38A-103 (2) 2. The Northampton Department of Public Works (DPW) or its authorized representative
shall be provided access to the property to conduct inspections before, during, and after
construction activities as necessary. The applicant shall arrange with the DPW to
schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury
Inspection, and Final Inspection. The DPW may also conduct random inspections to
ensure effective control of erosion and sedimentation during all phases of construction.
3. At the completion of the work, including construction of stormwater management
facilities and landscaping, the applicant shall submit a statement to the DPW from a
professional engineer of record in the Commonwealth of Massachusetts certifying that
the materials and construction of the stormwater management system was constructed in
accordance with the approved plans and will function as designed. All changes to the
approved stormwater facilities shall be documented by a professional engineer of record
in the Commonwealth of Massachusetts and approved by the DPW prior to submission of
the certification statement described above.
4. If construction of the proposed stormwater system has not started within five years of the
issue date of this permit, then the permit will expire and a new permit will be required.
Construction is defined as clearing, grading, excavation, filling, and installation of
drainage structures on the lots specified in this permit.
Specific Permit Conditions:
1. The contractor, Gagliarducci Construction, Inc., shall provide adequate protection of all
existing and proposed catch basins, inlets and storm drain outlets so that no sediment is
discharged to the Mill River.
ui L1ID �
L
ature of Engineer I Date
cc. Planning Board c/o Office of Planning and Development
Building Department
Conservation Commission c/o Office of Planning and Development
M:\Stormwater Permits \Permits_new applications \Earle St Reconstruction.doc
Page 2 of 2
L_30f - 3
2oP pM'TO _.. ^ �L �
` STORMWATER MANAGEMENT PERMIT
til r� 1
JON 1 2UO PPLICATION DECISION
City of Northampton
Department of Public Works
Project / Site Name: Earle Street Reconstruction
Project Street or Location / Assesso " k {pia Street — Route 10 to Route 66
Applicant Name: Gagliarducci Construction Inc.
Applicant Address /Phone:295 Pasco Road, Springfield, MA 01151 / 413 - 543 -6978
Owner Name: City of Northampton
Application Submission Date: 5/13/2008
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION
PRESENTED:
Disapproval of the Stormwater Management Permit Application based on a
determination within seven days of the receipt of the application that the
application is administratively incomplete (see attached documentation).
Approval of the Stormwater Management Permit Application.
X Approval of the Stormwater Management Permit Application subject to any
conditions, modifications or restrictions required by the Department of
Public Works (see below)
Disapproval of the Stormwater Management Permit Application based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development shall be conducted in
strict accordance with the following plans and information submitted with the application
and as amended by any conditions attached to this permit:
a. Earle Street Reconstruction Plans, Sheets 1 -49, stamped 10/18/2007 by Fred L.
Douglas, P.E., VAi Transportaion Engineers & Planners.
b. Stormwater Pollution Prevention Plan for The Reconstruction of Earle Street,
Northampton, MA, prepared by Pioneer Environmental, Inc., approved by
Massachusetts Highway Department 6/10/2008.
M:\Stormwater Permits \Permits_new applications \Earle St Reconstruction.doc
Page 1 of 2
3?/1-103
SIEGFRIED PORTH
A R C H I T E C T
A.I.A.
116 PLEASANT ST.
SUITE 331
EASTHAMPTON , MA 01027
PHONE: 413 - 529 -9434
FIELD REPORT 3UN 1 1 2.008
TO CITY OF NORTHAMPTON, MA
ATTENTION: BUILDING INSPECTOR
SUBJECT: PERIODIC INSPECTION REPORT FOR: VCA INC. WOODWORKING
209 EARLE STREET
PERMIT #:
IN ACCORDANCE WITH MASSACHUSETTS STATE BUILDING CODE 780CMR
SECTION 116.2.2 FOR THE PERIOD _05/07/08 TO 06/06/2008
1. INTERIOR STEEL STUD FRAMING IN PROGRESS
2. LINER PANEL COMPLETE
3. ROUGH ELECTRIC, PLUMBING, HVAC AND SPRINKLER IN PROCESS
I FIND THE WORK METHODS AND MATERIALS ON THIS PROJECT ARE OF SUPERIOR
QUALITY AND ARE BEING APPLIED AND PERFORMED AS SPECIFIED.
SINCER m LY,
4 r ei
SIEGF' ED P* "TH , ER G,sr
ARCHITECT o 4. %- sIEGF cc9�
i
r
s
q ° 2 y
S84CH USEll
Sk: n °
SIEGFRIED PORTH
A R C H I T E C T
r - r r A.I.A.
116 PLEASANT ST.
, r , p0 SUITE 331
c )i3 _ 4 EASTHAMPTON , MA 01027
PHONE: 413- 529 -9434
FIELD REPORT
TO: CITY OF NORTHAMPTON, MA
ATTENTION: BUILDING INSPECTOR
SUBJECT: PERIODIC INSPECTION REPORT FOR: VCA INC. WOODWORKING
209 EARLE STREET
PERMIT #:
IN ACCORDANCE WITH MASSACHUSETTS STATE BUILDING CODE 780CMR
SECTION 116.2.2 FOR THE PERIOD 06/06/08 TO 07/09/2008
1. INTERIOR STEEL STUD FRAMING COMPLETE
2. GYP. BD. COMPLETE IN OFFICE AREA
3. GYP. BD. READY TO CONCEAL AFTER ELECTRICAL INSPECTION TODAY.
4. ALL MEZZANINE AREAS FRAMED
5. ALL EXTERIOR WINDOWS AND DOORS IN PLACE
6. ROUGH ELECTRIC, PLUMBING, HVAC IN PROCESS
7. SPRINKLER PIPING COMPLETE — NO RISER AND ASSOCIATED VALVES.
8. EXTERIOR SIDEWALKS AND PADS IN PLACE
I FIND THE WORK METHODS AND MATERIALS ON THIS PROJECT ARE OF SUPERIOR
QUALITY AND ARE BEING APPLIED AND PERFORMED AS SPECIFIED.