38A-103 (2) 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit a statement to the DPW from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of the certification statement described above. 4. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: 1. The contractor, Gagliarducci Construction, Inc., shall provide adequate protection of all existing and proposed catch basins, inlets and storm drain outlets so that no sediment is discharged to the Mill River. ui L1ID � L ature of Engineer I Date cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M:\Stormwater Permits \Permits_new applications \Earle St Reconstruction.doc Page 2 of 2 L_30f - 3 2oP pM'TO _.. ^ �L � ` STORMWATER MANAGEMENT PERMIT til r� 1 JON 1 2UO PPLICATION DECISION City of Northampton Department of Public Works Project / Site Name: Earle Street Reconstruction Project Street or Location / Assesso " k {pia Street — Route 10 to Route 66 Applicant Name: Gagliarducci Construction Inc. Applicant Address /Phone:295 Pasco Road, Springfield, MA 01151 / 413 - 543 -6978 Owner Name: City of Northampton Application Submission Date: 5/13/2008 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. Earle Street Reconstruction Plans, Sheets 1 -49, stamped 10/18/2007 by Fred L. Douglas, P.E., VAi Transportaion Engineers & Planners. b. Stormwater Pollution Prevention Plan for The Reconstruction of Earle Street, Northampton, MA, prepared by Pioneer Environmental, Inc., approved by Massachusetts Highway Department 6/10/2008. M:\Stormwater Permits \Permits_new applications \Earle St Reconstruction.doc Page 1 of 2 3?/1-103 SIEGFRIED PORTH A R C H I T E C T A.I.A. 116 PLEASANT ST. SUITE 331 EASTHAMPTON , MA 01027 PHONE: 413 - 529 -9434 FIELD REPORT 3UN 1 1 2.008 TO CITY OF NORTHAMPTON, MA ATTENTION: BUILDING INSPECTOR SUBJECT: PERIODIC INSPECTION REPORT FOR: VCA INC. WOODWORKING 209 EARLE STREET PERMIT #: IN ACCORDANCE WITH MASSACHUSETTS STATE BUILDING CODE 780CMR SECTION 116.2.2 FOR THE PERIOD _05/07/08 TO 06/06/2008 1. INTERIOR STEEL STUD FRAMING IN PROGRESS 2. LINER PANEL COMPLETE 3. ROUGH ELECTRIC, PLUMBING, HVAC AND SPRINKLER IN PROCESS I FIND THE WORK METHODS AND MATERIALS ON THIS PROJECT ARE OF SUPERIOR QUALITY AND ARE BEING APPLIED AND PERFORMED AS SPECIFIED. SINCER m LY, 4 r ei SIEGF' ED P* "TH , ER G,sr ARCHITECT o 4. %- sIEGF cc9� i r s q ° 2 y S84CH USEll Sk: n ° SIEGFRIED PORTH A R C H I T E C T r - r r A.I.A. 116 PLEASANT ST. , r , p0 SUITE 331 c )i3 _ 4 EASTHAMPTON , MA 01027 PHONE: 413- 529 -9434 FIELD REPORT TO: CITY OF NORTHAMPTON, MA ATTENTION: BUILDING INSPECTOR SUBJECT: PERIODIC INSPECTION REPORT FOR: VCA INC. WOODWORKING 209 EARLE STREET PERMIT #: IN ACCORDANCE WITH MASSACHUSETTS STATE BUILDING CODE 780CMR SECTION 116.2.2 FOR THE PERIOD 06/06/08 TO 07/09/2008 1. INTERIOR STEEL STUD FRAMING COMPLETE 2. GYP. BD. COMPLETE IN OFFICE AREA 3. GYP. BD. READY TO CONCEAL AFTER ELECTRICAL INSPECTION TODAY. 4. ALL MEZZANINE AREAS FRAMED 5. ALL EXTERIOR WINDOWS AND DOORS IN PLACE 6. ROUGH ELECTRIC, PLUMBING, HVAC IN PROCESS 7. SPRINKLER PIPING COMPLETE — NO RISER AND ASSOCIATED VALVES. 8. EXTERIOR SIDEWALKS AND PADS IN PLACE I FIND THE WORK METHODS AND MATERIALS ON THIS PROJECT ARE OF SUPERIOR QUALITY AND ARE BEING APPLIED AND PERFORMED AS SPECIFIED. SINCERELY, 4e 4 SIEGFRIED ' t� � TH �ti ,,, ARCHITEC ' w 66 wx N` s �� y "YEA LTH