Loading...
31B-039 n � ♦ f inHome Remodeling PROJECT NAME: Mike and Jamie Zmurko 39 Summer Street Northampton, MA 01060 Date: May 12, 2010 413- 587 -0460 Consultant:. Richard A. Ahlstrom ❑ Patch in siding in location of old light. ❑ Provide and install one wet location can light in ceiling of porch roof structure. ❑ Patch in red oak strip flooring at location of old walls. o Provide and install poplar paint grade trim stock at staircase. ❑ Provide and install new paint grade trim to blend with existing at new wider doorway and baseboard. o Provided and install eight (8) new oak stair treads with returns on both ends. ❑ Sand living room and hallway floors. aeae Pi 3 Ce.c , o Sand and poly new oak stair treads. ❑ Paint ceiling one (1) coat ceiling white. l� 1 n s h `' "' , / , 6o777 S' ' o Paint trim one (1) coat trim color. o Paint walls one (1) coat wall color. ❑ Install electrical covers and finish. Total: $23,559.68 The following allowances are included: Allowance for fiberglass door and hardware $1,000.00 Allowance for electrical service and fixtures $1,875.00 Allowance for stair handrail material $750.00 Option # 1 Provide and install one (1) Larson storm/screen door on new front door. Larson door model 346 -60 in white. Add $852.00 We assume all pre- existing conditions to be sound, any additional damage that is . found will be addressed with an addendum to the original contract. NOTE: This proposal may be withdrawn by inHome if not approved by an authorized inHome General Manager/Officer or accepted within 15 days of presentation. License Number(s): Construction Supervisor CS 073454 Expiration Datt(s): 04/10/2012 Home Improvement # 149724 Expiration Date(s): 02/02/2012 START DATE: inHome will contact the owner within five business days upon receipt of this signed contract and its first payment, to schedule the work. PAYMENT, will be made as follows: upon signing 6 0� • 00.00 upon start $6.000.00 upon start of drywall $6.000.00 upon start of painting $3,000.00 upon completion $2,559.6$ ACCEPTANCE: The above prices, specifications, conditions, and Terms and Conditions on the reverse side a . by accepted. You are authorized to perform the work specified. BY: !I' �4�1 BY: /4 Authorized signature, Ink Black Inc. dba inHome Remodeling Owner(s) Date: -( i_ (10 903 Hampden Street Holyoke, MA 01040 (413) 584-7700 or (413) 533 -9900 Office (413) 533 -9904 Fax V 4 i__ 5k5 3 00 inHome Remodeling PROJECT NAME: Mike and Jamie Zmurko 39 Summer Street Northampton, MA 01060 Date: May 12, 2010 413 -587 -0460 Consultant: Richard A. Ahistrom We hereby propose to perform remodeling and/or repair work upon the above mentioned premises per the following description, scope, allowances, exclusions and general conditions. INTERIOR RENOVATIONS: Scope of work: Renovate living room and stairway to open space and expose stairway to second floor. ❑ Protect interior living space from dust and debris. o Seal off dinning room and second floor from work area. o Provide city of Northampton building permits. ❑ Demo and remove interior wall sections per plan. o Provide temporary support as needed. o Demo and remove drywall on ceiling so as to access framing. ❑ Remove old blocking. o Remove existing handrail and balusters and save. o Demo and remove oak strip flooring in areas of old wall sections. o Jack up area of first floor under stairs so as to straighten it out. o Provide and install one (1) new 3" steel cement filled lolly column with steel plates in new area of support. o Additional framing in basement, if necessary, is not included. ❑ Cut wall section at stairway back 10' -10" ( + / -) off front wall. o Add Framing in first floor ceiling to support second floor. o Demo and remove eight (8) oak stair treads and front risers. o Reframe wall section at side of stair. o Demo pocket door to dining room and widen opening. o Frame new wall section around chimney. o Provide electrical services to install new switches, receptacles, and recessed lighting per plan, by sub. o Patch in 1 /s" drywall on ceiling and walls. ❑ Scrape /sand ceiling and remove texture. o Tape drywall patches and skim coat ceiling. o Sand ceiling and walls. ❑ Prime ceiling and wall patches. o Provide and install one (1) new fiberglass stain grade entry door. ❑ New door and jamb to be installed in existing location at front of house. o Stain door slab with fiberglass stain kit. o Remove exterior and interior casing around door unit. o Demo door and frame and remove from site o Door to be 3' -0" x 6' -8" ❑ Drill for passage set and deadbolt. o Aluminum bronze colored threshold and a 6 1/4" jamb. o Trim out exterior of new door to blend with existing trim. o Exterior trim material to be white PVC. o Door swing to be left hand in swing. o Replace trim piece under doorsill on the exterior. o Insulate around new doorjamb. o Trim out interior to blend with existing trim. ❑ Clean excess caulk/sealant from door. ❑ Install existing lockset and deadbolt. ❑ Remove existing carriage light. BY: -- BY: Authorized signature, Ink Black inc. dim inllome Remodeling Owner(s) Date: 903 Hampden Street Holyoke, MA 01040 (413) 584 -7700 or (413) 533 -9900 Office (413) 533 -9904 Fax