Loading...
31B-159 (8) City of Northampton • Massachusetts ,, .._ �� DEPARTMENT OF BUILDING INSPECTIONS v 212 Main Street • Municipal Building Northampton, MA 01060 Elizabeth Ann Seton Parish Reverend John Connors 3 Elm Street Northampton, MA 01060 August 9, 2010 re: Saint Elizabeth Ann Seton Parish project 31B-159 Dear Reverend Connors, I have reviewed the zoning permit application you submitted on July 29, 2010. Additional permits are required if you wish to proceed with this project. This project will require a site plan review by the planning board as a major project per Northampton ordinance chapter 350, section 11. Additionally, the Historical Commission has determined that the Rectory is a preferably preserved structure and cannot be demolished without permission from the Historical Commission, or until the demolition delay period has passed. Feel free to call if you have any questions. Our telephone number is (413) 587 -1240 Louis Hasbrouck Building Commissioner City of Northampton Hasbrouck a(�city.northampton.ma.us 10. Do any signs exist on the property? YES X NO IF YES, describe size, type and Location: Independent standing sign indicating name of 1 church. Less than 40 ft2 in size, less than 5 ft. high. Located along King Street (in front). Are there any proposed changes to or additions of signs intended for the property? YES X NO IF YES, describe size, type and location: in CB, less than 40'ft less . than.f3 -feet, interval illuminations 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES NO X IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building Department EXISTING PROPOSED :0; iW Lot Size 2.9 acres 2.9 acres Frontage 395 feet 395 feet Setbacks Front 50 80 Side L:36 R: 45 L: 15 R: 134 R Rear 45 95 Building Height new (78' Church) 22 feet Building Square Footage 15,781 22,235 % Open Space: (lot area minus building Et paved ? parking 68% 55% # of Parking Spaces L: 48 118 # of Loading Docks 0 0 Fill: (volume ft location) No significant cut cr fill 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: ' / Applicant's Signature 1Vu 1" riSp a - Issuance of a zoning permit does not relieve an applicant's i u den to comply with all zoning requirements and obtain all required permits from the Board of Health, Conservation Commission, Historic and Architectural Boards, Department of Public Works and other applicable permit granting authorities. W:\ Documents\ FORMS\ original \Building- Inspector\Zoning- Permit- Application- passive.doc 8/4/2004 mil ,t L, dtD_ 2 9 2010 File No. /� /1 1 11 � ®1� � rt" * ° ' .LNG P MIT APPLICATION ( i o .2) Please type or print all information and return this form to the Building Inspector's Office with the $Y5 filing fee (check or money order) payable to the City of Northampton 1. Name of Applicant: St. Elizabeth Ann Seton Parish, Rev. John Connors Address: 3 Elm Street, Northampton, MA 01060 Telephone: ( 413) 584 -7310 2. Owner of Property: Ronan Catholic Bishop of Springfield, A Corporation Sole Address: 65 Elliot Street, Springfield, MA 01102 Telephone: (413) 732 -3175 3. Status of Applicant: Owner X Contract Purchaser Lessee Other (explain) 4. Job Location: 9 King Street, Northampton, MA Parcel Idr- Zoning Map# Parcel# ; In Elm Street District • In: Central- Business Olstrict TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Existing Use of Structure /Property: Church 6. Description of Proposed Use /Work /Project /Occupation: (Use additional sheets if necessary): Work will include construction of new paved parking lot and Parish Center. The approximate footprint of the Parish Center will be 14,000 .ft Existing Parish Center and Rectory to be demolished. 7. Attached Plans: Sketch Plan Site Plan X Engineered /Surveyed Plans X 8. Has a Special Permit /Variance /Finding ever been issued for /on the site? NO DONT KNOW X YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES IF YES: enter Book Page and /or Document # 9.Does the site contain a brook, body of water or wetlands? NO X DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , date issued: (Form Continues On Other Side) W:\ Documents\ FORMS\ original\Building - Inspector\Zoning - Permit- Application -passive.doc 8/4/2004 Pi File # MP- 2011 -0011 ,a APPLICANT /CONTACT PERSON CONNORS JOHN REV ADDRESS/PHONE 3 ELM ST (413) 584 -7310 () Std % : k 1 h 8 THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE C FO' ' LLED OUT Fee Paid i _ Building Permit Filled out Fee Paid Typeof Construction: ZPA - CONSTRUCT PARKING LOT,PARISH CTR,DEMO EXISTING PARISH CTR & RECTORY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 3 sets of Plans / Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRES TED:��—� Approved Additional permits required (see below) /vlA �f� PLANNING BOARD PERMIT REQUIRED UNDER : § 356S-- I 1 , 0 N nn O 1 ,. C� i � ( I ecok Intermediate Project : ' e Plan AND /OR Special Permit with Site Plan 1 " '-� S. -m �l, Cn, Major Project: Site Plan AND /OR Special Permit with Site Plan ��" C / E i.tT *Q , 1J O ZONING BOARD PERMIT REQUIRED UNDER: § Pdt i 6�' Finding Special Permit Variance* te eZTli 00 t 1j � � Received & Recorded at Registry of Deeds Proof Enclosed c HraPC 6' i Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management u-,--` ,i. - %_ 1 V S / (C) Signature of Building fficial icia l Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning & Development for more information.