Loading...
25A-185 (5) inspection and maintenance of the proposed infiltration basin and forebay as well as all existing drainage structures on the site. Inspection and maintenance tasks for the site include but are not limited to the following: biannual inspection and maintenance of the forebay, inspection and maintenance of all components of the infiltration basin, sweeping of paved areas, inspection and regular cleaning of catch basins, etc. The draft Stormwater Management System Operation and Maintenance Plan must be submitted to the DPW for approval and the final document will be signed by the owner and the Mayor of Northampton. Section 22 -85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. 2. This project will be required to submit one or more Notice of Intent (NOI) to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit. A copy of the final NOI and Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the Northampton DPW for approval prior to the start of construction and prior to issuance of a building permit. 3. The proposed stormwater management system is designed to mitigate peak stormwater flows. If, after construction of the proposed system, the system is found to increase stormwater flows to adjacent properties or to the municipal storm drain system, the owner shall redesign and reconstruct the drainage system to prevent any increased stormwater flows to adjacent properties or the municipal storm drain system. 4. The proposed infiltration basin and forebay shall not be used as a snow storage area. 5. The proposed infiltration basin and forebay shall be constructed as proposed and stabilized prior to receiving drainage flows from the proposed development. 6. Soil Boring logs were submitted, but the closest soil boring is over 500 feet from the proposed infiltration basin. An additional test pit must be conducted prior to construction to confirm the soils and the estimated seasonal high groundwater level at the location of the proposed infiltration basin. l a r iof City Engineer D to R i cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M: \Stormwater Permits \Permits_ Active \Industrial Drive \Coca Cola \045 Industrial Dr._Coca Cola North America.doc Page 3of3 b. Stormwater Detention Calculations, Filling Line Additions /Coca -Cola North America, Northampton, MA, including Checklist for Stormwater Report, Stormwater Report, TSS Removal Worksheet, Soil Report, Soil Data, Spill Prevention & Control Plan, and Drainage Calculations, prepared and stamped by William H. Wiseman, P.E., Hixson Architects and Engineers, Cincinnati, OH, dated 1/6/2010. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit to the DPW as -built plans stamped by a professional engineer of record in the Commonwealth of Massachusetts and a statement from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of as -built plans and the certification statement described above. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1 of each year (see Specific Condition 1 below). 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: 1. Prior to issuance of a Building Permit, the applicant shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. The maintenance schedule and responsibility for maintenance of all components of the stormwater management system must be adequately specified in Attachment A to this Agreement. The above - mentioned Agreement shall incorporate all stormwater operation, maintenance, and inspection tasks and requirements for the entire Coca -Cola site into one document. The Stormwater Report that is contained in the document named Stormwater Detention Calculations listed above states: "A draft copy of the operation and maintenance plan is included with the Spill Prevention and Control Plan and SWPPP." A separate document must be developed by the applicant for Attachment A mentioned above that outlines the schedule of required M: \Stormwater Permits \Permits_ Active \Industrial Drive \Coca Cola \045 Industrial Dr._Coca Cola North America.doc Page 2of3 1 6 /7( R 1 * 2 � , , , �' t STORMWATER MANAGEMENT PERMIT APPLICATION DECISION City of Northampton Department of Public Works k! " 2 1 2010 Project / Site Name: Coca -Cola North America, Filling Line Addition Project Street or Location / Assessor ID: 45 Industrial Dr. / 25A -185 Applicant Name: William Wiseman, Hixson Architects and Engineers Applicant Address/Phone: 659 Van Meter St., Cincinati, OH 45202 / 513 -241 -1230 Owner Name: Coca Cola North America Owner Address /Phone: 45 Industrial Dr., Northampton, MA / 413 -582 -6508 Application Submission Date: 12/11/2009 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. Filling Line Addition, Coca -Cola North America, Northampton, MA, Site Plans, Sheets C0.1, C2.1, C4.1, C5.1, stamped by William H. Wiseman, P.E., Hixson Architects and Engineers, Cincinnati, OH, dated 1/6/2010. M: \Stormwater Permits \Permits_Active \Industrial Drive \Coca Cola \045 Industrial Dr._Coca Cola North America.doc Page 1of3 s s 10. Do any signs exist on the property? YES x NO IF YES, describe size, type and location: i4 A / ✓�? UGl< ,&N77P.9A✓G6 / o TNL i /T.F Are there any proposed changes to or additions of signs intended for the property? YES NO X IF YES, describe size, type and location: 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES X( NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Department EXISTING PROPOSED REQUIRED BY ZONING Lot Size / 7 7,4 a/, 77/4 6 Frontage a/8 , /87r Setbacks Front aQr`T vZ ©f T Side L: /`JFr R: /5, L: 15 e'T R: /jET L: R: Rear v•OF% F T Building Height 38FT 38f-T Buildin Square Footage 4 /5 (, 65 v sit.= r 4'70 35 sctE r % Open Space: (lot area minus building i* paved alv"ej o? y7 parking # of Parking Spaces /55 /55 # of Loading Docks a3 a 16 Fill: (volume Et location) N/A aD0.(2Y 8fR 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: I a/ It 109 Applicant's Signature 4 .� NOTE: Issuance of a zoning permit does not relieve an applic is burd n to comply with all zoning requirements and obtain all required permits from the ? oard of Health, Conservation Commission, Historic and Architectural Boards, Department of Public Works and other applicable permit granting authorities. W:\Documents\FORMS \original\Buil ding- Inspector\ Zoning - Permit- Application- passive.doc 8/4/2004 ia i t `+ i r , 1 File No. RP/03 3 ¢£. aNI PERMIT AJ{'PLICIT'IDN ( §i o. Please ty pe or print all information and return this form to the Building Inspector's Office with the $15 filing fee (check or money order) payable to the City of Northarnpton 1. Name of Applicant: CODA c '4.,4 A4RT /' ApncRr�.4 (J/A1 LANE) Address: 1 /Arras r /R/AL 4 vt Telephone: A Y/ 3— S9 - 6 _ 2. Owner of Property: Go4-s9 60<s4 A/Gos?7N Address: I /6 /sv /Ju s.7RAtZ �s ?ivi Telephone: z '13 — 58a — 6 500 3. Status of Applicant: Owner X Contract Purchaser Lessee Other (explain) 4. Job Location: 1 7'5 - / 4 / — ParcelId.' Zort�n �+Iap � A Parc 5 el# /, Distnet(s) Ih EhmStreet Distnct 9 � lri Central Bljsi ess Dtstrtet s r h ;' , ` r w. ' (TO 13E,rFILLED,IN BY THE BUILDING DE1?A,RTMENT) .. s . . . 5. Existing Use of Structure /Property: e 47G. 4 e<-A TT<swG- G/z /; %i 6. Description of Proposed Use /Work /Project /Occupation: (Use additional sheets if necessary): /N i A � �1� � T/C 'ij > /4 z- A4014/ COG/4 Y .�` s4 J c. / ODD , /1.�1`w .0 So F7 6-i`v 7. Attached Plans: Sketch Plan Site Plan )C Engineered /Surveyed Plans 8. Has a Special Permit /Variance /Finding ever been issued for /on the site? NO DONT KNOW YES IF YES, date issued: / j i . 3 IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW �C YES IF YES: enter Book Page and /or Document # 9.Does the site contain a brook, body of water or wetlands? NO DON'T KNOW YES )C IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained FI2 qui 2oiVF_ Obtained , date issued: (Form Continues On Other Side) W:\ Documents\ FORMS \origin ]\Building - Inspector\Zoning - Permit- Application- passive.doc 8/4/2004 File # MP- 2010 -0033 APPLICANT /CONTACT PERSON COCA COLA COMPANY (JIM LANE) ADDRESS /PHONE 45 INDUSTRIAL DR (413) 582 -6508 0 PR! - 0 a ° as Y, 3 ;, 0i 5A i :: bit 1O0)/ " • THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST �,� ENCLOSED REQUIRED DATE C�GONING FO' ■ FILLED OUT Fee Paid f'O Building Permit Filled out Fee Paid Tvpeof Construction: ZPA - ADDITION New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 3 sets of Plans / Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Approved Additional permits required (see below) �/,�(')/_ PLANNING BOARD PERMIT REQUIRED UNDER : § / 0 J 1 1 / & 0J PPS S `- Intermediate Project : Site Plan AND /OR Spe ial Permit with Site Plan ?lain J / ' • Major Project: Site Plan AND /OR pecial Permit with Site Plan / J r-/ A If ZONING BOARD PERMIT REQUIRED UNDER: § 011— Finding Special Permit Variance* J Received & Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit • -from Elm -Street C 'ssion Permit DPW Storm Water Management i.--------,:::ir."..)e'-#(4: /47/a7 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning & Development for more information.