Loading...
10B-004 (2) JD Remodeling Estimate PO Box 413 92 South Chesterfield Road Date Estimate # Goshen, MA 01032 9/20/2012 12 -13 E -mail jdremodel@verizon.net Phone # 413 - 297 -3334 Client Information: Lashway Logging Lee Lashway 67 Main Street Williamsburg, MA 01096 -9428 Project Bathroom remodel Item Description Qty Rate Total Portable Toilet Approximate 1- month, outside toilet for workers 1 150.00 150.00T Please call to schedule job. Thank you for the opportunity to provide this estimate. Subtotal $22,750.00 Signature Sales Tax (6.25 %) $328.13 Total $23,078.13 JD Remodeling Estimate PO Box 413 92 South Chesterfield Road Date Estimate # Goshen, MA 01032 9/20/2012 12 - 13 E -mail jdremodel @verizon.net Phone # 413 - 297 -3334 Client Information: Lashway Logging Lee Lashway 67 Main Street Williamsburg, MA 01096 -9428 Project Bathroom remodel Item Description Qty Rate Total Electrician install toe kick heater, bath fan, light switch, code upgrade, permit, 1 2,600.00 2,600.00 $200.00 budget for light above vanity Plumbing Reinstall plumbing for sink and shower, 2 trips for toilet, disconnect old 1 5,300.00 5,300.00 lines as needed, reconnect vents, permit, install temporary toilet then remove at end of job.($800.00) bath vanity Vanity with three drawers on left, eggshell. 1 600.00 600.00T Carpentry Labor (1 carpenter and two assistants) to gut bathroom, replace rotted 1 8,600.00 8,600.00 joists, install new subfloor, install new moisture resistant drywall, Prep areas for tile crew, paint, install new trim boards to doors and window, coordinate with sub contractors and other tasks as necessary. Does not include tile work. Does not include backerboard for tile. Materials Materials needed but not limited to complete bath remodel- 2x framing 1 4,500.00 4,500.00T (e.g., joists), 3/4 inch plywood for subfloor, drywall, paint (color to be picked out by homeowners), grab bars, trim boards for doors and windows, vent for shower, shingles, blocking, flashing, includes tool rental to break up tile. (Budgeted amount only, subject to change without notice) Disposal Disposal of debris and other waste items 1 650.00 650.00 Building permit Building permit to the City of Northampton (estimate only) 1 350.00 350.00 Please call to schedule job. Thank you for the opportunity to provide this estimate. Subtotal Signature Sales Tax (6.25 %) Total JD Remodeling Fine Home Restoration All warranties on the owner's rights under the provisions of 780 CMR R6 and MGL c 142A Permit Notice: a. The contractor will secure any and all necessary construction- related permits. The homeowner can assist, as necessary, with obtaining permits; b. It shall be the obligation of the contractor to obtain such permits as the owner's agent; and, Arbitration: If the contractor determines that in the event of a dispute, the contractor wishes the dispute to be settled by state - approved arbitration, this fact must be signified on the contract and both the contractor and owner shall sign this clause separately. "The contractor and the homeowner hereby mutually agree in advance that in the event that the contractor has a dispute concerning this contract, the contractor may submit such dispute to a private arbitration service which has been approved by the Office of Consumer Affairs and Business Regulation and the consumer shall be required to submit to such arbitration as provided in MGL c 142A. Homeowner Signature: ��� Date /`-S/ , Contractor Signature: -- Date 1 IS -1 3 NOTICE: The signatures o the parties above l only to the agreement o ute the parties to alternative di g f p spy y g f p � resolution initiated by the contractor. The owner may initiate alternative dispute resolution even where this section is not signed separately by the parties." Page 5 of 5 JD Remodeling Fine Home Restoration In order to meet the completion schedule, the following material /equipment must be special ordered before the contracted work begins: 1. At this time all special order items (for example, the bath vanity) has been ordered see above. DO NOT SIGN THIS CONTRACT IF YOU DO NOT UNDERSTAND THE TERMS, SCOPE OF WORK OR ANYTHING ELSE WRITTEN IN THIS CONTRACT Homeowner's Signature f / . 2 - € 4 / /3 Date Contra or's Signature Date You may cancel this agreement if it has been signed by a party thereto at a place other than an address of the seller, which may be his main office or branch thereof, provided you notify the seller in writing at his main office or branch by ordinary mail posted, by telegram sent or by delivery, not later than midnight of the third business day following the signing of the agreement. No work shall begin until both parties sign the contract and the owner has a copy of the contract. Before agreeing to any home improvement work on your residence you should obtain a free copy "A Consumer Guide to Home Improvement Contractor Law" by calling the Office of Consumer Affairs and Business Regulation's Information Hotline at 617- 973 -8787. The homeowner has three -day cancellation rights under MGL c 93 s 48; MGL c 140D s 10 or MGL c 255D s 14 as may be applicable. Page 4 of 5 JD Remodeling Fine Home Restoration SERVICES PROVIDED BY HOMEOWNER The Homeowner /Building owner is to provide electricity and water at no additional expense to the Contractor. The homeowner will also provide or pay for a portable toilet. (see attached estimate) Objects hanging on walls: • Fragile items on or near tables, walls, ceilings, etc. should be removed prior to construction. Contractor is not responsible for items that fall off the walls, ceiling, etc. during construction. The following schedule will be adhered to unless circumstances beyond the contractor's control arise: Work Scheduled To Begin: January 21, 2013 Expected Date of Completion: February 15, 2013 (Adverse weather will extend this date.) Please note construction projects of this scope can be delayed due to supplies, weather and unexpected and unforeseen problems. However, the Contractor intends to work in a continuous manner until project completion (i.e., minimum of 4 ten -hour days per standard work week). Some work may be completed on Saturdays or Sundays due to weather. TIME AND MATERIALS CONTRACT: The Contractor agrees to perform the work, equipment specified above for the SUM of: $ $23.078.13 (Price does not include change orders, materials or unforeseen problems) PAYMENT SCHEDULE Homeowner agrees to make payments and shall be made according to the following SCHEDULE: • 10% ($2307.81)due at signing of contract; • 30% ($6,923.44) due at start of work (expected start date January 21, 2013) • 30% ($6,923.44)due when bathroom has been gutted, new floor joists installed where applicable, and new sub -floor installed; • 20% ($4,615.63) due when rough plumbing and rough electrical work completed • 10% ($2,307.81) or final amount due at completion of project. NOTE: Failure to make payments ceases all work. Detailed invoices shall be provided to the homeowner. Page 3 of 5 JD Remodeling Fine Home Restoration SCOPE OF WORK 1. Remove all plaster in shower and bathroom (as needed) and prep for tile work. Cortina Tile, contracted by homeowner to install backer board; 2. Coordinate with Plumber and install Temporary toilet; 3. Coordinate with Electrician 4. Install shelf in shower unit, Cortina Tile to cover with bath tile and bull nose; 5. Replace drywall in areas as needed; 6. Replace door and window trim, as needed. 7. Other tasks as necessary to complete project. Note: see attached cost estimate for details MATERIALS FOR THE PROJECT 1. See attached estimate. 2. Bath Vanity has been ordered, anticipated delivery February 8, 2013. UNEXPECTED and UNFORESEEN PROBLEMS If the Contractor observes problems such as rot, bug infestation or other unknown or unforeseen problems, the Contractor will inform Homeowner immediately. Repairs will be completed at direct cost for materials and at an hourly rate of $35.00 per hour per employee. Additional repairs will require 30% deposit upfront and balance due upon completion of additional work. Homeowner(s) or Building Owner understands that rot or other problems will cause a delay with completing the overall scope of work and is not the fault of the Contractor. CHANGE ORDERS CHANGE ORDERS OR REPAIR TO UNKNOWN PROBLEMS AT THE REQUEST OF THE HOMEOWNER WILL BE A DIRECT BILLING ON ALL MAl ERIAI S. HOMEOWNER AGREES TO PAY PRIOR TO THE PURCHASE OF THOSE MATERIALS. ERIAI S. LABOR WILL BE A DIRECT COST AT AN HOURLY RA 1 E OF .$35.00 PER HOUR Page 2 of 5 JD Remodeling PO Box 413 92 South Chesterfield Road Goshen, MA 01032 CONTRACT PROJECT: 94 Audubon Road in Leeds, MA Bathroom Remodel. Homeowner Information Name Lee Lashway Street Address 67 Main Street City /Town State Zip Code Williamsburg, MA 01096 Daytime Phone / Evening Phone 268 -3600 / 584 -4471 Contractor Information JD Remodeling (a.k.a. New Horizons) Contractor /Owner Name: Joseph Dunn Business Street Address PO Box 413, 92 South Chesterfield Road City /Town State Zip Code Goshen, MA 01032 Business Phone 413 - 297 -3334 Federal Employer ID : 20- 0003810 Contractor No. 088718 HIC # 144334 Page 1 of 5 Sub - Contractor List — Bathroom Remodel 94 Audubon Road, Leeds Frank Marchand Plumbing and Heating 212 Chestnut Plain Road South Deerfield, MA 01373 (413) 665 -7177 Curt Golec Electrician 402 spring st, 01062, Florence (413) 320 -1156 The Commonwealth of Massachusetts Department of Industrial Accidents `"® Office of Investigations J.. News=i111 wow 600 Washington Street w ;te . 'r "7 1 Boston, MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/ Contractors /Electricians /Plumbers Applicant Information \ Please Print Legibly Name (Business /Organization/Individual): .}�r)5 t. et. LU h / J `J '� �^0 dek ``.. Address: ib A 4i 9 .),J. CL.n}Pr tc1 ll `C,:..) r City /State /Zip: ( -1,-A,t AA. O(0 52- Phone #: Are 3;90 an employer? Check the appropriate bolt: Type of project (required): 1. T am a ern.. t^• ,,,it'' 11 pl.- .1, ,,,,�P 4. I am a general contractor and I 6 . L! lv r, - .. YV * have hired the sub contractors ew construction employees (full and/or part- time). 2. III I am a sole proprietor or partner- listed on the attached sheet. 7. eRemodeling ship and have no employees These sub contractors have 8. Ei Demolition and have workers' a working for me in any capacity. employees 9. n Building addition [No workers' comp. insurance comp. insurance.$ required.] 5. ❑ We are a corporation and its 10.0 Electrical repairs or additions 3. ❑ I am a homeowner doing all work officers have exercised their 11. El Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] t c. 152, § 1(4), and we have no employees. [No workers' 13.[] Other comp. insurance required.] *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. Contractors that check this box must attached an additional sheet showing the name of the sub - contractors and state whether or not those entities have employees. If the sub - contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. ( v1c K,KC 1 'P f ts`) ) Insurance Company Name:�c,nc,,,,\-r� T,rJ„ e5 Ass, WI0ht.. „s,.9i“v e cc.,0... Policy # or Self -ins. Lic. #: AtQC 70/ 2-0 Expiration Date: q- ii -26' z ®.l3 Job Site Address: cL A v\ \(2, 063 City/State /Zip: terd5 ° 0 105 Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one -year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby ce ti under the pains and penalties of perjury that the information provided above is true and correct. Signature: 6 Date: 1 - IS - - /01 'S Phone #: 9 i; ' Ai ' 353`i Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License # Issuing Authority (circle one): 1 Board of Health 2. Building Department Z City/Town Clerk 4. Electrical inspector 5. Plumbing Inspector 6. Other • Contact Person: Phone #: SECTION 8 - CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: / Not Applicable ❑ Name of License Holder : Q� C—.�y v,N ` 5 ^ o ri License Number L kk3 , 5, CL \er\ -tek3 u ,jt -a- 13 Address Expiration Date ) 16 ) otcn 335` Signature Telephone 9Itegiste dHome .,Impfovement'Coritractor _„ ,, -0 w „_31 vEzaw,- Lmivi Not Applicable ❑ Ikkvy , 2.� .1, , f % vk 11M 359 Company Name Regictrat Number i ak')oe Address Expiration Date Telephone / (13 )4?" 33 }y SECTION 90- WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M G L c. 152, § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes £1 No ❑ 1:1111e4Y wn er4zXexnn on The current exemption for "homeowners" was extended to include Owner- occupied Dwellings of one (1) or two(2) families and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts as supervisor. CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner: Person (s) who own a parcel of land on which he /she resides or intends to reside on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm structures. A person who constructs more than one home in a two -year period shall not be considered a homeowner. Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official, that he /she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature • SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable) „j , New House ❑ Addition ❑ Replacement Windows Alteration(s) N Roofing Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [D] Decks [0 Siding [D] Other [D] Brief Description of Proposed tplcc,(F 2 O' 3 Work: �r7V c-kdor ko r'eo” r; ewia t ( AN i• 4 t r j . -r Alteration of existing bedroom Yes )L No Adding new bedroom Yes 7 ` No Attached Narrative Renovating unfinished basement Yes A- No Plans Attached Roll - Sheet 6a I New househand %orradditron.towexisti hotisinq;`completethe following; a. Use of building : One Family 7`- Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each ' g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No . I. Septic Tank City Sewer Private well City water Supply Tai OWN AUTHORIZATION -:TO BE C OMP LE TED W <: : * SECTION ; ' OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, , as Owner of the subject property hereby authorize to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date I t \ iS' L (,,; - `J��� as Owner /Authorized Agent hereby d eclare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and nalties of perjury. k e v C. , „,..N Print Name Signature of Ow .er. Age t Date , Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information e Existing Proposed Required by 'ZMing This column to be filled in by N 0 f LcAl b` Building Department Lot Size I , _ . — ; 1 Frontage a 1 1 ?2 i . ._ — _ . Setbacks Front I E Y Side L: R:- L: . ' R: i ! Rear i ' Building Height t : I Bldg. Square Footage Open Space Footage _ % r (Lot area minus bldg & paved _ i parking) # of Parking Spaces i I Fill: k 3 , i ! (volume & Location) A. Has a Special Permit/Variance/Finding ever been issued for /on the site? NO 0 DONT KNOW ® YES 0 IF YES, date issued:, I IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES 0 IF YES: enter Book t age; P I and /or Document # 1 , B. Does the site contain a brook, body of water or wetlands? NO DON'T KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained , Date Issued: C. Do any signs exist on the property? YES 0 NO IF YES, describe size, type and location: I D. Are there any proposed changes to or additions of signs intended for the property ? YES 0 NO IF YES, describe size, type and location: I E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. f � `�y t" k� �, ' De artme,>?It U Ij� Quay � ,> a` City of Northampto Status�o errta , � ri.. Building Department C Cu ®I P r mtt ' mob :� p b �k 212 Ma Street 272 • SewerySepticala � Room 100 �� ti � atei� tl o �$ .' ' � . ate" ^ ,K Northampton, MA 01060 Two :e s •Etru ,' phone 413-587- 1240 Fax 413- 587 1 o S te e ns Other S I APPLICATION TO CONST ALTER, REPAIR, RENOVATE OR DEMOLISH OI E OR TWO FAMILY D EL ING nEPT. OF BUOF _CIP;G INSPEC NORTHAMPTON, MA 01060 SE CTION 1 S ITE INFOR T sec to be co mple t e d by office 1 .1 P roperty Address. L k V 4. ar l P , 1 4C .^ 2 'v L r- I J cJV �L` r✓'� 0.0 --t) s''' . ,c i. z *.r rt Lot s . u+ Un r `� } x i�ht +, 'a s,v a.', a .. , s Le�~�5, oi05 - ' �Lb one' Overla Dls tn c t Y : a .' ° "' ' _ CB Di m SECTIO 2 - PROP OWN / AGENT 2 .1 Owner of Record: • Name ( Print) Current Mailing Addr s : . Lif (see ,�„ �v��+f�l, Telephone 4, ok-ili . Signature 2.2 Authorized Agent: Name (Print) Current Ma Address '- I 1 3 -,2ci� - 3 3 3 y Signature( Telephone SECTION 3 _ESTIMATD CONS TRUCTI O N CO Item Estimated Cost (Do llars) to be Offic Use ni z comp leted b permi applicant 1. Building 2 coo (a) Building Permit Fee ., ) I 2. Electrical ( b ) ; Es t im ated Tota I'Cos of;= .,:fi :C onstructio n f ro (6) m. : .., .- 3. Plumbing 4. Mechanical (HVAC) B u il ding Permit Fee 5. Fire Protection 6. Tota = (1 + 2 + 3 + 4 + 5) !C Nu mber M °This S ection For Official Use Oniy Date Building Permit Number Issue Signature: �,. B Com o nerLln s p ec t or o f Building Date • 94 AUDUBON RD BP- 2013 -0703 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 10B - 004 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit # BP- 2013 -0703 Project # JS- 2013 - 001164 Est. Cost: $23000.00 Fee: $138.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: JOSEPH DUNN 088718 Lot Size(sq. ft.): 24480.72 Owner: LASHWAY WILLIAM J & LEE H Zoning: RR(100)/ Applicant: JOSEPH DUNN AT: 94 AUDUBON RD Applicant Address: Phone: Insurance: PO BOX 413 (413) 297 -3334 0 WC GOSHENMA01032 ISSUED ON:1/17/2013 0:00:00 TO PERFORM THE FOLLOWING WORK: REMODEL 1ST FLR BATHROOM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 1/17/2013 0:00:00 $138.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Commissioner 94 AUDUBON RD BP- 2013 -0703 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 10B - 004 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit # BP- 2013 -0703 Project # JS- 2013- 001164 Est. Cost: $23000.00 Fee: $138.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: JOSEPH DUNN 088718 Lot Size(sq. ft.): 24480.72 Owner: LASHWAY WILLIAM J & LEE H Zoning: RR(100)/ Applicant: JOSEPH DUNN AT: 94 AUDUBON RD Applicant Address: Phone: Insurance: PO BOX 413 (413) 297 -3334 0 WC GOSHENMAO1032 ISSUED ON:1/17/2013 0:00:00 TO PERFORM THE FOLLOWING WORK: REMODEL 1ST FLR BATHROOM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 1/17/2013 0:00:00 $138.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Commissioner