Loading...
12C-082 a native perennial grass mixture. Any stabilization materials such as jute netting shall be firmly anchored to prevent them from being washed from slopes by rain or flooding. Preference should be given to biodegradable materials. 10. All disturbed areas shall be graded, loamed and seeded, or stabilized with erosion control blankets or netting, and a covering of straw mulch prior to November 30, of each year. No disturbed areas or stockpiled materials will be left unprotected or without erosion control after this date. 11.No disposal of soils or other materials shall be allowed within: a 100-year floodplain; 40 feet of the 100-year floodplain elevation; any wetland; or any area within 100-feet of a wetland, or 200 feet of a vernal pool unless such areas are specifically approved by the Commission, in accordance with 310 CMR 10.00, and City of Northampton Ordinances - Chapter 337. "ATTACHMENT A" 1. Prior to the initiation of any work,the applicant/owner shall submit a letter of understanding to the Commission stating that he/she has received, read, understands and shall comply with these conditions. The applicant, and,his or her contractor, foreman and/or construction manager shall sign the letter of understanding. 2. Prior to the initiation of any work,the applicant shall submit to the Commission a sequencing plan for construction, and erosion and sedimentation control installation. 3. Prior to the start of any site work, excavation or construction, a pre-construction conference shall be held on the site, between the contractor conducting the work,the site/project engineer, the applicant, and a member or agent of the Conservation Commission, in order to ensure that the requirements of this Determination are understood by all parties. Prior to the pre-construction meeting, all erosion control devices must be installed. 4. All required permits must be obtained from applicable federal, state and local agencies and departments prior to the start of any project. 5. A copy of these conditions and associated plans shall remain on site during all construction and/or building activities. The project manager and all equipment operators shall be familiar with the approved plans, and shall be informed of their location on the site. This location shall be accessible to all contractors whenever work is occurring on site. 6. All revised plans shall be approved by the Conservation Commission and incorporated into the permit by reference and shall be followed during the course of construction. 7. The areas of construction shall remain in a stable condition at the close of each construction day. Erosion control measures shall be inspected at this time, and maintained or reinforced as necessary. All such devices shall be inspected, cleaned or replaced during construction and shall remain in place until such time as stabilization of all areas that may impact resource areas is permanent. These devices shall also be inspected to assure that the maximum control has been provided. Any entrapped silt shall be removed to an area outside the buffer zone and resource areas, and maintained or reinforced as necessary. Erosion controls shall be inspected after every rainfall to assure that maximum control has been provided. 8. An adequate stockpile of erosion control materials shall be on site at all times for emergency or routine replacement and shall include materials to repair or replace silt fences, straw bales, erosion control blankets,riprap, filter berms or other devices planned for use during construction. 9. Soils exposed for periods greater than two months shall be stabilized with erosion control blankets and netting, a covering of straw mulch, or a temporary cover of rye or other grass to prevent erosion and sedimentation. Drainage ditches shall be stabilized and seeded with -----1 Massachusetts.Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office (see http://www.mass.gov/dep/about/region.findvour.htm)to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form (see Request for Departmental Action Fee Transmittal Form)as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. wpaform2.doe•Determination of Applicability•rev.10/6/04 Page 5 of 5 Massachusetts Department of Environmental Protection LBureau of Resource Protection -Wetlands 1 WPA Form 2 - Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity(site applicable statuatory/regulatory provisions) ❑ 6.The area and/or work described in the Request is not subject to review and approval by: Name of Municipality Pursuant to a municipal wetlands ordinance or bylaw. Name Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on p by certified mail, return receipt requested on 4av a', a013 Date Date ( This Determination is valid for three years from the date of issuance (except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission. A copy must be sent to the appropriate DEP Regional Office (see http://www.mass.gov/dep/about/redion.findyour.htm) and the property owner(if different from the applicant). Signatures: C-- — f it > ., (2°1—%—, c v v t t— II,- � , T // e - Ifl(AI a3, a013 Date wpaform2.doc•Determination of Applicability•rev.10/6/04 Page 4 of 5 L1 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 - Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: ❑ 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department.Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ❑ 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. ❑ 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ❑ 3. The work described in the Request(proposed garage only) is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). Please see Attachment A. ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. wpaform2.doc•Determination of Applicability•rev.10/6/04 Page 3 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands Lb, ----iii WPA Form 2 - Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s) is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions(issued following submittal of a Notice of Intent or Abbreviated Notice of Intent)or Order of Resource Area Delineation (issued following submittal of Simplified Review ANRAD)has been received from the issuing authority(i.e., Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s)is an area subject to protection under the Act. Removing,filling,dredging,or altering of the area requires the filing of a Notice of Intent. ❑ 2a.The boundary delineations of the following resource areas described on the referenced plan(s)are confirmed as accurate.Therefore,the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ® 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. ❑ 3. The work described on referenced plan(s)and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. ® 4. The work described on referenced plan(s)and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent or ANRAD Simplified Review(if work is limited to the Buffer Zone). (Applies to proposed driveway expansion only) ® 5. The area and/or work described on referenced plan(s)and document(s) is subject to review and approval by(Proposed driveway expansion only): Northampton Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Northampton Wetlands Ordinance C337 Name Ordinance or Bylaw Citation wpaform2.doc•Determination of Applicability•rev.10/6/04 Page 2 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out From: forms on the Northampton computer,use Conservation Commission only the tab key to move To: Applicant Property Owner(if different from applicant): your cursor- do not use the James A. and June E. Hardy Same return key. Name Name 19 Marc Circle I�I Mailing Address Mailing Address Northampton MA 01060 City/Town State Zip Code City/Town State Zip Code 1. Title and Date(or Revised Date if applicable) of Final Plans and Other Documents: New Addition for Residence, L-1.0 5/9/13 Title Date Title Date Title Date 2. Date Request Filed: 5/9/13 B. Determination Pursuant to the authority of M.G.L. c. 131, §40, the Conservation Commission considered your Request for Determination of Applicability, with its supporting documentation, and made the following Determination. Project Description (if applicable): construction of a 24' by 26'garage, approximately 50 feet from wetlands at the closest point, in an area that is currently driveway, deck, and maintained lawn. Embankment to match existing grade to be created and planted with shrubs/lawn, existing timber planter to be removed. Project Location: 19 Marc Circle Northampton (Florence) Street Address City/Town 12C 082 Assessors Map/Plat Number Parcel/Lot Number wpaform2.doc•Determination of Applicability•rev.10/6104 Page 1 of 5 � I H AMpT:, ��� ��, CITY OF NO N " �-� ,�:, `� PLANNING AND�fLTSTAINABILSI'Y• _ ,!J IJ N._ planning•conservation•zoning•northampton GIS•historic•community preservation•central business architecture i..i /l Sarah LaVally,Conservation,Preservation,&Land Use Planner•slavalley@northamptonma.gov•413-587-1263 May 29,2013 James A.and June E.Hardy 19 Marc Circle Northampton MA 01o6o RE: Determination of Applicability, 19 Marc Circle Garage Dear Mr.and Mrs.Hardy: Enclosed please find the original signed version of the above-referenced document for your files. Please refer to Attachment A for conditions that must be adhered to prior to,and during,construction. This determination is valid for three years. Please note that the driveway expansion shown on project plans will require additional review if it is proposed to move forward. Please feel free to contact me with any questions or concerns. Thank you, ,i fd-ill Sarah LaValley Cc: MassDEP WERO City Hall•210 Main Street•Northampton,MA oio6o•www.northamptonma.gov/OPD ; .ps•• ,•_• sY. ii'� x Mi1� "t O �' 4.f y,. (A O CA � 6 t. tt 7 C gi. \\\O CA „", ca 4.4Z. b0. .1:, 0 ,wr 0 y t > of 4+ ,-, .G 0 c b ‘,.7; i .= • a. U., L• =' rl •.7 1 ty` d X C N4 C0 lie. L y ..,,0: O 0 O▪ .0C 4+ ,. Z ' h y. 4, L 0 C L U t0 0 _V W W 0., 0 ... A, 'v C N T It V a. L rl t5 ,r O i. t0 e0 to b F txp d Y 0 y C4 . r y O ° U C F., d • �L At Z 1 t t,s d z N , W 5 : 0 �I "1'1 d L O tY `1 � I a i ■f t� � 4 C O Oy --1-- W Q Y it O W TA 4 A I V C{/) c W Z t.g ,, . 4, K Z —.1 U 4 i O 5 r kro D C y. a. I 1IIfIOtl cn f- Q n c 4 I f + ht 3 I • I J .e i 7,.. nn,.,:'",ii2olth•;'' ID • ''t. tt,•511'il'' It 4{4'i tt 't et e,n ., •, •,„ , , , .„, . .4 ,. 1 Unrestricted- „ buildings of any use group which contain less than 35,000 cubic feet (991m )of • • enclosed space. ,' a 1 -..tx•;”: . . .• •• -...,- < • . ' ?-,-!Y , , . 1•Te. '' : • < . . 's '42 l'!„-Ili-- ,,,,,,1,-.• Failure to possess a current edition of the Massachusetts State Building Code is cause for revocation of this license. •;';',i7i; { For DPS Licensing information visit: www.Mass.Gov/DPS '-''''' ';!:*,-' :. - • • • 17i ti''''''4'..':` • ,f <. v„,:•,-..-1•':',. <; ,'.,:t.,...-,•' • „ '..`, ,•••<1.i,-;" -""..4, :....,74:?.• s-•:',4 :',.<,f.• ,,,,,,e,,,,,,., ':,:,,...`t,,,•-..,'„:,,, „ •< ,..1/4 •., , Massachusetts -Department of Public Safety It't \--I Board of Building Regulations and Standards rr,,--- .,,I % ,*<•'.,,, Construction Stilicr%isor .F. el • License: CS-039970 ,-..! .•,?,. `-e.-41, ' ,r•-•,•tv 1, ‘ ,,..s. , -.,„. , . :.: 11••1,',1•5 , NORMAN F GLENN- if `a v*, 1 18 ASHLEY CIR ' •• - .---"• ,,,„t • EASTHANIJ'TOFMA.0 g , •••• . , , 11 T 4 '4 ''',4,4444 ,0 ' , . u I Expiration , • ,„, Commissioner •06/28/2014 • ‘ :,., ,, ,' , - • - . . , ...-, - - --- — ,..-,-, iS . f ','.•:, 1,`.!';',1•Z',44,'.",",;.:-.,„.' . ......-, ..,. . -. ,a, 4' 1 ,.,,;'. ii!rel ,,,,t, •. 4 4,,,,,„„ '.,• — IS ..... ,. , • . ,•- - \•"\ , • • , f■ $ l'..........' '...2.".... "--$,:\ , a, re N / , / / r .'.t--- ------11 . / , 3 , ...... ,..., . . . / / / '',..b ....‹. . /z / / / 1 / I S"i / z/' / 1 / 1 1 V■ 1 1 I // Z I , ••• 11.) 1 .2. ..--.‘ 1 / / . / / , / 1 1 . „, / / 1 / / / / i / I 1 ,/ 1 N; ........ .. . .._ ...... ....... .......,. I ---------,.... 1 I .\ I ! „ \ 1 ,.. 1 1 i 1 I I , I ! 1 1 I ! I I I ! ... I i 1 1 i -,.. , 1 1 \ 7 .. . ... -.., \ . • •,, , ...... --,- -,.. -I- I I 1 I 1 1 I 1 : I ! I I _I ..„„ --] i /, A / ,- • 1 l 1 1 C \ -_ --- 1 r---------- I, i I /i ,-i 1 e. / / 1 / f / i ' / / t: lit" -- __ ______- 41 ____ , iLifil .,.._, „_ -_,...____, .....,....„.,===,____...„.n, . _ , .4 _. ,..,... , ,,...... ,,.„, 1 • 1 d z >, d ,-- 0 Co Cl) I Cl) U) a) 0 E a) co 2 < z 0 0 c• _I N— COW — Q cla co c CO ' Cu) '22 r-- Cu z cNi 0_ C 0 O Z L() C 0 'Es 1 , - .9Z 0 Z.£ 'cr = (7). ....; u_ ci- ---1—ot..9 .. 01.,9 't It, - u) \' .... , c) ix) ce) r — r- °Vet, x(0 c‘j aC2 f ' °•=517—";917-6__73 00V8V r ----- - - EMI - -- 111=11 ----- - 1 I 1 A 0 Nr VI I 03 CNI CV I 1 CNI 0 (Ngl 1 Li- 0 6 I-- 0 0 0 FD 7"-• CO a) 4) :la' co I 1 Z cm ,-- cm (.3 cr9 I I < c I E _ci d .— I —1 — "x co) (24. io 6 E 1 , --,/ co 0- tz ce 1 i°.' •a- --- - \_ 1 i L_ . _I CD ED- 0 CO fu(.1 1:1= 0 i- -I 01 j 113 b i > 0). __I as (X. u) c I__I,4. Ti- m / csi ..ii- II — fo v-- b 0,i0 f) E. 01 Nr —J 1 , w a$ D 3 '-x c..,'" a) 0 0 Tr LL (.1 0 ru— I— +E' 0 ,...u) a) i., - ;a- I a) t C/) RI c w > in a) ,-- 1 12 c _he "0 mo I- I a3 c ea I Z o , iN, .4 0 7-0 b 0 01 , ta- , - - V 0 L.L.1 I _ cn --- _ _--- I 1 I L / 8.£Z 1 - __ _ _ _— (.5 Z .9Z — 0 < 0 2 a) hi T 7 - (1) / / 7 F.... < c 0 0, t. c2 I cuco F i S 0 0 I 0 >,— 1 11.. I c.. To ."7-6 c I 'E u) o '5 a ca a) -. ... .-c ._ 0 -------- 0- . 0 co c 0 ... .,C) 0 c,) _ • c b F — m c 0 b c 8 = ii 13 w i "c4N- N § c ."2" a) c ti. 0.. a 4, a) 2 x S2o as Z + 3 E 8 E u) u) 0 ■;r I 11.1 , cy.) b = = -. .E b E -0 -6 c c ..- 1 _c I —i x .E_ •—x E W 15 i N I E b p E O 0 (i..1 ° .— a) , N C (N1 N-- — To 0..° `-- < --Cn- fu Ci , E ...- co t--- 3 c) W 73 -rn IP 1 C a) /1 1 I -u) - -wo,u) c) co 0 , < w r) ..k° I a o , c., 1 <pc: -— _,._,-- c.-)c) to 1 Z co - 0 va) c.)" coC" 1 b0 \ I -6 '-c"o EN 1 < :i. 150 I.5 g as - —J I _1E a (.) .2 1 Cl) •4 — -.5 ,s 1 co a) g I a. § = E 0 8 1 1 c 1 '0— Z <7= 1 \\ "E ■ 1 «) i 1 \ 1 01 0 8,t7Z __-\ co cpc r —\\_\\ , / 01 I-- co 1--• I X\ \ c _.... .9 I ZO 9.0 I. o oc oco CI Z L .4- co ■ , --, c .9 c° LI.1 as as 2 c -2-1. c -a LIJ N CO .0("5 71-c\I Ns- 12 CO ;3 fx) w U) a) a) ii2 - 0 -.F. - :,t, I c CO co I co (v) (.1 (.1 0 z F- < 22w X CL 847 - I , f .6Z i_ , ' :=... •Q C..) VA .N Z o 13 V 0 .— >6% 0-"...... ,., 13 A cu i u) < 03 '5 0 cn E a) 0 0) o c () < - %...) — if, c:, T. LL. 8 ■......, 13 CD CI) F ,.. L. C..) c. N(z u., as c cc — .. — h- Li_ - LL. a) 2 112 Z co • 11: • g a) o CS . Cr —) •—• I-1- CC) (1) 0 —I A----.. cr) c) c() (.9 ,..„, in co co .9Z .171. I, .9 CO OM' OVVZ ...... C) as ‘t NI- CN1 74- c \ li as • ......., LO 76 = as 0 co = (4-6 ci 13- ft, a) io o / Ps I / C Cl) -y- > .,_. ..... t I Ta_ b - ..E., c 0 o @ 2 as -0 I z-,I -0 • 8 E 2 ai. ''t ma, -Ni be I ..-- .c- a) Z 4g -77) 8 2 (ci &x -g w .4. .— _6 :1-_-.ZN LE 3 *-- o —.I "6 1— — To Z0 ,_ X 0 ..-. -C -CI NI 0 CL — a- a) 0) -- b 0 (lip ,- z --- cN E is 7,,- 0 c @ a) ,_ r.... Zs) o s.g c i=';, 11) ..E. g x M LL-0 a) cp -1- ca. NI ° "' .6 CD 13 ',NCI- .(7) E C\I 0 al a 0 .--. 'T) v 2 -• c o ,-- .c < Zs) ,c)w - — c.) I 0 NI 6 (33 0 ,a- 0 E a, .1- c . :T‹ a) = i CN1 ,- :E c co r. -J ,- CD 0 as a) us Ns- 8 > EN = T:1 1 LL 2 MI >. c.) ci ....1 . _ Fs a) c • .c 0) t ci ZNi CI CI.'Co "E '1: ••■=. 0 b e4 o c o .—o H o 0 1—4= o .— (/) 0 CC .-.... = 0 6 v.)........ us 1 _x _ -_ EN __ ..- --- / .. : =ism 1. -_ -- /- 1 r - ---—I -a- ,--— 1 Z•1 1 co —I A— I x /,--, COI 0,1 AL I CD a. /4 ) 1 u .. -- :) H 01 T R11 C■1 N 1 I So ,_____ iN I, 1 IIMMMMME I Cr) , smom■im■■••■•■1 l' L 999 911 1 tm. p,t7 , Z,6 ›"Z' --,Z ---1 w < a) X s cl) w a) .9Z —fr O § z 0) < -6 a § 0 w zo r) 0 c 13 CD C I C 0 a) Z -o (..) as -'-' v 2 as 'E F— - c 0 00 co 5 a) a) > E 8 0 o a) 0 C -- 0 E co Z a) v Z a) as - 1= a) > (i) > 8 0 (/) ,— o 13 E R E a) a) w r: 0 City of Northampton Massachusetts :* f{ k t cfr, ;Z: Or" "I't t rte ar r t DEPARTMENT OF BUILDING INSPECTIONS tf 212 Main Street • Municipal Building Y v° { a Northampton, MA 01060 sy .- INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines"Homeowner"as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work(electrical, plumbing & gas)the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location NN A t..Ui/tl/LUlirrGL44iJi U) 1rAIA•3Ml.l.tii s3GLia Department of Industrial Accidents Office of Investigations i1= --4* 600 Washington Street ~ = Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name(Business/Organization/Individual): ,2/ f,�j3''% � ��/l Address: City/State/Zip: % ,/74 O,V Phone#: �jJ _ 6jtJ Are you an employer?Check the appropriate box: Type of project(required): 1.0 I am a employer with 4. [] I am a general contractor and I employees(full and/or part-time).* have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. Q Remodeling ship and have no employees These sub-contractors have 8. Ej pemolition working for me in any capacity. a oyees and have workers' [No workers' comp.insurance t 9. Building addition om p.insurance. required.] 5. We are a corporation and its 10.0 Electrical repairs or additions 3. I am a homeowner doing all work officers have exercised their 11.El Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL y t p c. 152, §1(4),and we have no 12.0 Roof repairs insurance required.] ' 13.(� Other employees. [No workers' comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby certify under the pains an, en ',, ofp,erjury that the information provided above is true and correct. � Signature: Date: Phone#: II Official use only. Do not write in-this-area. to be completed by city or town official II City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 7 Building Department 3. City/Town Clerk 4.Electrical Inspector S.Plumbing inspector 6.Other • Contact Person: Phone#: SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: �✓/.7 6.F 77 License Number Address Expiration Date Signature Telephone 9ResiisteFecl dome Imarovement Contractor' �__ __v. Not Applicable ❑ Company Name / Registration Number Address Expiration Date % ae Telephone J�� 7 � SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M AL L c 152,§25C(6)) Workers Compensation Insurance affidavit ust be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the buildi permit Signed Affidavit Attached Yes No ❑ 1. Hvtroie O47vnerEieptiori The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature SECTION 5= DESCRIPTION OF PROPOSED WORK-(check-all applicable) _ ,, New House Addition [ Replacement Windows Alteration(s) Roofing ri ❑ Or Doors El Accessory Bldg. ❑ Demolition n New Signs [D] Decks [El Siding[D] Other[D] Brief Description of Proposed c� Work: ��.'-AZy '�B r�h4Ryd A 6)0 //..e%`"/ C ?Iga/0 Alteration of existing bedroom Yes 1/ No Adding new bedroom Yes /No Attached Narrative /� > Renovating unfinished basement Yes i/ No (- Plans Attached Roll S— 6a !f<New.t ou is nd or add tion -existinq ihousitT coripi"ete. he= aUow'rraq: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: �/ Number of Bathrooms c. Is there a garage attached? c /u`vf�'/�p�f ,,e-- / d. Proposed Square footage of new construction. 2/6%�./TDimensions a V 6 e. Number of stories? ��/0 f. Method of heating? l'i/J °✓ Fireplaces or Woodstoves _.,./P Number of each g. Energy Conservation Compliance. ✓ Masscheck Energy Compliance form attached? h. Type of construction ..2 / i. Is construction within 100 ft.of wetlands? / Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade ./0./ k. Will building conform to the Building and Zoning regulations? !/ Yes No. I. Septic Tank City Sewer v Private well City water Supply SECTION T,a OWNERAUTHORIZATION TO BE:CdMPLETED WHEN- _, OWNERSAGENT OR CONTRACTORAPPLIES FOR BUILDING PERMIT I, JA-m47--s- 4. <<1-Ap , as Owner of the subject property ,, / hereby authorize .4/U •�A/ -/ N t• = • - • •ehalf,in all m- ers relative to work authorized by this building permit applic lion. .............--,,,:hirdo0411111F—..........ii ,c--// /3 -1WItrA III.In 1 et Date I, ./1/0/4)/ 74j./1 2 1�/- X, , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the paint and penalties of penury. Print Narne /Signature oftmer/Agent Date N Iip 1 , $ I oo 2 I W N tr, 0 o o--. QQSn - m oc) cn � o S `r)i -a 0 g g � m . (n � � � z z ° pm ""I E � � � c,c) O � ZO Z � r = v) rn Z PC O -I V 00,. C)) m e v, (n r* � z z z C ,'1,1:1,, N ° Z O NV: y �' o o • =p .. z 1z12 7:1 = c m 1 rn � o e � r � o � ;' Po 03 II W c)rn o zc zmrn O o Q N AD oc oZ O � � � c) m (n *) ° mod Z n o � "= Q N m zQ CO 0 o v p � c) 8� iz G.) m„,�y� ;moo N ---I C w °z D • * 73 CD Z 0 "VO v Z O (/) �6 M V) <O .-z7 Z m CA o N- X1 m W -G •h W WQn cn O1 A cri ` -0 0 rn ;' V) Cl) V) RI Cri p ON Z m II ° P o m . co r Z 4 o rn I O o mC r 0 , k rn co Qoo R° , Z1 ° C CO _. 0 0 rti z C II c')� i,,-; rn r- v) m Ln m c7 Z Ol 0 * `:ge, w/ ...; ' i Z7 m . > O O n cy) r A C D z<, J N y 0 r Z D _ M O 1 z m p „ Z cn n z K O -c D n 1 G 0 N N K -I -D D: a O k • /�+�•�ci,ITECI a rn co o Z D n �v�* W (n -, X Z N -1 D m r = (c 0 v 6) z m • t Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information e Existing Proposed Required by Zoning This column to be filled in by e i' Building Department v Lot Size , Frontage Setbacks Front Side L:: ' R: _ L° R:- Rear ______ ,____... Building Height / Bldg.Square Footage ` , __ % _._. Open Space Footage _ % (Lot area minus bldg&paved pig) #of Parking Spaces __.____ 1 ' I I Fill: (volume&Location) l' I' A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DONT KNOW YES Q IF YES, date issued:. IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW Q YES 0 IF YES: enter Book Page - and/or Document#: B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW 0 YES c IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained , Date Issued: ~ —SI— C. Do any signs exist on the property? YES 0 NO j' 1' IF YES, describe size, type and location: ' !7✓ D. Are there any proposed changes to or additions of signs intended for the property? YES NO l' " ~ ii=YES, describe size, type and iocation: � E. WViii me construction activity oisturo(clearing.grading,excavation, or tang)over i acre or is it can or a common plan nm'v.; nisrurn over 1 acre r YCS i 1 NO e_� -- _' ,..,. ,-1�, r,,, - ;-.Ptor A11 ,-,anamanr Pormt,troth MP i p\ilf,C rant?Iron rg REEIVE":D ., ,„,_,4?421'. ,,,'. ii,,;;-t2.;... ...,.-..i_4,!.;i:gitrItit.:ti:s}, City of Northampton '5Taluflri..;i7, 1%,..:1-00,-qq.;*,..,416,,,..,,,z.'*„„_,:-.1i54*--. 4it ..4'i,: e- .. ."''-fift---z.--toun,,,-•• way,p•efrriihi,1/4,..,,,,,,..",:,-. .1::,-."31/...1:4,74.-7,,,,,,,..:':i ,.....;::..- -7 I Building Department -1/4,• ---13-- .'.•:!.;',.„-:.A.....i.'.-.1...,s,',...,V.1.!----,-,le.,:=:k-,,,n*4-o.ft7,.':.,s,C4P,j'j:4-1'--,:;,''....':'::'-t':'1 '"4.1.,"Ti-OVt,li'2R-14:'ki°15'iffi,'.tT,,a:"Ail*.f.i41Z4.-5. 4°-L'Z',i ,:',.- 'i,..A,t;.,.,:,-..•-,l-..„:., j11 5 2013 1 212 Main Street Room 100 'WaterAkeitt NIAJIPIttY:::=:::''''''-":".--- DEPT.OF BUILDING INSPECTIONS Northampton, MA 01060 , ',Rvr,'"'%”--' ,.,..„''':-;3„'',-,.,'17s•v4':'n':'i$iiillP. i..ait;,•:l5AxiTi,Lv.,z,.tr.iut:e-k-:ik ,,,.--.--....-----,,,•,. -,7w-,,,.• ---. ,-----,A.---w----„&.--,,,t,..-.4.....,wil,rA.-.-----ITIOAr,1, .... NORTHAMPTON,MA 0106 Pi a 'Site,:7 I an.61,,,--i'44'.'-°t°,..-r--r---''.-'.2-•-':.1.-,..7:1,-,,,-;.:=:.:..-.:4,..,,,, .t.: ::,:t,,;,,!:.:,:ij:.-,,,,,..): , 13-587-1240 Fax 413-587-1272 8itilii,•-g,00'5•2df,y---.•:_,:_---„,=-_,71•,12-.,:ii,',„7::=..,-,:,;:_,I7.. ..;,,,',•.!:-..,1:::',1,--.-",,-,!,--•:::•,- -;:.-:::,,,,;,....,.,...,:,.......-,, _ APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOUSH A ONE OR TWO FAMILY DWELLING SECTION 1.-SITE INFORMATION .__ 1.1 Property Address: f-- '.f-.„. "'--.'-T.'.,-;-":-f--;-;:<;.k-- --,:''j',=:-=.'r'-÷o'i''_i'-_tG:- .*,:-'_:-f;'-'_'''-W_4':'„ -=:Zllz'f:-;'"'qr-;ll,---:i-','''-4'.-': /7 i,4o,,,_ ./ 2AA6 -'-z--1.‘2 ‘''' -.E-_•,- i ,:.,,,,.i.:--.,••::7-, •-,---::,,,:,--•.,:•,-•--:T--':-.._-•L.-:•__.-!-,•,._'L.-,,..._:;,;:::...,-::,:.;;:,,:-..„-.,t':„;.:•,,,z:T):y_..‹,,tx,w-,,,,!=,;-,,si,..,-:_::,---:,-:---z;:.:•rr- ••,.,,,r2,t,,-;-,,,.,:-.:,:•,,•:;,,,-„T:fit-7:-R.,,i-,q,,f,--;,-7,•=4:1-i7-=:,--,-:=- :-:.--ir,:•:--.;=_,•,-; :;:-4,N',:.i.-..,-,:„:„.„,:-,:-.,.__,,,,,._.:_::,_:•:,:-.. 2.071/(-`' . MI • ----- -- ,,-4,,,,,,,k,,,,OyerlayDistrict-,,--..------_-_------------_---,--___--.- Ein-ist.- pi0.c-t i--'- ,- _, - -: - -C13 District- , SECTION 2.;PROPERTY OWNERSHIPIAPT-H 0 RIZED:A9NTF,_ 2.1 Own-r of Record: . 4° U.0 4 . I Ar h,"0 - II.I 41.1.--• ...• • -I- ....-- e..• '- . ...a1111111,Will611111141t OW !.:*gXMliIll‘ilIllUIIPrAir Current Mailing Adpre3ss:s___20_7iit. Telephone 2.2 Autho, ed Anent: 41110 yt/ajc-, , N. e(Print) / Current Mailing Address: 2:SPC7 ... ,./.„.... -_.....,.." Signature .,-,..„% Telephone ----.SEtTitiiii-a-----ZEthiliketb-toliStkiJCTION:-COSTS-s:::-:--Ti -- :--7 ,":-:•---'L.::'-,.:..,-71.-,-,'..:,.-Official Use Only „-:.-.:.:-.-ir.::__„:-.-_-__:-._-_-;.,..,-_,-e.r.1..1-.. , Item Estimated Cost(Dollars)to be T:::7,-"'-:' ].--:'- - - --:::. .,- :.'.- .-_;::; ::,:__:=-: :1: :2:=.-:: ::,-:_,_, completed by permit applicant ...r.-__=... -- -_:„.. •,,,,_,._,„_,,,,„..._,,,......._..,„: ....,, ,-.:.7.4-_-_±_zi...-,...:.-j';'•.:,:...--.'.;;T...:.„--..-:..".:,_,--,...-_-.=:,.-,: ,.._. 1. Building !..7-16Y::niiiiiiirt;POilitif,!.-,T,5=,-1:::7-:-;:::::',:::,:,;. - / 2 Electrical --- 1-- isA:1,16taiCOst-Cfi::'..;''---_---,i' . 2-1 ..1:"..1". -14tinr.11tr.r.i 3 Plumbing ri, ,/.4 Building:FOrmit Fee . 4. Mechanical(HVAC) ' '. ----- . , . .: ,.:-71. -.--::-:f2--: 5. Fire Protection , _ _,,,..__.— • _i .. •_ _,,,, . ,. ., r_._ , _ _ 6 Total (1 +2+3+4+5) -..;Check.+Iumber.--- --.:-- . This"SeCtiOn*Ortlikaat,UOO-OnlY.,----.- ---- - Building Permit Number: _ , __ ___ , Signature, - . ,._.7=-....-.---r:L.:::-:.--- ::,f-.1:----=,.- =-:--;:----,-------Date-z-=7_:_-7-..-'::-:--- -- ---'------' ' -- - :::---7-7:17-------:------:- -.:---.-1---''.;-':-::-=-4-'--:"-'=-1---- ---'.---/I 1-i-f Biiiidiiiiii:f"---,:l'-.-,:-:- -'-i':" .- ;;:---:::-.-it---:,-,------ -'-- = ------ - •- [ ''''''''-- 1-----_- _lif. . Budding Commissioner,hspa,5,...-_,. _._. . - _ _ . _ __ _ -. 6 -9 . _--- ft- i.--___c -- /-,-t-2. .A7 . e-,--7 v0-5.0- 0./6,x---- ,i--,-- - ,,,, . ss',..9 File#BP-2013-1158 APPLICANT/CONTACT PERSON NORMAN GLENN ADDRESS/PHONE 18 Ashley Circle EASTHAMPTON (413)527-4010 PROPERTY LOCATION 11 MARC CIR MAP 12C PARCEL 080 001 ZONE RI(100)/URA(100)/WSP(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out {J�/ jac(<0 Fee Paid j} l Typeof Construction: CONSTRUCT 19 X 25 ATT GARAGE W/STUDIO New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 039970 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO TION P SENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission _ Permit DPW Storm Water Management doe •• ition Delay . ". Z.-- /5 Sigma::uil. n_Offit'.1 Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. 11 MARC CIR BP-2013-1158 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 12C-080 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: GARAGE BUILDING PERMIT Permit# BP-2013-1158 Project# JS-2013-001901 Est. Cost: $78500.00 Fee: $246.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: NORMAN GLENN 039970 Lot Size(sq. ft.): 11499.84 Owner: HARDY JAMES A&JUNE E Zoning: RI(100)/URA(100)/WSP(100)/ Applicant: NORMAN GLENN AT: 11 MARC CIR Applicant Address: Phone: Insurance: 18 Ashley Circle (413) 527-4010 EASTHAMPTONMA01027 ISSUED ON:6/7/2013 0:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT 19 X 25 ATT GARAGE W/STUDIO - need letter prior to final POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 6/7/2013 0:00:00 $246.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner