Loading...
17A-022 (3) / 719- 0.it #; 30 West Pomeroy Lane RECEIVED Amherst, MA 01002 JUN f 2013 Phone: 413-835-5162 POWERHOUSE Email: matt.turcotte @gmail.com DEPT.OF BUILDING INSPECTIONS NORTHAMPTON,MA 01060 Site Information Date Of Test: 5/23/2013 Client Aaron Morin Sheet Metal —> Site Address: 15 Hastings Heights Northampton, MA 01062 Test Performed By: Brandon Shantie Job#: DT-038 Duct Pressurization Test Results Type of Test Performed: Post-Construction, total leakage (12%) Duct System 1 Conditioned Floor Area: 1254 sq ft Duct Flow at 25 Pa: 27 CFM Duct Leakage: 2.15 CFM per 100 sq ft of conditioned floor area TEST RESULT : PASS Duct System 2 (if applicable) Conditioned Floor Area: N/A sq ft Duct Flow at 25 Pa: N/A CFM Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area TEST RESULT: N/A Notes on Area Tested and/or Testing Conditions: Duct system only serviced the first floor. 2009 IECC Minimum Requirements, per Section 403.2.2 Mid-Construction Test, total leakage without air handler<4 CFM per 100 sq ft of conditioned floor area Mid-Construction Test, total leakage with air handler< 6 CFM per 100 sq ft of conditioned floor area Post-Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area Post-Construction Test, total leakage< 12 CFM per 100 sq ft of conditioned floor area