Loading...
31B-157 TA C 1 6—i_Cy i c f P4& X 44 V , g 044 A41444404% kaere ROOM. 1301 .. o M14414•4 0 21 0 8 - 1619 Pitysi K17)727-3200 foot (6171 -5132 FINAL CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers, Architects responsible for only a portion of a controlled project) Project Title: 98 King Street Renovation Date: July 7, 2011 Project Location: Elm Street, Smith College Campus. Northampton MA Scope of Project: Complete Renovation In accordance with Section 116.2.2 of the Massachusetts State Building Code, 780 CMR, Seventh Edition, I, Charles P Sharpies Mass. Registration Number 28940 being a registered professional Engineer hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural [X ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other (specify) for the above named project and that to the best of my knowledge, such plans. computations and specifications meet the applicable provisions of the Massachusetts State Building Code. all acceptable er ineering practices and all applicable laws for the proposed project. I further certify that I have perfonned the necessary professional services and I or my Representative have been present on the construction site on a regular and periodic basis to determine that the work has proceeded in accordance with the documents approved for the building permit and shall be responsible for the following as specified in Secion 116.2.2. 1. Review for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the Contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code - required controlled materials. 3. Be present at intervals appropriate to the state of construction to become generally familiar with the progress and quality of the work and to determine in general if the work is being performed in a manner consistent with the construction documents. Pursuant to Secion 116.4. I have submitted progress reports together with pertinent comm-_ c,; ., - Building Inspector. Upon completion of the work, I am submitting this Final Report as to the h ,t3tciy t ;`, �, tion of the work and readiness of the project for occupancy. f i 4 " CHARLES P. Signature and Seal of registered professional ' ` i , ito , ` ' '5 /' BSCRIBED AND SWORN TO BEFORE ME THIS ('- D.4Y O ' 2011. 7 C r , r. i - . ,. _ . —Y- MY COMMISSION EXPIRES // 3 I , ' Y PUBLIC - A DARLENE L. MEACHAM 1 i Notary Public COMh1QNWEAL H OF MASSACHUSETTS My Commission Expires May 11, 2015 TA r,( H,,,,„,,,,d Nfre4 al p selfigit „. , z irs- ,,gai ff i 044 A411.0444s. L Resoo. 1301 ,. S'4 g014414%) H4+414 021094619 1 M7)727 fmt (617) 727 -5732 FINAL CONSTRUCTION CONTROL DOCUMENT (for Professional Engineers /Architects responsible for only a portion of a controlled project) Project Title: 98 King Street Renovation Date: July 7, 2011 Project Location: 98 King Street, Northampton, MA Scope of Project: Complete Renovation In accordance with Section 116.2.2 of the Massachusetts State Building Code, 780 CMR, Seventh Edition, I, Evert O. Lindgren, Jr. Mass. Registration Number 22425 being a registered professional Engineer hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [X ] Electrical [ ] Other (specify) for the above named project and that to the best of my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable ergineering practices and all applicable laws for the proposed project. I further certify that I have performed the necessary professional services and I or my Representative have been present on the construction site on a regular and periodic basis to determine that the work has proceeded in accordance with the documents approved for the building permit and shall be responsible for the following as specified in Secion 116.2.2. 1. Review for conformance to the design concept, shop drawings, samples and other submittals which are submitted by the Contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code - required controlled materials. 3. Be present at intervals appropriate to the state of construction to become generally familiar with the progress and quality of the work and to determine in general if the work is being performed in a manner consistent with the construction documents. Pursuant to Secion 116.4, I have submitted progress reports together with pertinent comments to the Building Inspector. Upon completion of the work, I am submitting this Final Report as to the satisfactory completion of th- work and readiness of the project for occupancy. �P�tH OF 4,, q\ � ? EVERT tiN Signature and Seal of registered professional: ���� � - 0 0. LINDGREN, u B1� <- ' JR P.E. a' j' A , p No. 22425 '�a �rsrE� � �` � S SCRIBED AND SWORN TO BEFORE ME THIS 0 DAY OF 4,( 201 L FSSr� LNG ' i 21 ( , ^ f - MY COMMISSION EXPIRES tillnraT: - "ENE MEACHAM NO P LIC Notary Public COMM OF MASSACHUSETTS My Commission Expires May 11, 2018 Sara E. Campbell, PE Consulting Civil Engineer July 7, 2011 Mr. Louis Hasbrouk, Building Commissioner City of Northampton Northampton, MA 01061 Re: 98 King Street, Northampton Dear Mr. Hasbrouk Being a registered professional Engineer, I hereby certify that I have directly prepared all design plans, computations, and specifications concerning CIVIL ENGINEERING for the above project and that, to the best of my knowledge, such plans, computations, and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices, and applicable laws and ordinances for the proposed use and occupancy. Based on my site observation and to the best of my knowledge, information, and belief, the portion of the work indicated above has been completed in compliance with the applicable provisions of the Massachusetts State Building Code per section 116.2.1 and the contract documents prepared by our office for the Architect. Sincerely yours, Sara E. Campbell, PE KingCO 16 Prospect Street Millers Falls, MA 01344 saranoh@aal.con, 413 - 4232 -3581 1_8 - j Ford Gillen Architects, Inc. 409 Main Street Amherst, MA 01002 Tel 413- 253 -2528 Fax 413 - 256 -1553 fgaofEce@fordgillen.com Kathleen E. Ford, AIA William V. Gillen, AIA July 7, 2011 Mr. Louis Hasbrouk, Building Commissioner City of Northampton Northampton, MA 01061 Re: 98 King Street Northampton Dear Mr. Hasbrouk Being a registered professional Architect, I hereby certify that I have directly prepared all design plans, computations, and specifications concerning ARCHITECTURAL for the above project and that, to the best of my knowledge, such plans, computations, and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices, and applicable laws and ordinances for the proposed use and occupancy. Based on my site observation and to the best of my knowledge, information, and belief, the portion of the work indicated above has been completed in compliance with the applicable provisions of the Massachusetts State Building Code per section 116.2.1 and the contract documents prepared by our office. Sincerely yours, 11110 /1" ip 6 Kathleen E. Ford The Commonwealth of Massachusetts , 4 /- City of Northampton r p Certificate of Occupancy In accordance with 780 CMR, Section 5120.2 (The Seventh Edition of the Massachusetts State Building Code) this Certificate of Occupancy is issued to the premise or structure or part thereof as herein identified. Identify Name of Building of Space Within Certificate No. Issued to Valley Community Development Corporation BP- 2011 -0069 Identify property address including street number, name, city or town and county Located at 98 King Street Northampton, Hampshire, Massachusetts Use Classificati n(s) B (Business) R -2 (10 Unit Dwelling) This Certificate of Occupancy is hereby issued by the undersigned to certify that the premise, structure or portion thereof as herein specified has been inspected for general fire and life safety features. This certificate shall allow for the use as herein described and in conformance with any and all conditions as identified below. It shall be posted in a conspicuous place within the space as directed by the undersigned. Failure to post the certificate, failure to comply with conditions or, tampering with the contents of the certificate is strictly prohibited. Conditions of Use All Safety and Structural Must Be Maintained Name of Municipal Date of Inspection Map /Plot: Building Official Charles Mille 07/08/11 Signature of Municipal - O to f Issuance 31B -157 Building Official / „,. A d 1; 4 7, 2 • 3/, G:7 zt.9 14 2/ J44-7 44i7 7 if-1 1 E- z>” -CM d4j 1--A t 1 40'? # 7OQ 0 454 Z:t..2.1 ?"-Rb; I71 iM) IIQ # - 9 ) -) / PF-4 4 -ill A )1 1116 1 „2,00,a7 o - '),10 411 — cl 4- l ' 4711 /11- 4 41 i P ".4 141° DC/V.1 y.?,2 c iyj, 7 14 -2 1 -E c I dfq tic.1 . ttv 'SW,' V . g 5 riP y lAro 4 r - )7 11 , 4 r 1! , - Fni r ). 7 o, )1 ZifA s e P 1 ›./ I dx)xa „>K ?w, ir /.06 :)10 t vg b_ ---- z , cas - 77. - 1 - ' a , ,,nrry9 ms)!, •q.1.- — --\ 1 1 ■1 1, 6.0 1 1 0 4, 98 KING ST BP- 2011 -0069 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 31B -157 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: renovation BUILDING PERMIT Permit # BP- 2011 -0069 Project # JS -2009- 001118 Est. Cost: $936000.00 Fee: $5616.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: 3B Contractor: License: Use Group: B,R2 TEAGNO CONSTRUCTION INC 034716 Lot Size(sq. ft.): 5401.44 Owner: VALLEY COMMUNITY DEV CORP Zoning: GB(100)/ Applicant: TEAGNO CONSTRUCTION INC AT: 98 KING ST Applicant Address: Phone: Insurance: P 0 Box 2054 (413) 549 -0803 Workers Compensation AM H E RSTMA01004 - 2054 ISSUED ON :: 8/31/2010 0:00:00 TO PERFORM THE FOLLOWING WORK: RENOVATE TO 10 EFFICIENCY APARTMENTS & GROUND FLR COMMERCIAL SPACE POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of W' in D.P.W. Building Inspector Underground:12 410 ' 1 vice: Meter: � �' `� � t S �-�( b -� Z � y ti.-, Fo o�in ►�.� Ro ugh : ��`'`� House # Foundation � a Driveway Final: �l Final: 'a- �`� l / < Final: • 6 / / / 4v1s .� We ` �3� y = 1� Rough Frame: Rafr+.t 4 14 0L #a(1 1'C Pe * .a.,:‘ t ry Ekem;e. f !141 .14101/4.. cC"I, -lvr es or Aqc e Gas: Fire Department Fireplace /Chimney: : - 2 Oil: Rough i� Insulation: 3_3(3 _ / f - // 3 /( cn Final: Co e2 I 2. Smoke: Final: 7- -S —// k 11i 1 do THIS PERMIT MAY BE REVOKED BY E CI Y OF ►tORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REG • �' Certificate of Occu. anc nature: - FeeType: Date Paid: Amount: Building 8/31/2010 0:00:00 $5616.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Commissioner