Loading...
30B-020 (5) 30 6._ RECEIVED 30 West Pomeroy Lane Amherst, MA 01002 4 2013 JAN Phone: 413- 835 -5162 °t POWERHOUSE Email: matt.turcotte @gmail.com - - Site Information Date Of Test: 12/21/2012 Client: Walunas Plumbing & Heating Inc Site Address: 17 Norwood Ave Northampton, MA 01062 Test Performed By: Matt Turcotte • Job #: 12 -028 -d Duct Pressurization Test Results Type of Test Performed: Post - Construction, leakage to outside (8 %) CV Duct System 1 Conditioned Floor Area: 1391 sq ft Duct Flow at 25 Pa: 47 CFM Duct Leakage: 3.38 CFM per 100 sq ft of conditioned floor area TEST RESULT : PASS Duct System 2 (if applicable) Conditioned Floor Area: N/A sq ft Duct Flow at 25 Pa: N/A CFM Duct Leakage: N/A CFM per 100 sq ft of conditioned floor area TEST RESULT: N/A Notes on Area Tested and /or Testing Conditions: 2009 IECC Minimum Requirements, per Section 403.2.2 Mid - Construction Test, total leakage without air handler < 4 CFM per 100 sq ft of conditioned floor area Mid - Construction Test, total leakage with air handler < 6 CFM per 100 sq ft of conditioned floor area Post - Construction Test, leakage to the outdoors < 8 CFM per 100 sq ft of conditioned floor area Post - Construction Test, total leakage < 12 CFM per 100 sq ft of conditioned floor area