Site Information
Date Of Test: 12/21/2012
Client: Walunas Plumbing & Heating Inc
Site Address: 17 Norwood Ave
Northampton, MA 01062
Test Performed By: Matt Turcotte •
Job #: 12 -028 -d
Duct Pressurization Test Results
Type of Test Performed: Post - Construction, leakage to outside (8 %) CV
Duct System 1
Conditioned Floor Area: 1391 sq ft
Duct Flow at 25 Pa: 47 CFM
Duct Leakage: 3.38 CFM per 100 sq ft of conditioned floor area
TEST RESULT : PASS
Duct System 2 (if applicable)
Conditioned Floor Area: N/A sq ft
Duct Flow at 25 Pa: N/A CFM
Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area
TEST RESULT: N/A
Notes on Area Tested and /or Testing Conditions:
2009 IECC Minimum Requirements, per Section 403.2.2
Mid - Construction Test, total leakage without air handler < 4 CFM per 100 sq ft of conditioned floor area
Mid - Construction Test, total leakage with air handler < 6 CFM per 100 sq ft of conditioned floor area
Post - Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area
Post - Construction Test, total leakage < 12 CFM per 100 sq ft of conditioned floor area