17A-022 (3) / 719-
0.it
#; 30 West Pomeroy Lane RECEIVED
Amherst, MA 01002
JUN f 2013
Phone: 413-835-5162
POWERHOUSE Email: matt.turcotte @gmail.com DEPT.OF BUILDING INSPECTIONS
NORTHAMPTON,MA 01060
Site Information
Date Of Test: 5/23/2013
Client Aaron Morin Sheet Metal
—> Site Address: 15 Hastings Heights
Northampton, MA 01062
Test Performed By: Brandon Shantie
Job#: DT-038
Duct Pressurization Test Results
Type of Test Performed: Post-Construction, total leakage (12%)
Duct System 1
Conditioned Floor Area: 1254 sq ft
Duct Flow at 25 Pa: 27 CFM
Duct Leakage: 2.15 CFM per 100 sq ft of conditioned floor area
TEST RESULT : PASS
Duct System 2 (if applicable)
Conditioned Floor Area: N/A sq ft
Duct Flow at 25 Pa: N/A CFM
Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area
TEST RESULT: N/A
Notes on Area Tested and/or Testing Conditions:
Duct system only serviced the first floor.
2009 IECC Minimum Requirements, per Section 403.2.2
Mid-Construction Test, total leakage without air handler<4 CFM per 100 sq ft of conditioned floor area
Mid-Construction Test, total leakage with air handler< 6 CFM per 100 sq ft of conditioned floor area
Post-Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area
Post-Construction Test, total leakage< 12 CFM per 100 sq ft of conditioned floor area