Loading...
38B-112 (6) HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, "Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a home owner." The building department for the City of Northampton wants person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed). insulation inspection (if required)and a final building inspection. The building department requires these inspections before the work is concealed, failure to, secure these inspections can result in failure to obtain a certificate of occupancy, until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing&gas)the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made Za7----67/2/, �' understand the above. �7i � (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date J 2. a y Address of work location 3 7 ///7 /37-- ' / '' r1 " " / 6 The Commonwealth of Massachusetts _: : Department of Industrial Accidents Office Of Investigations 600 Washington Street Boston, MA 02111 �Y= www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly• Name(Business/Organization/Individual): eb 2g be /v, Address: 7 „4101/1,-c 3 11 City/State/Zip: �r jC� �� �flPhone#: -r V 0 (1-1)/ Are you an employer?Check the appropri fe box: Type of project(required): 4. I am a general contractor and I yp e 1.❑ I am a employer with ❑ g 6. ❑New nstruction employees (full and/or part-time).* have hired the sub-contractors 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. emodeling ship and have no employees These sub-contractors have 8. ❑Demolition working for me in any capacity. employees and have workers' 9. Building addition [No workers' comp.insurance comp. insurance.t re ed.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3. am a homeowner doing all work ❑ officers have exercised their 11. Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.E Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: _ Policy#or Self-ins. Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties ofperjury that the information provided above is true and correct. Sittnature: Date: V2— 7/0 Phone#: .5 V-- 4 L. Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable El/ Name of License Holder: License Number Address Expiration Date Signature Telephone 9. Registered Home Improvement Contractor _ Not Applicable ❑ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes ❑ No ❑ 1L - Home O14rner Exemptioi1 The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned "homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement W' doves Alteration(s) n Roofing n Or Doors Accessory Bldg. ❑ Demolition ❑ New Signs [la] Decks [0 Siding[0] Other[ Brief Description of Pr�gpo d 1 "` Work: 1/01-4, II b 050A; 11Vi vUiO,,p(j ' S kal t t,. I UV 0033 Vt_ pet' 11401 4C.A/(e V Alteration of existing bedroom Yes ZNo Adding new bedroom Yes No f('c s. Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a. If New house and or addition.. o existing housing, complete the following: N/ 1 a. Use of building : One Family • e Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, , as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I, l L.4(, L k r1ti b ci - , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. 21(l-? 1- ell-k. Lb Mb ) Print Name c- _. --' L3 /l Signature of Owner/Agent` -, Dat Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L..._..__,..._ Rear Building Height Bldg. Square Footage % _. Open Space Footage ° (Lot area minus bldg&paved _ �W parking) #of Parking Spaces __..._ Fill: (volume&Location) A. Has a Special Permit/Variance/Finding/ever been issued for/on the site? NO 0 DONT KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Regi try of Deeds? NO 0 DONT KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained , Date Issued: C. Do any signs exist on the property? YES 0 NO G7 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading, ex vation, or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. - '-', A,,•-llti7ip,'S*- -— -vinig*M'li,,•,;t1t6:'4,i '-'12 -,0PPr,..1.r.o'',1444,.•4-..Z:',,34NegiPttPV'',.;"-- .::‘,'; -.-,.,,,, 4-r:iiiii ,•':•-,••--• •••4'',-u-,, •: 41'''.':'-',-,;,,,,L'.•'•,1:•-,1-' ••:i• ;-','fi-l'iS--,O,tRike4",f*Tizoeil::-,,,f.F1:;:::::,0::•:A;v17-.•:, ',.5,.,,. - ' 40-P77: itillrfi':- ,OP1' *AY- 1,i's,';':::,''''' '',:'''''''-'''''!'41:7:---,;,c.':-.' Dton ::._•,,,,,:,-..41-ip ,i4iltr .,.:--, , Northampton . S''''''',77;.3,- -it Av .•,-‘`,,,']'' --•<'i Plarl• ,,.,',,,:'„':::T.--.,•.,":",•••:,-,';,-,-;---,'...'',:.f.:',-• -• - City Of No Department , INI! astr-,9 ,]..,,,,,, .,,:.i,„_::-,,,.... ..... c._yl Building Depi......_,...4. Y;''.‘4,0V7in4 .;Z;:%':',:':•:,,,';'::::': '''''"‘ , LING I Bu2i1a2 main Street ,,,,,i8i/s .;• ,,;,:. '-f.,;"::'''.." --.• IL),DINE.- , ROOM 10u n1060 1972 1560.! ' - TWO FAMILY n MA - 587-'` :ottlE.:-.-- . OR , „,ntO ' Fax 413- A ONE i ISH'. Nertha2:1r240 F „ 443-58 \ office by..,.1.10ne ...,PAIR,RE b completed unit ' * '.--6CT,ALTER'tIc ,to e ..:0.. - sect' This TO CON-STR Lot PPLICATION District A. Overlay , TION A.. P ma RENOVATE OR DEMO,. ' F INFORM SITE 1 Zone zo SECTION o Address: r i I St District 1.1 Property mt '31- Elm k)11 ts 3(1 R r GENT A OWNERSHIP/AUTHORIZED 0 _ . A c._,4 Address: TY p OPER ' b(rv " Mailing Ad 2-PROPERTY Lo 04. Current CB District SECTION i j 0 l')C\ Telephone j°2 Telep 2,1 Owner of Record: te 114 A(Print) 7*c- 1 Nam- ' aturS— ' . . Sign d ACIent. Telephone Only . l Use On 2.2 Authorize 0 tiviAt.5-,5 Official Name(print) COSTS CO— Current Mailing Address: to be Permit Fee applicant. (a)Building Cost Of Signature ESTIMATED C Estimated . permit ,cyf 1 . Total 6) completed by p Estimated T from ( SECTION 3.. IM c0 (..\ ( ttth c.-(b)Estirpruction fr CONSTRUCTION 4 4-5 -) _ - (..) .1„ ri 012-3 Cons' .....it Fee Cost(Dollars) A.:5-7—* Building Perm Item BIIII $1 1. Building ,01 2. Electrical Number Nu— Check Only 0n 3 Plumbing c) Official Mechanical(HVA This Date 4. -e Protection , +5) Issued. 5 Fire 1-__ ,_ , ,-,4.3+`4: I Use Date 6 Total- (1 1-4 ' Section For Offi Building Permit Number: tor of Buildings Commissioner/Inspector Signature Building"m , File#BP-2009-0782 APPLICANT/CONTACT PERSON LOMBARD JOHN&ELIZABETH J ADDRESS/PHONE 39 MUNROE ST NORTHAMPTON PROPERTY LOCATION 39 MUNROE ST MAP 38B PARCEL 112 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid tit����77 Typeof Construction: INSTALL 6 REPLACEMENT WINDOWS,3 SKYLIGHTS&WOODSTOVE New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE F LOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON IN ATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission _ Permit DPW Storm Water Management Demolition Delay 2 Zc Signature of Buildi :Offi ial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. ROE ST f BP-2009-0782 GIS#: COMMONWEALTH OF MASSACHUSETTS Mart:38B i i2 a' CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: BUILDING PERMIT Permit# BP-2009-0782 Project# JS-2009-001168 Est. Cost: $4500.00 Fee: $55.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq. ft.): 7405.20 Owner: LOMBARD JOHN&ELIZABETH J Zoning:URB(100)/ Applicant: LOMBARD JOHN & ELIZABETH J AT: 39 MUNROE ST Applicant Address: Phone: Insurance: 39 MUNROE ST NORTHAMPTONMA01060 ISSUED ON:4/2/2009 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 6 REPLACEMENT WINDOWS, 3 SKYLIGHTS & WOODSTOVE POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 4/2/2009 0:00:00 $55.00331 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo