18D-058 /g'
• RYAN S. HELLWIG, PE • STRUCTURAL ENGINEER •
Secondary Construction Control Document
# oF
k ricle
September 1, 2010 o f RYAN s.
HELLWIG 1,
Louis Hasbrouck STRUCTURAL v
No. 37300
Q -
Building Commissioner SEP - 9 2010 Alt
p g �r7 ,
Municipal Office Building J A7fir ,r
212 Main Street -$.4
Northampton MA 01060
Re: Saint - Gobain Ceramic Coating Solutions
175 Industrial Drive
Northampton, MA
Project: New Processing Room
Architect: Peter Lapointe, Archimetrics Design Studio, Northampton, MA
General Contractor: Wright Builders Inc., Northampton, MA
In accordance with the 7 Edition of the Massachusetts State Building Code (780 CMR) §116, I
hereby certify that I have personally prepared the STRUCTURAL design drawing S1 dated 8/30/10
for this project. To the best of my knowledge this drawing conforms to the applicable provisions of
the Code and to accepted engineering practice.
I shall personally perform the necessary professional services during construction of that portion of
the work shown in the above - mentioned drawing to determine that it satisfies the design intent of
said drawings as submitted for the building permit, plus any revisions, including the following:
1. Review, for conformance with the design concept, shop drawings and/or
material specification submittals made by the General Contractor;
2. Be present at the site at appropriate times during construction to observe
and become generally familiar with the progress and quality of the work.
I shall also submit to you a final report upon the completion of the this portion of the project.
Respectfully,
Ryan S. Hellwig, P.E.
• 28 ALDRICH STREET • NORTHAMPTON, MA 01060 •
• VOICE 413 - 584 -HLWG (4594) • FAX 413 - 584 - HLWFax (4593) •
• A Fire Department Emergency Access Key Box is required on the exterior of
the structure near the entrance to control equipment; a red 120 - candela
strobe light that actuates upon an alarm condition is required above the
Emergency Access Key Box.
• Engraved key tags are required for the keys in Emergency Access Key Box.
• 5 lb ABC Fire extinguishers are needed located at exits. This shall be in
compliance with NFPA relative to maximum travel distance. Appropriate
signage in compliance with ADA should be located above.
• Page 2
Northampton ampto
Department
Memorandum
To: Louis Hasbrouck
From: Duane Nichols
Date: September 9, 2010
CC: Brian Duggan, Larry Therrien
Re: 175 Industrial Drive , Saint Gobain
Secondary to a review narrative submitted to me for review, I concur with the
issuance of a building permit subject to the following conditions:
• Fire alarm work permits shall be obtained for the project. The CIO inspection
fee needs to be paid prior to approval of any fire alarm plan.
• The Fire Alarm Control Panel and Fire Alarm Annunciator must be labeled
with red engraved signage with one -inch white lettering "Fire Alarm Control
Panel" and /or "Fire Alarm Annunciator". Also engraved signage listing all fire
alarm zone locations installed near panels.
• A graphic representation of the structure with the new changes must be
installed at the Fire Alarm Control Panel (FACP) and /or Fire Alarm
Annunciator and /or Communicator.
• Pull Stations shall be double action type.
• Page 1
occur. The Fire Alarm Control Panel is equipped with a 24 -hour battery back up.
The Fire Alarm Control Panel is equipped with visible and audible signals to
indicate alarm and trouble conditions.
3.0 Test Criteria:
All features, devices, components, and modes of operation shall be tested for acceptance in
accordance with the code and NFPA 72. Smoke detectors shall be activated using a magnet per
the manufacturer's recommendations. All pull stations shall be activated by opening and upon
activation of each device; the Fire Alarm System shall be checked for proper operation including
annunciation at the Fire Alarm Control Panel. Proper operation in the emergency power mode
shall be demonstrated as well as a check of supervision circuits for opens and shorts.
* * * End of Basis of Design Narrative * * *
L &S 1901 Page 6
•
and key box. A graphic map of the building and zone schedule is mounted
adjacent the Annunciator.
D. System connected smoke detectors is existing at the fire alarm control panel and
as required by code. The Activation of any system smoke will initiate the fire
alarm system sequence of events.
E. Manual pull stations are required to be installed and located within 5 feet of each
exit door and at all entry points leading to an egress way and shall initiate the fire
alarm system sequence of events. New pull stations are to be installed at the
exterior egress doors of the storage addition.
F. Fire alarm system notification and signaling devices in this building include the
following features:
1. Audio notification devices in the form of Horn/Strobes to be installed as
shown on plans. It is the intent of this design that audible notification
devices achieve sound pressure levels of 15 dba above ambient sound
levels in all areas of the building in compliance with chapter 4 -3 of NFPA
72.
2. Visual notification devices in the form of Horn/Strobes and Strobe only
appliances to be installed as shown on the plans. It is the intent of this
design that visual notification devices achieve appropriate coverage for
public areas in compliance chapter 4 -4 of NFPA 72. This includes strobe
notification in all examination and procedure rooms for protection of
patients undergoing procedures.
G. This project does not include any special design considerations or anticipated
deviations from the code requirements.
2.0. Sequence of Operation:
A. This fire alarm system is designed to detect fires normally associated with this
type of facility. The system can be activated manually through the use of manual
pull stations. The system shall be activated automatically via smoke detector. In
any of these events the system shall initiate the fire alarm sequence of events.
Initiation of the fire alarm sequence of events will immediately and
simultaneously activate all horns and visual units in the building to notify
occupants, and perform all activities as programmed, including annunciator
interaction. The red exterior strobe shall be engaged. There is no automatic
dialer installed, or required, at this project.
The Fire Alarm System reset button returns the system to its normal state.
Display messages shall provide operator assurance of the sequential steps as they
L &S 1901 Page 5
B. All spaces are provided with quick response sprinklers heads in all areas.
3.0 Equipment
A. Pipe is to be schedule 40 steel pipe for 1" through 2 ".
Pipe is to be schedule 10 thin wall steel pipe for 2 ' /2" through 6 ".
4.0 Design Criteria
A. The upper floors are designed for light hazard occupancy. The density is .1/1950
square feet with al 00 gpm hose allowance.
B. The areas throughout the building that are ordinary hazard, such as storage and
mechanical space, the system will be designed to ordinary hazard group, density
with 250 gpm added for hose stream.
5.0 Special Design Criteria
A. All sprinklers in mechanical equipment spaces shall be fitted with wire cages.
6.0 Test Criteria
A. All sprinklers and standpipe systems shall be tested in accordance with NFPA 13.
Complete system flow test will be conducted and test and flow certificates issued.
SECTION 6- FIRE ALARM SYSTEMS
1.0 Basis of Design
A. New fire alarm system work associated with this project includes the expansion of
the existing notification alarm circuit & initiation circuit loops as required to serve
the new space. Existing alarm system circuits shall be measured verify capacity is
available to support the added device load.
B. The existing fire alarm system features a zone type Fire Alarm Control Panel
(FACP) by Fire -Lite Alarms Inc. The FACP is located in this tenant's mechanical
room and serves the entire building though 10 zones. The emergency (battery -
backup) power supply has been sized to be adequate for both 24 hours of
monitoring and a minimum of 15 minutes of alarm and is located at the FACP.
Battery calculations with the additional loads shall be submitted to verify capacity
is available to support the added device load.
C. A fire alarm annunciator is located at the main entry vestibule of the building
accessible from the east (main) parking lot. This is the Fire Department primary
response point and also features an exterior red strobe interlocked to the alarm,
L &S 1901 Page 4
SECTION 2 - APPLICABLE LAWS, REGULATIONS & STANDARDS
Systems were designed in compliance with the following:
1. 780 CMR 9, "Fire Protection Systems ".
2. NFPA 13 — 2007, "Installation of Sprinkler Systems ".
3. NFPA 72 — 2007 "National Fire Alarm Code ".
4. 521 CMR 40, "Architectural Access Board
5. 527 CMR 24
6. 780 cmr34 "Existing Buildings"
SECTION 3 - DESIGN RESPONSIBILITY
Fire Alarm System
Lindgren & Sharpes, P.C.
Consulting Engineers
435 Cottage Street
Springfield, MA 01104 -4005
Phone: 413 - 732 -4336
SECTION 4 — DESIGN METHODOLOGY
1.0 The project consists of minor renovations within the existing building. Under this contract
all areas affected by renovation work will be evaluated for code compliance, fire alarm
system modification will be made as well as upgrades to much of the existing detection
and notification systems. New fire alarm system devices will be addressable and
compatible with the existing system. There is no requirement for automatic sprinklers in
the renovated tenant space.
SECTION 5 - FIRE PROTECTION
1.0 Basis of Design
The entire building is currently served by a wet pipe fire protection system consisting of
sprinklers located in all spaces. The sprinkler system is to be fed from an existing 6 inch
sprinkler service with a double check backflow preventor and wet pipe alarm valves. Under this
contract the existing sprinklers on the west side of the building will be renovated to support the
planned architectural renovations, a glycol sprinkler system will be installed to serve the new
storage shed, and existing wet pipe sprinkler system will be modified to serve the new process
space.
2.0 Installation
A. The fire sprinkler system is designed in accordance with NFPA 13, 2002.
L &S 1901 Page 3
•
•
Saint - Gobain Ceramic Materials
FIRE PROTECTION AND ALARM SYSTEM
BASIS OF DESIGN NARRATIVE
September 1, 2010
Information required pursuant to the Massachusetts State Building Code 780 CMR, 903.0.
Owner: Saint - Gobain Corporation
Designers of Record: Lindgren & Sharpies, P.C.
Consulting Engineers
Date of Submittal: September 1, 2010
SECTION 1 — BUILDING DESCRIPTION
PROJECT SCOPE:
This project consists of the construction of a process /production room located in the existing
warehouse space of the facility located at 175 Industrial Drive, in Northampton, Massachusetts.
In addition this project will add a new attached storage garage on the west side of the building.
This project will include modifications to the existing zone type fire alarm system to serve the
renovated areas.
The Building is Use Group Type B (Business) and the Construction Type in the area of
renovation is 2B, Unprotected as defined by the Massachusetts State Building Code.
The existing building consists of approximately 40,000 square feet on one level, with no
basement. The total area affected by this project includes 2000 square feet for the new process
area, as well as 1200 square feet of new construction for the attached storage space.
Fire Department personnel and rescue vehicles can access the site from the east, north, or west
using Industrial Drive and the adjacent parking areas and driveway . The fire department main
response point is the east (main) entry door.
L &S 1901 Page 2
NARRATIVE REPORT
FOR
FIRE PROTECTION & ALARM SYSTEMS
AT
Saint - Gobain Ceramic Materials
175 Industrial Drive
Northampton, MA 01060
PREPARED BY:
LINDGREN & SHARPLES, P.C.
CONSULTING ENGINEERS
435 COTTAGE STREET, SUITE 1
SPRINGFIELD, MA 01104 -4005
TEL. 413- 732 -4336
September 1, 2010
WriIGHTsBUILDERS, INC. 035623
DATE INVOICE NO. JOB NO. COMMITMENT NO. AMOUNT DISCOUNT NET AMOUNT
8 05? 1 7800 .00 78.00
CHECK DATE CHECK NO. TOTAL GROSS TOTAL DISCOUNT CHECK AMOUNT
8-31-10 35623 78.00 .00 78.00
,,*L242.11L-:=frMaYL
WRIGHT BUILDERS, INC. FLORENCE SAVINGS BANK 035623
FLORENCE, MA 01062
48 BATES STREET 53-7168/2118
NORTHAMPTON, MA 01060
413-586-8287
F ay; *tkpktk*kmkttst.ttt.tt*f(*ktkkttAtg-t*rns a an d no cen
DATE CHECK NO. CHECK AMOUNT
aUGUElt 31. 2010 33= Sg A k A "t *irk fir)
NOT VALID AFTER 90 DAYS
1.7 T Y 0 ± );TOR MALT TON
GNATURES REQUIRED ON C • ' OVER $5000.00
/ NP
" i AUTHORIZED SIGNATURE
NP
AUTHORIZED SIGNATURE ,
ECURITY FEATUSES INCLUDED. DETAILS GN SACK. n
00 3 56 2 311 1: 2 LB ? 186881: 0 L 25 00 5606v
Northampton Fire Dept.
Fees
Job: St Gobain
175 Industrial Drive
Northampton, MA
Floor Squ. Ft. x 0.04 Fee
New mezzanine 756 x 0.04 $30.24
New shed addition 1188 x 0.04 $47.52
TOTAL: 1944 x 0.04 $77.76
Scope of fire protection per "Narrative Report for Fire Protection & Alarm Systems"
dated 9/1/10 and drawings submitted to Northampton Building Dept on 9/1/10.
Wright Builders will mail $78.00 check (and copy of FPN) directly to Asst. Chief
Duane Nichols, NFD.
Electrical sub - contractor to pull the Fire Alarm Work permit and pay
the associated $80 permit fee.
(Both checks are made out to the City of Northampton.)
cc: Louis Hasbrouck, Northampton Building Commissioner
Asst. Chief Duane Nichols
Prepared by Wright Builders, Inc. 9/2/2010
10. Do any signs exist on the property? YES NO
IF YES, describe size, type and location: /s i< a. `6 Gx- }41 y't •e
l'r'e v .ri o' d dr vh /-e_ de(, fir? _5,9* t 5 m o v,i ee (0->„ 4c 4.49
Are there any proposed changes to or additions of signs intended for the property? YES NO L
IF YES, describe size, type and location:
11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common
plan of development that will disturb over 1 acre? YES NO ‘,/
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
ZONING
Lot Size
/60/ z 17- s 760, z9 z s
Frontage
362.3 I .362_3/
Setbacks Front /6 • 39 7q. /z'. ?fi ,4 . -Za
Side L: /(v• be, /R : /S/ 9i ,4L L: /(GYrff'- R: 67. L: ' 15 R:
Rear 5Z. 52.31 -
Building Height ,n 72 -A t - 4+, ZL{7
Z 2 �• � ^ � 2i��aa x � x
Building Square Footage
30 /Z5 6% C.
% Open Space: (lot area
minus building Et paved 90. ` f 7, Soho 20 a
parking
# of Parking Spaces //em!uu
`T0
# of Loading Docks Z
Fill:
(volume Et location) /VO4-e •
13. Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: �i '3 7/0 Applicant's Signature
NOTE: Issuance of a zoning permit does not relieve an applicant's burde o comply with all zoning
requirements and obtain all required permits from the Board of H alth, Conservation Commission,
Historic and Architectural Boards, Department of Public Works and other applicable permit granting
authorities.
W: \Documents \FORMS\original\ Building- Inspector\Zoning- Permit - Application - passive.doc 8/4/2004
File No. �/ 710
' M i s l'" ' U . I NG PERMIT APPLICATION `( §1 o.2)
) E r
Please type or print all information and return this form to the Building
_i LInsi'VGt&rr5s ditce ,with the $15 filing fee (check or money order) payable to the
City of Northampton
Dr 0 D'''r "i?" ir5
1. r'Narrre offAppU _T
car1t: 4 f C7 G C r,i r‘,
/ 7 5' lh1dv5h',a= T M1lig Telephone: 3 0-°- tei . -
Address: 9 � �17f0- P��i/�' �
2. Owner of Property: 01�tA LI IAAi — .� c *'��11 p
Address: ,k. 54-_ tioNC, i4 0) (O t O Telephone: ( 5 .--.-- Z- - " - U 77
3. Status of Applicant: Owner Contract Purchaser Lessee Other (explain)
4. Job Location: l 7....0 t'ydt" - Wick:. icc,( Th✓e NOY''F- /lp4A19T04,_ i flt/f 0106 0
Parcel Id: Zoning Map# ` , — Pa rcel# S L7 D f'�'
In Elm Street District In Central Business District
(TO BE FILLED IN BY THE BUILDING DEPARTMENT)
5. Existing Use of Structure /Property: /J 2/i iGT(Jrf4 aj
6. Description of Proposed Use /Work /Project /Occupation: (Use additional sheets if necessary):
. c ld i bury: 0 a i/1 04 1 t S ca e' spa c,e
7. Attached Plans: Sketch Plan Site Plan Engineered /Surveyed Plans
8. Has a Special PermitiVariance /Finding ever been issued for/on the site?
NO DON'T KNOW YES ✓ IF YES, date issued: • `� t1 � U -�
IF YES: Was the permit recorded at the egistry of Deeds? •
NO DON'T KNOW YES
IF YES: enter Book Page and /or Document #
9.Does the site contain a brook, body of water or wetlands? NO V DON'T KNOW YES "
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained , date issued:
(Form Continues On Other Side)
W:1 Documents \FORMS\ original \Building- Inspector\Zoning- Permit - Application- passive.doc 8/4/2004
File # MP- 2011 -0027
APPLICANT /CONTACT PERSON WRIGHT BUILDERS
ADDRESS/PHONE 48 Bates St (413) 586 -8287
r=,V `• ,F ./',113
PROPERTY LOCATION 175 INDUSTRIAL DR
MAP 18D PARCEL 058 001 ZONE GI(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
( -- - Z6NING FO ► • FILLED OUT
Building Permit Filled out
Fee Paid
Typeof Construction: ZPA - ADDITION OF STORAGE SPACE _
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License
3 sets of Plans / Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
IN PRESENTED:
Approved Additional permits required (see below)
PLANNING BOARD PERMIT REQUIRED UNDER : §
Intermediate Project: Site Plan AND /OR Special Permit with Site Plan
Major Project: Site Plan AND /OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received & Recorded at Registry of Deeds Proof Enclosed _
Other Permits Required:
_Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
E/2-‘
Signature of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning & Development for more information.
• RYAN S. HELLWIG PE • STRUCTURAL ENGINEER •
August 30, 2010
Re: Saint - Gobain Ceramic Coating Solutions
175 Industrial Drive
Northampton, MA
Project: Exterior Storage Shed
Subject: General Design Criteria
1. All Structural Work shall conform to the Massachusetts State Building Code, 7 Edition.
2. Existing Building Design Criteria per Chapter 34
Level of Work 1 per 3408.4
3408.1.3 New Addition is structurally independent of the existing building and
designed as per new construction
3. New Building Design Criteria per Chapter 16
Building Classification Category II
Importance Factor I = 1.0
Snow: Ground Snow Load = 55 psf
Temperature Factor C 1.0
Exposure Factor C 1.0
Flat Roof Snow Load: p = 38.5 psf
Sloped Roof Factor C = 1.0
Width of Upper Roof Wbu = 152 ft.
Potential Drift Height H = 5.0 ft.
Wind: Wind Speed V = 100 mph (3 second gust)
Exposure B
Seismic: Seismic Use Group I
Site Soil Class = E (assumed)
Mapped Maximum Considered Earthquake Spectral Response
Acceleration at Short Periods S = 0.22
Acceleration -based Short Period Site Coefficient F = 2.5
Design Spectral Response Acceleration at Short Periods S = 0.37
Seismic Design Category C
• 28 ALDRICH STREET • NORTHAMPTON, MA 01060 •
• Voice = 413 - 584 -HLWG (4594) • Fax = 413 - 584 - HLWFax (4593) • Email = rshpe @crocker.com •
piA.4 is MA- (A'N- N 6 `ln'N & k ' f To - (44&-- bjf
® RYAN S. HELLWIG, PE e STRUCTURAL ENGINEER
Secondary Construction Control Document .ve+ °F 4f,„
R YAN S. t
September 1, 2010 it Haim* c.1
3 STRUCTURAL cn
Nb. 37340
Louis Hasbrouck 4tCtSitSk
Building Commissioner ' , ��,��
Municipal Office Building
212 Main Street
Northampton MA 01060
Re: Saint- Gobain Ceramic Coating Solutions
175 Industrial Drive
Northampton, MA
Project: New Processing Room
Architect: Peter Lapointe, Archimetrics Design Studio, Northampton, MA
General Contractor: Wright Builders Inc., Northampton, MA
In accordance with the 7t Edition of the Massachusetts State Building Code (780 CMR) §116, I
hereby certify that I have personally prepared the STRUCTURAL design drawing Si dated 8 /30/10
for this project. To the best of my knowledge this drawing conforms to the applicable provisions of
the Code and to accepted engineering practice.
I shall personally perform the necessary professional services during construction of that portion of
the work shown in the above - mentioned drawing to determine that it satisfies the design intent of
said drawings as submitted for the building permit, plus any revisions, including the following:
1. Review, for conformance with the design concept, shop drawings and/or
material specification submittals made by the General Contractor;
2. Be present at the site at appropriate times during construction to observe
and become generally familiar with the progress and quality of the work.
I shall also submit to you a final report upon the completion of the this portion of the project.
Respe ully,
,' an .H• ig'.E
....- r
• 28 ALDRICH STREET • NORTHAMPTON, MA 01060 •
• VOICE 413 - 584 -HLWG (4594) • FAX 413 - 584- HLWFax (4593) •
TA w H i44
t Paces sillay
1f � O4A4144 1301
..��•�� g., M1441444414 0210$161$
P4,4 gin 7274200
fM (617) 727 -5732
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers /Architects responsible for only a portion of a controlled project)
Project Title: Saint Gobain Date: 09/01/2010
Project Location: Industrial Drive, Northampton, Massachusetts
Scope of Project: New Processing Room & Exterior Storage Facilities
In accordance with the 7th edition Massachusetts State Building Code,780 CMR SECTION 116.0:
I, Mark W. Felgate Mass. Registration Number 47531
being a registered professional Engineer /Architect hereby CERTIFY that I have prepared or directly supervised the
preparation of all design plans, computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical
[ ] Fire Protection [ X ] Electrical [ ] Other (specify)
for the above named project and that to the best of my knowledge, such plans, computations and specifications meet the
applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable
laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the
above mentioned portions of the work proceed in accordance with the documents approved for the building permit.
Upon completion of the work, I shall submit a final report as to the satisfactory completion of the above mentioned
portion of the work.
Signature and Seal of registered professionalp NH
7 MARK W.
FE
ELECTRICAL
No. 47531
a�6t01MAl ��G
tii,440.44444
pl ,,,, 4 „. 4 p 54
1.1
i �j' 0 Lia 0
i r A�'��. 13 1
.,�• °� g., me44.414.4414 02109-109
Piist4 (617) 727 -3200
fiat (617) - 732
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(for Professional Engineers /Architects responsible for only a portion of a controlled project)
Project Title: Saint Gobain Date: 09/01/2010
Project Location: Industrial Drive, Northampton, Massachusetts
Scope of Project: New Processing Room & Exterior Storage Facilities
In accordance with the 7th edition Massachusetts State Building Code,780 CMR SECTION 116.0:
I, Charles P. Sharpies Mass. Registration Number 28940
being a registered professional Engineer /Architect hereby CERTIFY that I have prepared or directly supervised the
preparation of all design plans, computations and specifications concerning:
[ ] Entire Project [ ] Architectural [ ] Structural [ X ] Mechanical
[ ] Fire Protection [ ] Electrical [ ] Other (specify)
for the above named project and that to the best of my knowledge, such plans, computations and specifications meet the
applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable
laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the
above mentioned portions of the work proceed in accordance with the documents approved for the building permit.
Upon completion of the work, I shall submit a final report as to the satisfactory completion of the above mentioned
portion of the work.
Signature and Seal of registered professional: 0f
CHARLES
a P.
3 SHARPIES /
.p_ 18 9 4 00
ARCHIMETRICS DESIGN STUDIO EN
28 NORTH MAPLE UNIT B •
FLORENCE, MA 01062 \J
August 31, 2010
Louis Hasbrouck, Building Commissioner
City of Northampton
212 Main Street
Northampton, MA 01060
Project: Mezzanine and Storage Shed for Saint Gobain
175 Industrial Drive, Northampton, MA
CONTROLLED CONSTRUCTION AFFIDAVIT
In accordance with Section 116.0 of the Massachusetts State Building Code, 7th
Edition, I, Peter E. Lapointe, Massachusetts Registration No. 5291, being a
registered Architect, hereby certify that I have prepared or directly supervised the
preparation of all design plans, computations and specifications for the above
mentioned project.
I further certify that I will perform the necessary professional services during
construction and be present on the construction site on a regular and periodic
basis to determine that the work is proceeding in accordance with the drawings
and specifications approved for the building permit.
�G (�.1.Ap ••%
Et! No. 5291 N
S Shelimns Falh. E
tAA
\ 1 ylfrF
f -.'" r ✓' `�- --ms's I /
Peter E. Lapointe
PETER LAPOINTE, ARCHITECT PH 413 582 -9100 FAX 413 582 -9101 www.archimetrics.net
1
•
i
3 .
i , ...., • 03Q/$ h$ X /VI/ T
1 (7817 2 ) i it
1
,W'VZZaV\) - v -N I
•
°'d
/(1 7 1, V
1
i
11.7...L.„....,.„,
1
i '9 4 6--C # . 1,0 1 1 G I I
l _ - Cie t a5•zzD { a -c ;may 'szooT Z/ i
i
r+
'e
r
a - 95 alzrr��
I
_______•
I
09010 'ss'yL o aaz�c��so
, „.„..„, \ 2u:p n g Iad . �aa�s ^rTL oI� tt0
I •,--, 1 S 0, S h'I D -J I) 30 ? Nik t rc3v
, > , 7_, � -- ��� trII1d,Ir?' 12.0 -, ID I17I; k F � l :
I
, Versionl.7 Commercial Building Permit May 15, 2000
SECTION 10- STRUCTURAL PEER REVIEW (780 CMR 110.11)
Independent Structural Engineering Structural Peer Review Required Yes Q No
SECTION 11 - OWNER AUTHORIZATION - TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
1 ` P! "' Lr S1 . Iglu IL,. - , as Owner of the subject property
hereby authoriz V C`', i mp. L.E.,uvelt, to
act on my behalf 'n all matters ativ to wo authorized by this building permit application.
4 )Fr‘
Signature of ner Date
1, W P-' Gl & "' l "1'W / frl k'r k L1)wel _ , as Owne(Authorized)
Agent ereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge
- • •elief.
Signed under the pains and penalties of perjury. _
Print Name
4 / 1 „ , t.....‹... ,C . 4 ��� 1 e)--0 /d
Signature of Owner /Agent Date
SECTION 12 - CONSTRUCTION SERVICES
10.1 Licensed Construction S pervisor: Not Applicable 0 �(
Name of License Holder : W Y ' L `/Y U '" - [ /v' � '^" "•' G 6 f f le / f p
License Number
Ltir g sr. N012.-r)i-NAt A4 A' > I 1 1
Address 8P-)-t) Expiration Date
.7.-'---"( ' Silk,
Signature • Telephone
SECTION 13 - WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M.G.L. c. 152, § 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes ►.! No
. .
47(0 7 l t )44 •= 7/ #2
\ creton`, - t r„orranerclai ButtdIng Permit Mat. 15 2non
SECTION 9- PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES - FOR BUILDINGS AND STRUCTURES SUBJECT TO
CONSTRUCTION copintot. PURSUANT 70 780 CUR 116 1CONTAINING MORE THAN 35,000 Of ,, OF ENCLOSED SPACE) ...
9.1 Registered Architect
Not Aoptican 0
1
Name (Registrant: _____ _
Regrstrattoe Ntrortear
1 ,ee L
,
, Exporatton Date
, coot ,,. - ,,
r
Sow '''''' rtteowsft
9,2 Regtatered Professional Engineerts):
I
„.... 1
A
_ ........... .
Name Area „A Nespon,stottery
Zott At, tCciooi '`,.`r pi f"? 7 c.)„,) 1, T3 C
- -- .- — ---,— ..
Ai ress '7 Regstraton Numuer
SIgnattre Team:twee F X. pp.r.don ')A4*
bsgel_P__ - kAt C2 — -0'
Name' Arta et Nespoonottorott
' A 4 1 'e : 'Plitifie
d iO r f., / Regostrahoh hatcher
Ir • 1/A '....r:....lig - ____,_
/ c t r :074 gime. 36„ 04,12,
, ognattare e i e p ne E cea. KAI Date
r „—
c4...4 vi • _f_440.,1 c_, j, E. E. lee...itri
_
Name Atha co 4
co,i-i i 4 olio 4(7 3 /
Address Regtostrettror he 1
..r e--------___ - _
(q/07 - g33 43 Oe:, 1 'Z—
. _
Sagnalure Te.eproorte Erporattor Date
Name Atee Go Ftesconsittoirty
1
Artoresrt, Regostremce Nur' te'
StgrueVe Teiepootece tirce 44(14 Dwe
9.3 General Contractor
WP-1 eltf P) / Lt■ Nat Appitcattle M
Company Name
A01 A44* torta
Resportatboe In Charge or
41 otA/sf cr ffili-TetAlbtit) To t`r, Ni r
1 Stgrtatuie _
• f (,lK ' . All-ke4 6.0.4 -o vb 20rn'r i)/►ie>
Version! .7 Commercial Building Permit May 15, 2000 U y� " � 6
8. NORTHAMPTON ZONING +'
Existing Proposed Required by Zonin:
This column to be • in by
Building De.. ent
Lot Size
Frontage
Setbacks Front
Side L: R: L: R:'',
Rear
Building Height
Bldg. Square Footage
Open Space Footage
(Lot area minus bldg & paved
parking)
# of Parking S.: ces
Fil
aume & Location)
A. Has a Special Permit /Variance /Finding ever been issued for /on the site?
NO 0 DONT KNOW 1 4. 4 01 YES 0
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO 0 DON'T KNOW 0 YES 0
IF YES: enter Book Page and /or Document #
B. Does the site contain a brook, body of water or wetlands? NO t ®1 DONT KNOW 0 YES Q
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Q Obtained Q , Date Issued:
C. Do any signs exist on the property? YES �® NO Q
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO
IF YES, describe size, type and location:
E. Will the construction activity disturb (clearing, grading, exc. ation, or filling) over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES Q NO 41
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
Version1.7 Commercial Building Permit May 15, 2000
SECTION 4- CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000
CUBIC FEET OF ENCLOSED SPACE
Interior Alterations 3, Existing Wall Signs ❑ Demolition ❑ Repairs ❑ Additions Accessory Building ❑
Exterior Alteration ❑ Existing Ground Sign ❑ New Signs ❑ Roofing ❑ Change of Use ❑ Other ❑
Brief Description Enter a brief description here. S P-k k D 0 L'th61.1
Of Proposed Work:
SECTION 5 - USE GROUP AND CONSTRUCTION TYPE
USE GROUP (Check as applicable) CONSTRUCTION TYPE
A Assembly i-_-.] A -1 ❑ A -2 ❑ A -3 ❑ 1A 1 ❑
A -4 ❑ A -5 ❑ 1B ❑
B Business ❑ 2A ❑
E Educational ❑ 2B 1 ❑
F Factory F-1 ❑ F-2 ❑ 2C
H High Hazard ❑ 3A ❑
1 Institutional ❑ 1 -1 ❑ 1 -2 ❑ 1 -3 ❑ 3B ❑
M Mercantile ❑ 4 ❑
R Residential ❑ R -1 ❑ R -2 ❑ R -3 ❑ 5A ❑
S Storage ❑ S -1 ❑ S -2 ❑ 5B l ❑
U Utility ❑ Specify:
M Mixed Use ❑ Specify:
S Special Use ❑ Specify:
COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS, ADDITIONS AND/OR CHANGE IN USE
Existing Use Group: rtl�ee�'O .. Proposed Use Group: 1 .0 2' 4 G
Existing Hazard Index 780 CMR 34)::_. Proposed Hazard Index 780 CMR 34):
SECTION 6 BUILDING HEIGHT AND AREA
BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY
Floor Area per Floor (sf) fib
1sc, 1 st f ji 5
2nd 2 nd
3rd 3 rd
4 th
4 "'
Total Area (sf) 3 T>I 15 Total Proposed New Con t uc i _(sfl
Total Height (ft) ,» 4 4
Total Height ft 1l „ '�
7. Water upply (M.G.L. c. 40, § 54) 7.1 Flood Zone Information: 7.3 Sewa e isposal System:
Publi Private ❑ Zone Outside Flood Zone Municipal On site disposal system❑
Versionl.7 Commercial Building Permit May 15, 2000
Department use, only
City of Northampton Status of Permit
Building Department Curb Cut/Driveway Perrntt
�
212 Main Street Se {Septic "Availab
Room 100 Weter%WellAvailability
Northampton, MA 01060 Two Sets of, Structural d lens
phone 413 -587 - 1240 Fax 413 - 587 - 1272 Plot/SitePlans
Other Specify
APPLICATION TO CONSTRUCT, REPAIR, RENOVATE, CHANGE THE USE OR OCCUPANCY OF, OR DEMOLISH ANY BUILDING
OTHER THAN A ONE OR TWO FAMILY DWELLING
SECTION 1 - SITE INFORMATION
This section to be completed by office
1.1 Property Address: /�
cf • d-'0 'N IN 1, US ttl, /� � �" t� Map Lot Unit
1 9 5 1 NI,UStf2•)P(1' a2- Ve Zone Overlay District
1' r Elm St. District CB District
SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT
2.1 Owner of Record:
e.11 41 AM �Q 9r. 6$10‘11,1 115 1Nw tAv � ., Nol
Name (Print) Current Mailing Address: ppr/
*,, 0 1
Signature Telephone
_ i______ i_ iz),7______t /
2.2 Authorized Agent
Name (Print) Current Mailing Addres :
S Telephone
-
SECTION 3 - ESTIMATED CONSTRUCTIO OSTS
Item Estimated Cost (Dollars) to be Official Use Only
completed by permit applicant
1. Building i 6 s∎ 6 g ( , (a) Building Permit Fee
2. Electrical $'1...7 7 93 g, (b) Estimated Total Cost of
[ Construction from (6)
3. Plumbing j'( . y . 3 ., Building Permit Fee
4. Mechanical (HVAC) V e tf - --•
5. Fire Protection ,� l �-- ! 4� °
6. To = (1 + + 3 + 4 + 5) 15 9 t . -t ' --- Check Number 36�G 3�? I/
c 4 This Section For Official Use Only e
Build' g rmit Number Date
Issued
Signature:
Building Commissioner /Inspector of Buildings Date
•
File # BP- 2011 -0191
APPLICANT /CONTACT PERSON WRIGHT BUILDERS
ADDRESS/PHONE 48 Bates St NORTHAMPTON (413) 586 -8287
PROPERTY LOCATION 175 INDUSTRIAL DR
MAP 18D PARCEL 058 001 ZONE GI(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid
Building Permit Filled out er -076/3 3 _ a Q 5,2 __ Fee Paid 15(p �P 7
Typeof Construction: STORAGE SHED ADDITION & INTERIOR MEZZANINE
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/ Statement or License 047146
3 sets of Plans / Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF RMATION PRESENTED:
Approved Additional permits required (see below) EU 1J CI: O K
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND /OR Special Permit With Site Plan
Major Project: Site Plan AND /OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received & Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Demolition Delay
9113/1
Signs e of Building Official Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health, Conservation Commission, Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning & Development for more information.
v /� f 4
- Pr 2-v * ■ j/ /Y -£J Z 9 f -9 N VP u� rlirr► , / >
175 INDUSTRIAL DR BP- 2011 -0191
GIS #: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 18D - 058 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: ADDITION BUILDING PERMIT
Permit# BP- 2011 -0191
Project # JS- 2011- 000273
Est. Cost: $157241.00
Fee: $952.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: WRIGHT BUILDERS 047146
Lot Size(sq. ft.): 160300.80 Owner: OLDON LIMITED PARTNERSHIP
Zoning: GI(100)/ Applicant: WRIGHT BUILDERS
AT: 175 INDUSTRIAL DR
Applicant Address: Phone: Insurance:
48 Bates St (413) 586 -8287 Workers Compensation
N O RT HAM PTO N MA01060 ISSUED ON :9/14/2010 0:00:00
TO PERFORM THE FOLLOWING WORK: STORAGE SHED ADDITION & INTERIOR
MEZZANINE
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Fo
n>s
Rough: Rough: `6.4. , r 40 House # Foundation :1i — y- !C� C �
C Driveway Final:
JJI . e* l� i..,1 tL+ld —
Final: Final: =v , e+ �'
/��0 %i 6W0 Rough Frame:
Cftizz44/. 6uisrL)
Gas: Fire Department Fireplace /Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final: O 1.-- — 4(0,44
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF Ai ANY OF ITS RULES AND ' 1 14104.4 0�
Certificate of Occupanc 1 Signature:
FeeType: Date Paid: Amount:
Building 9/14/2010 0:00:00 $952.00
212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272
Louis Hasbrouck — Building Commissioner