Loading...
18D-053 (7) 1 final NOI and Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the Northampton DPW for approval prior to the start of construction and prior to issuance of a building permit. .,.4, g Si;; ature of ty Engineer Date l cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development \ \Eng \engineering \Stonnwater Permits\ Permits_ Active \Damon Road \080 Damon Rd_River Run Condos.doc Page 3or3 c. River Run Condominiums, Bioretention Basin Cross - Section Detail, Figure 1.1, dated July 2009, prepared by Stantec Consulting Services, Inc. d. HydroCAD Drainage Calculations for New Parking Area, dated 7/24/2009 and stamped by Aharon Sharff, P.E., Stantec Consulting Services, Inc. e. TSS Removal Worksheet, dated July 17, 2009, prepared by Aharon Sharff, P.E., Stantec Consulting Services, Inc. f. Recharge Volume Worksheet, dated 7/23/2009, prepared by Aharon Sharff, P.E., Stantec Consulting Services, Inc. g. Stormwater Pollution Prevention Plan for River Run Condominiums, dated 6/7/2009, Prepared by Jeff Le Beau, Jr., P.E. for A. Martins & Sons Construction, Inc. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. At the completion of the work, including construction of stormwater management facilities and landscaping, the applicant shall submit a statement to the DPW from a professional engineer of record in the Commonwealth of Massachusetts certifying that the materials and construction of the stormwater management system was constructed in accordance with the approved plans and will function as designed. All changes to the approved stormwater facilities shall be documented by a professional engineer of record in the Commonwealth of Massachusetts and approved by the DPW prior to submission of the certification statement described above. 4. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1 of each year. 5. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: 1. Prior to completion of construction, the applicant shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. This agreement shall be approved by the Northampton DPW and signed by the owner and the Mayor of Northampton. Section 22 -85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. 2. This project will be required to submit one or more Notice of Intent (NOI) to the U.S. EPA for coverage under the NPDES Stormwater Construction General Permit. A copy of the \ \Eng \engineering \Stormwater Permits \Permits Active \Damon Road \080 Damon Rd River Run Condos.doc Page 2of3 r Ma T �� STORMWAER MANAGEMENT PERMIT y APPLICATION DECISION City of Northampton Department of Public Works 1: Project / Site Name: River Run Condominiums Project Street or Location / I 1 d q,� :` ' :g / x� * rs�r��'�'�i 1Vortham �tl,�s�',�.i..,+s i.. '�' t , ; Applicant Name: Tony Martins Applicant Address /Phone: 679 Moore Street, Ludlow, MA / 413 - 283 -9630 Owner Name / Address: Stephen Henderson, Classic Management / 80 Damon Rd. #1, 585 -9745 Application Submission Date: 7/28/2009 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. River Run Condominiums, Proposed Infrastructure Improvements, Notice of Intent Plan, SK -1, dated 4/17/2009, prepared by Stantec Consulting Services, Inc. b. River Run Condominiums, Stormwater Management For New Parking Area, Figure 1.0, dated 8/4/ 2009, stamped by Aharon Sharff, P.E., Stantec Consulting Services, Inc. \ \Eng \engineering \Stormwater Permits \Permits_Active \Damon Road \080 Damon Rd_River Run Condos.doc Page 1 of 3