Loading...
32C-149 606.2 Replace `reproofing' with `reroofing'. (IEBC typo) 606.2: Add this as a second sentence to exceptions 1 and 2: The cumulative effects since original construction shall be considered. 606.2.1 Replace `D, E, or F' with `B, C, D, E, or F' • (To some extent this is consistent with the 7"' edition section 3408.9.8 which has requirements for URM walls) 606.3.1 Replace `D, E, or F' with `B, C, D, E, or F' (Parapet bracing may be required by the IEBC only when reroofing is being done. The 7 may require parapet bracing depending on the scope of work. and may require it even if roof work is not in the scope of work. Committee feels that with the IEBC requirement in approximately 30 years (life span of avg. roof) all parapets will be reinforced adequately.) 606.3.1 Add this Exception Exception. Masonry parapets with a height to thickness ratio of 2.5 or less. The height of the parapet shall be measured from the level of where the unreinforced masonry walls are connected to the roof diaphragm. (Exception carried forward from the 7th edition. Value of 2.5 is used to be consistent with Appendix Al , Table AI -F) 6063.2 Replace `Where roofing....90 mph or in a special wind region, as defined in Section 1609 of the International Building Code' with `Where roofing materials are removed from the entire roof diaphragm of a building or section of a building located where one of the following conditions apply: 1. the basic wind speed is greater than 90 mph and the occupancy category is type III or type IV as defined in Table 1604.5 of the International Building Code 2009 with Massachusetts Amendments, (780 CMR 1604, Table 1604.5). 2. the basic wind speed is greater than or equal to 105 mph (With this amendment this requirement is triggered when the roof coverng is removed in total and when the building is located in a region with wind speeds greater than or equal to 105 mph. This is less stringent than the IEBC requirement because this is a new requirement m MA and the committee suggests that a less stringent requirement is appropriate at this time The committee feels that this requirement should not be deleted entirely since roof loss has occurred in recent wind events. Note that the committee did not add a time duration requirement.) • 707.4: Add this as a second sentence to exception 1: The cumulative effect of the stress increase since original construction shall be considered for the purposes of this exception. 707.5.1 Add subsection: 707.5.1 Irregularities. Where the alteration results in a structural irregularity as defined in ASCE 7, the lateral load- resisting structural elements shall comply with the structural requirements specified in Section 807.4. (This will trigger at least a minimum check for loads under the basic code. As currently written, no minimum lateral loads are specified if DCR increases less than 10 %.) 807.4.3 At the end of this section add these two sentences: For the purposes of calculating demand - capacity ratios, the demand shall consider applicable load combinations with design lateral loads or forces in accordance with Sections 1609 and 1613 of the International Building Code 2009 with Massachusetts Amendments (780 CMR 1609 and 1613(. For purposes of this section, comparisons of demand - capacity ratios and calculation Page 5 r -" \ ...o.. ' ''.7 , , " ' '''' '. '/;; ' :2 ' ' . ' ‘.:,!'!";,. . '.. , ii,„ A t- "*.' \ , „...4 - t " 'om ., r a r . s. �- s . � .: eye . ' -I'. .: -_ -�—'' .� 7 .,. .. - ' — ____ .n116 411 4 ' - ' ,- , ..1- Tv A w �+� ° te ' l a + � 4 { . 1 " MI . run ' L '''' '- - filr rm I August 1, 2012 Description of work to be performed on south brick wall at 287 Pleasant Street, above Michelson Avenue. All work to be performed in accordance with Brick Industry Association Technical Notes. At parapet: 1. Repair existing parapet that extends 24" or more above roof, from top of roof membrane up, approximately 28' length. 2. Repair chimney about 4' from west end of parapet, from top of roof membrane up. 3. At west end of parapet, extent top of west side brick wall up to top of parapet to create 16" return along west wall. This will look like a 24" thick end to the parapet wall. 4. Between chimney and west end of parapet, corbel brick on the roof side above top of roof membrane to create 12" parapet wall thickness 5. Brick detailing visible from the street will match existing. 6. Wall surface visible from the street will use existing sound brick as much as reasonable, and blend in new K +F Heritage Series extruded brick of similar color. 7. Pink mortar similar to existing used in same wall below At exterior wall above third floor windows: 1. Remove and reset loose sound brick. 2. Remove and replace spalled brick with existing sound brick salvaged from roof side of parapet rebuild above. 3. Repoint mortar with pink mortar similar to existing used in wall below. • The scope of work involved is eligible for exemption from the requirement for Construction Control under Chapter 1 Scope and Administration; Section 107 Submittal Documents; Subsections 107.1 and Subsection 107.6.1: o Subsection 107.1: General: Submittal documents consisting of construction documents, statement of special inspections, geotechnical report and other data shall be submitted in two or more sets with each permit application. The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional. o Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this code. o Subsection 107.6.1: Construction Control, General: This section shall apply to the construction controls, professional services and contractor services required for building and structures needing registered design professional services... . Where work is performed by licensed trades people pursuant to M.G.L. c. 112, s. 81R, plans and specifications prepared to document that work shall not be required to bear the seal or signature of a registered design professional. Given the information provided above, I respectfully submit that this project is eligible for exemption from the requirements of Construction Control. Sincerely, ( FeJ4.,r - 644 - A, Peter Frothingham, AIA Massachusetts Registered Architect #7801 Cc: Susan Hewett Page 3 of 3 o (3). The ordinary maintenance, repair or replacement of any exterior architecture feature which does not involve any change of design or appearance. o (18). Restoration of features of the same general design and appearance as existed historically on a structure when the Building Commissioner or Committee finds that there is adequate evidence to believe that the restoration is historically accurate and the restoration will not damage other historic features nor alter the historic character of the building. • Scope of work does not require further accessibility improvements to the building under Architectural Access Board Regulations: o 521 CMR 3.7 Partial Application: o When only a portion of a building is subject to 521 CMR, the full and fair cash value shall be prorated by the ratio of the square footage of that portion to the square footage of the whole building. • Current Assessed value of entire 18,020 + /- S.F. structure located at 263 -285 Pleasant Street = $704,420 • Building located at 263 -271 Pleasant Street = 34.5% of entire structure, its proportional value is $243,025 • Building located at 275 -285 Pleasant Street = 65.5% of entire structure, its proportional value is $461,395 o 521 CMR 3.3: Existing Buildings: o All additions to, reconstruction, remodeling and alterations or repairs of existing public buildings or facilities, which require a building permit or which are so defined by a state or local inspector, shall be governed by all applicable subsections in 521 CMR 3.00: JURISDICTION. o 3.3.1 If the work being performed amounts to less than 30% of the full and fair cash value of the building and o a. if the work costs less than $100,000, then only the work being performed is required to comply with 521 CMR • Construction work performed will be in accordance to the Eighth Edition of the State of Massachusetts Building Code, (2009 IEBC with Massachusetts amendments): o 780 CMR 202 DEFINITIONS: o REPAIRS, ORDINARY: Any maintenance which does not affect the structure, egress, fire protection systems, fire ratings, energy conservation provisions, plumbing, sanitary, gas, electrical or other utilities. A building permit is not required for ordinary repairs. o The scope of work does not include a change in structure, egress, fire protection systems, fire ratings, energy conservation provisions, plumbing, sanitary, gas, electrical or other utilities. Page 2 of 3 The Office of PETER FROTHINGHAM I.� J Registered Architect 181 Main Street, Suite One Northampton MA 01060 USA 413 585 5910 1 August 2012 Mr. Louis Hasbrouck, Building Commissioner Office of the Building Commissioner Puchalski Municipal Building 212 Main Street Northampton MA 01060 Re: 275 -287 Pleasant Street, South Parapet Repairs Mr. Hasbrouck: I have reviewed the scope of work description (attached) for parapet and wall repairs at the address above to be performed by Stosz Masonry of Whately MA. The following outline narrative is offered in support of a request for exemption from the requirements of Construction Control. • The property is: o located in the CB zoning district, and the Central Business Architecture District o is in a building of over 35,000 c.f. which appears to be of Type III construction • All of the work proposed is exterior masonry repair to match existing color and detail, and therefore is exempt from Central Business Architecture Commission review under Section 156 -5.0 -3 or C -18: o 156 -5. Central Business architecture; exemptions. o C. The following elements are specifically exempt from review by the Committee. The Building Commissioner shall issue permits for this work only after determining that the project is exempt: Page 1 of 3 The Office of P PETER FROTHINGHAM ;— �� Registered Architect - 2 telt 181 Main Street, Suite One Northampton MA 01060 USA 413 585 5910 TRANSMITTAL 1 August 2012 Mr. Louis Hasbrouck, Building Commissioner Office of the Building Commissioner Puchalski Municipal Building 212 Main Street Northampton MA 01060 Re: 287 Pleasant Street Northampton MA Parapet Repairs McCarthy Properties respectfully request exemption from the requirement of Construction Control for masonry repairs to the south parapet of their property located at the address above. I spoke with Chuck Miller on 30 July 2012, who indicated a permit was denied for these repairs due to the size of the building. We agreed I would submit this request for exemption from Construction Control. Attached please find: • Letter outlining eligibility for exemption from Construction Control requirements for masonry repairs at the above address. • Scope of Work description referenced in above. FOR YOUR REVIEW AND ACTION Peter Frothingham <..; The Commonwealth of Massachusetts Department of Industrial Accidents a Office of Investigations ` 600 Washington Street Boston, MA 02111 www.mass.gov /dia Workers' Compensation Insurance Affidavit: Builders /Contractors /Electricians /Plumbers Applicant Information Please Print Legibly Name ( Business /Organization/Individual) :y� 37'csS"Z, _ Address: c'f, 77 Z. J City /State /Zip: \,„,)\,-,c, «\c, 01 c..0 Phone #: `-1 J 3 2 :' 3 Are you an employer? Check the appropriate box: Type of project (required): I am a employer with 1 4. ❑ I am a general contractor and I employees (full and/or part- time).* have hired the sub - contractors 6. ❑New construction 2. ❑I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub contractors have 8. ❑ Demolition g for me in any capacity. employees and have workers' working . b Y P ty 9. ❑ Building addition [No workers' comp. insurance comp. insurance. required.] 5. ❑ We are a corporation and its 1 0.❑ Electrical repairs or additions officers have exercised their 11. Plumbing repairs or additions 3. ❑ I am a homeowner doing all work ❑ myself. [No workers' com right of exemption per MGL m Y comp. 12. ❑ Roof repairs insurance required.] t c. 152, §1(4), and we have no employees. [No workers' 13. ❑ Other comp. insurance required.] *Any applicant that checks box #1 must also fill out the section below showing their workers' compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. 'Contractors that check this box must attached an additional sheet showing the name of the sub - contractors and state whether or not those entities have employees. If the sub - contractors have employees, they must provide their workers' comp. policy number. I am an employer that is providing workers' compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Vie !\l c r- - -f o r _ Policy # or Self -ins. Lic. #: bra Qv yr SS P419 - Z - t Expiration Date: / a/ Job Site Address: c G "`! S ,w1 � =ls : +c v, City /State /Zip: tel . 11 Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one -year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a co py of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. - Si•nature: •t '., `:l £ Date: `r Phone #: ,3y Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City /Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other II Contact Person: Phone #: , Versionl.7 Commercial Building Permit May 15, 2000 SECTION 10- STRUCTURAL PEER REVIEW (780 CMR 110.11) r Independent Structural. Engineering Structural Peer Review Required Yes No 0 SECTION 11 - OWNER AUTHORIZATION - TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT , as Owner of the subject property hereby authorize `- act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner Date _ _._ .__._ , as Owner /Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and enalties of perjury Print Name Signature of Owner /Agent Date SECTION 12 - CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ License Number Address Expiration Date Signature — Telephone �1 , SECTION 13 - WORKERS'' COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes No Version1.7 Commercial Building Permit May 15, 2000 SECTION 9- PROFESSIONAL DESIGN AND CONSTRUCTION,SERVICES - FOR BUILDINGS AND STRUCTURES SUBJECT TO • CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116 (CONTAINING MORE THAN 35,000 C.F. OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable ❑ Name (Registrant): Registration Number Address �/ Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor __..._.. Not Applicable ❑ Company Name: Responsible In Charge of Construction Address Signature Telephone Versionl.7 Commercial Building Permit May 15, 2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to filled in by Building Department Lot Size Frontage Setbacks Front Side L.' .. -.. R.!........_._ L.w R:. _..._. Rear Building Height Bldg. Square Footage Open Space Footage ° (Lot area minus bldg & paved �l parking) # of Parking Spaces 1 Fill: (volume & Location) A. Has a Special Permit /Variance /Finding ever been issued for /on the site? NO Q DONT KNOW 0 YES 0 IF YES, date issued: IF YES; Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW YES IF YES: enter Book Page and /or Document # B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW 0 YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained (3 , Date Issued: C. Do any signs exist on the property? YES 0 NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES 0 NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO 0 IF YES, then a Northampton Storm Water Management Permit from the DPW is required. . s Version 1.7 Commercial Building Permit May 15, 2000 SECTION 4- CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE • '!' ' Interior Alterations ❑ Existing Wall Signs ❑ Demolition ❑ Repairs d Additions ❑ Accessory Building ❑ Exterior Alteration ❑ Existing Ground Sign ❑ New Signs ❑ Roofing ❑ Change of Use ❑ Other ❑ Brief Description Enter a brief description here. o,, e ak ,*, r A. Vt, u Of Proposed Work ; 'Crc'ow+, %AC.\t 4-D 6--X"^"0 `' Q G SECTION 5 - USE GROUP AND CONSTRUCTION TYPE USE GROUP (Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A -1 0 A -2 ❑ A -3 ❑ IA 1 ❑ A -4 0 A -5 0 113 ❑ B Business ❑ 2A ❑ E Educational ❑ 2B ❑ F Factory ❑ F -1 0 F -2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ Institutional ❑ 1 -1 ❑ 1 -2 ❑ 1 -3 ❑ 3B ❑ M Mercantile ❑ 1 4 ❑ R Residential ❑ R -1 ❑ R -2 ❑ R -3 ❑ 5A ❑ S Storage ❑ S -1 ❑ S -2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify__ S Special Use ❑ Specify: ___._ k ___ ...., a �_ �.r __ .. .� . t._ �.��_.....mm..�. COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING: RENOVATIONS, ADDITIONS AND /OR CHANGE IN USE Existing Use Group: _•._ Proposed Use Group: Existing Hazard Index 780 CMR 34): µ___ ._ _..._.._._.. Proposed Hazard Index 780 CMR 34):, u __ _...__...M ___. .... _. SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor (sf) 1 s t 1 5t 2nd _ . 2 nd _. _ .._..f .___M. .., _.__.. .. ._ _, 3 rd 3 . ________ 4th 4th Total Area (sf) Total Proposed New Construction (sf), Total Height (ft) Total Height ft 7. Water Supply (M.G.L. c. 40, § 54) 7.1 Flood_ Zone Information: 7.3 Sewage Disposal System: Public ❑ Private ❑ Zone ________, Outside Flood Zone❑ Municipal ❑ On site disposal system Version1.7 Commercial Building Permit May 15, 2000 Depa SS rtmeftt use' only City of Northampton Status of Permt# ` Building Department Curb Out/Dnr�eway Pero ttt a � € 2 2 Main Street Sewer /SepftcAvatfabrltfy¢ l l�j C1 20 ! - Room 100 Uater/Well AVallabilify Northampton, MA 01060 Two Sets of ucturaFPlans .: w , p au pho q;41'3- 587 -1240 Fax 413 - 587 -1272 Pla tte Plans rJ Other Specify APPLICATION TO CONSTRUCT, REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 - SITE INFORMATION 1.1 Property Address: This section to be completed by office %1 04.\z;:.o; - /c„ ( t friC?.re Vp Map Lot Unit Cti O 4 -4,r. , , , Vi r, Cc CA, Zone Overlay District Elm St. District CB District SECTION 2- PROPERTY OWNERSHIP /AUTHORIZED AGENT 2.1 Owner of Record: ' 6 /( ) 7 Name (Prin / Current Malin Address Signature �� Telephone �� ��� (j.) 2.2 Authorize, . ent: Name (Print) Current Mailing Address: __. Signature - .+' •. Telephone ry . SECTION 3 - ESTIMATED CONSTRUCTIOCOSTS Item Estimated Cost (Dollars) to be Official Use Only completed by permit applicant 1. Building t s • (a) Building Permit Fee 2. Electrical • mT (b) Estimated Total Cost of Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) ..:..._ ._.., .. ___._.... 5. Fire Protection _ 6. Total= (1 +2 +3 +4 +5) Check Number Mq q'4 This Section For Official Use Only Building Permit Number Date Issued Signature: Building Commissioner /Inspector of Buildings Date File # BP- 2013 -0161 APPLICANT /CONTACT PERSON STOSZ MASONRY ADDRESS/PHONE P 0 BOX 94 WHATELY (413) 325 -5253 PROPERTY LOCATION 287 PLEASANT ST MAP 32C PARCEL 149 001 ZONE CB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out f i Fee Paid /'y Tl�� Typeof Construction:_REPAIR PARAPIT WALL FROM BACK TO PLEASANT, POINTING ABOVE 3RD FLR WINDOWS New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 4209 3 sets of Plans / Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON IN_ FORMATION PRESENTED: V Approved Additional permits required (see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND /OR Special Permit With Site Plan Major Project: Site Plan AND /OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received & Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 1 V/t / 1 2, Signature of Buil ing Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning & Development for more information. 287 PLEASANT ST BP- 2013 -0161 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 32C - 149 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit # BP- 2013 -0161 Project # JS- 2013- 000260 Est. Cost: $10500.00 Fee: $60.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: STOSZ MASONRY 4209 Lot Size(sq. ft.): 10715/6 Owner: MCCARTHY PROPERTIES INC. C/O HAMPSHIRE PROPERTY MGMT Zoning: CB(100)/ Applicant: STOSZ MASONRY AT: 287 PLEASANT ST Applicant Address: Phone: Insurance: P O BOX 94 (413) 325 -5253 WC W HATELYMA01093 ISSUED ON: 8/17/2012 0:00:00 TO PERFORM THE FOLLOWING WORK: REPAIR PARAPIT WALL FROM BACK TO PLEASANT, POINTING ABOVE 3RD FLR WINDOWS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 8/17/2012 0:00:00 $60.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Commissioner