Loading...
06-022 (3) CASELLA DESIGN ASSOCIATES, LLC Date: January 06, 2012 ' REGEIVr �D To: Mr. Louis Hasbrouck Building Commissioner JAN 2 3 2012 City of Northampton 212 Main Street Northampton, MA 01060 - NORRTTHAMPTNON�NMAa10 ` Re: Complete Restoration Solutions Fire Damage Repairs Yankee Hill Condominiums. 48 Evergreen Road Building #5,Unit #113 Leeds, MA 01053 Mr. Joseph Gillette, President Complete Restoration Services 30 Haynes Circle Chicopee, MA 01020 Dear Commissioner Hasbrouch: Mr. Joseph Gillette, President of Complete Restoration Solutions has requested that you grant a modification to waive the requirement for control construction for the project at Yankee Hill Condominiums, 48 Evergreen Road, Building #5, Unit #113 in Leeds. The anticipated scope of the work at this time appears to be of a minor nature, and is not anticipated to affect health, accessibility, life and fire safety, or structural requirements, and is impractical in that the cost of control construction is considerable when compared to the cost of the proposed work. If the scope of said work changes beyond the anticipated limited work above, and falls under any portion of required Control Construction, Mr. Gillette or his designee shall contact your office, as well as this office before proceeding. Thank you for your consideration. I f Respectfully submitted, ‘" Raymond C. Casella, • .I.A., J.D. DESIGN FOR EDUCATIONAL, MUNICIPAL & RELIGIOUS STRUCTURES la ,) to „.. I , .,`fi4 v,. n i )iii 1 A � - _ /, Z i CASEIIADESIGN,COM