06-022 (3) CASELLA DESIGN ASSOCIATES, LLC
Date: January 06, 2012 '
REGEIVr �D
To: Mr. Louis Hasbrouck
Building Commissioner JAN 2 3 2012
City of Northampton
212 Main Street
Northampton, MA 01060 - NORRTTHAMPTNON�NMAa10 `
Re: Complete Restoration Solutions Fire Damage Repairs
Yankee Hill Condominiums.
48 Evergreen Road
Building #5,Unit #113
Leeds, MA 01053
Mr. Joseph Gillette, President
Complete Restoration Services
30 Haynes Circle
Chicopee, MA 01020
Dear Commissioner Hasbrouch:
Mr. Joseph Gillette, President of Complete Restoration Solutions has requested that you grant a
modification to waive the requirement for control construction for the project at Yankee Hill
Condominiums, 48 Evergreen Road, Building #5, Unit #113 in Leeds.
The anticipated scope of the work at this time appears to be of a minor nature, and is not
anticipated to affect health, accessibility, life and fire safety, or structural requirements, and is
impractical in that the cost of control construction is considerable when compared to the cost of the
proposed work.
If the scope of said work changes beyond the anticipated limited work above, and falls under
any portion of required Control Construction, Mr. Gillette or his designee shall contact your office, as
well as this office before proceeding.
Thank you for your consideration.
I
f Respectfully submitted,
‘" Raymond C. Casella, • .I.A., J.D.
DESIGN FOR EDUCATIONAL, MUNICIPAL & RELIGIOUS STRUCTURES
la ,) to „.. I , .,`fi4 v,. n i )iii 1 A � - _ /, Z i
CASEIIADESIGN,COM