? '. O ti a' O V W W co = C t` y; _L —I N 'i n it O Ul Ce) C 3 4,, ' W C ��, ° co ,r; m m o EP H ° „ CD °• S 'C sc n�i c» n c Irk,i10 a f5 3 ) ffl t9 c0 ) Ul N C N iq ' 3 � :1 N O O O Ul CJ7 O �.► 3 ,u C AMP' �r , t CZ 3 O 0 O c0 1 V G) CD t}t"4 O O O O O O O Y zra 320 TURKEY HILL RD-UNIT 2 BP-2013-0266 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 34-036 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:renovation BUILDING PERMIT Permit# BP-2013-0266 Project# JS-2013-000434 Est.Cost: $165000.00 Fee: $990.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: KEITH HAMEL 78114 Lot Size(sq. ft.): Owner: BANAS MICHAEL P 7_onina_ Applicant: KEITH HAMEL AT: 320 TURKEY HILL RD - UNIT 2 Applicant Address: Phone: Insurance: 48 BURT RD (413) 563-7270 WESTHAMPTONMAO1027 ISSUED ON:9/21/2012 0:00:00 TO PERFORM THE FOLLOWING WORK:REPAI R FRAMING,ISNULATE, SHEETROCK, FINISH UNIT 2 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: t House# Foundation: Driveway Final: Final: a$-j3 Ks, Final: 11-t3 - r 1? No N+u-� 6.4c �- Rough Frame:r ;F A ; ��" A) v,,,,G-r.",!:.1, t..-,..-» Gas: Fire Department 2-/6 V Fireplace/Chimney: ajo tit Ic:� - :inn: 1/17/ / 2G� Rough: Viii: - � %�,,( / NstJ L' �.►..� ode _ ! Final: Smoke: /�3 j Final: „�(j-1,3 THIS PERMIT MAY BE REVOKED BY T . CITY OF NORTHAMPTON UPON VIOL TION OF ANY OF ITS RULES AND Certificate of Occupancy 171 Signature: FeeType: Date Paid: Amount: Building 9/21/2012 0:00:00 $990.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck-Building Commissioner 0:1 c/2 07z Ln C P w n 0"trq , n (D + tt 1.fi C H r i-i . '� f�D f0 4. u`C A n E co 0 rr ° �t n a tiw � � Cr) � � y tnD r ro A aq gt w Cs. FL CL — OVo r+• "" O A+ ti 5. p ` J /�rD (11 -"*".' ct n a r") ( J p ¢, o O `.� _ �., vii �.+• p _ z A O .' N• l J �+ C �"i o ~ CD 0 ^,: rD , o° Mme►• (n S, s. c" `C n M dG 1-,• ° _ S, N• q FOB 0 n rp rD rrD v, r� Ry `^J !�+ ......N e.i. et .. " P tg 2 z- Z r41) a, . , „D ..,,4,--.° p- : .‘....1..1.% 0:1. 4-4, ti 'y O Q -• A ~ n �t n O 1� ro O o n U. rD z•'' �o F ' n ` N n O A ^ L n /"r. D a o ct r � c 4- `Ti CA 4 orD I ;01 CA y d y d cD A. ^° ti. w cc, Z.* ° c$1, eD d ?r eta 0 et Zs r' m O: eta o Cl) FA ¢' n w C p A., • °' 0 0 m ft rnmi O P c, , cr rD W • A `�_ /� :t.5'7 '•r ON P Oq Z. O 320 TURKEY HILL RD-UNIT 2 BP-2013-0266 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 34-036 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:renovation BUILDING PERMIT Permit# B P-2013-0266 Project# JS-2013-000434 Est. Cost:$165000.00 Fee: $990.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: KEITH HAMEL 78114 Lot Size(sq.ft.): Owner: BANAS MICHAEL P Zoning_ Applicant: KEITH HAMEL AT: 320 TURKEY HILL RD - UNIT 2 Applicant Address: Phone: Insurance: 48 BURT RD (413) 563-7270 WESTHAMPTONMA01027 ISSUED ON:9/21/2012 0:00:00 TO PERFORM THE FOLLOWING WORK:REPAIR FRAMING,ISNULATE, SHEETROCK, FINISH UNIT 2 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: ,gyp Meter: ( /3f a/ 1' Footings: Rough: `I 406 /-4 Rough:/0 / / House# Foundation: RPA Driveway Final: Final:e—2 _/3 Final: 2',i3 _ 12 at, ,• .. AA! (f f"c 1 Rough Frame:O)�' 0.---7-/ p j(,- i„J u.,,(rr.r.':), s i t..m.-.67 - �/ Gas: Fire Department 2-/6 v n Fireplace/Chimney: 2i,'" cArNi- Rough: Oii: � @.'t I: ticn: WI— 743C- 141,...._, '''r we Final: Smoke:c,423{5 Final: q,,614,5 Ce i� THIS PERMIT MAY BE REVOKED BY T , CITY OF NORTHAMPTON UPON VIOL TION OF ANY OF ITS RULES AND ATION:'1 �` - ,: _,.,..", T, ,: z t',: .,,.,_„,il''; Certificate of Occupancy i �� Signature: FeeTvpe: Date Paid: Amount: Building 9/21/2012 0:00:00 $990.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner