Loading...
35-258 Proposal ' " Customer /Owner: Dr. Timothy Parsons Ca - ) / `� Robert 1113 Address: 91 Turkey Hill Rd. gm •■ Dann, City, State, Zip: Northampton, MA 01060 Phone: Construction Services, inc. Proposal Date: June 7, 2010 43 Burt Rd. Westhampton, MA 01027 (413) 250 -7430 Project name: Doors We propose to furnish all material and perform all labor necessary to complete the following: Remove current front door. Install new JELD -WEN Mahogany Two (2) panel, 1 /2 light, Architectural door with Low E glass. Install standard lockset with matching keyed alike deadbolt. Frame and install basement door. Install matching lockset keyed the same as the front door. Front entry Door: $ 978.55 + tax $58.68 Lockset and dead bolt (keyed alike) $63.27 + $3.79 Basement Door: $318.00 + tax $19.08 Basement lockset (keyed same as front) $31.12 + tax $1.86 Lumber and insulation (basement) $67.15 + tax $4.02 Permits and disposal $ 75.00 Labor Front door: $200.00 Labor Basement Door: $250.00 Price includes all permits, inspection and disposal fees due the city of Northampton. We propose to complete this project in accordance with above specifications for the sum of: Two thousand seventy and fifty two cents $ $2,070.52 Payments to be made as follows: 1. $2,070.52 When complete 2. 3. Acceptance: If the price, specifications, and conditions are satisfactory, please sign and return one copy to: Robert H. Dunn, Jr. Construction Services, Inc. 43 Burt Road Westhampton MA 01027 The customer copy of this proposal will be signed by the contractor before work commences. Any work or materials not specified above will result in additional charges. This proposal is valid for 30 days unless otherwise specified. Customer /Owner signature: a Date: 67//0 Contractor's signature: — ' !C� ,O Date: /o .I . , • 5.