Loading...
380 Elm Letter of Substantial Completion - 2012-10-30 • www.kuhnriddle.com • October 30, 2012 Louis Hasbrouck, Building Commissioner City of Northampton Puchalski Municipal Building 212 Main Street Northampton, MA 01060 RE: Northampton High School Black Box Theater Northampton, MA PROJ. NO.: 12040 Dear Mr. Hasbrouck, Pursuant to Section 116.2 of the Massachusetts State Building Code, I certify that Kuhn Riddle Architects, Inc., has performed the required professional services for the referenced project, as follows: 1. Reviewing for conformance to the design concept, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Reviewing and approving the quality control procedures for code-required controlled materials. 3. Being present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. The completed work, to the best of my knowledge and belief, complies with the Massachusetts State Building Code and with the documents approved for the building permit. Sincerely, Aelan B. Tierney, AIA, LEED AP, BD+C Mass. Registration No. 20441 cc: Stephen Eldredge, Head of the Theater Department, Northampton High School Steve Zucchino, General Contractor