18D-053 (7) 1
final NOI and Stormwater Pollution Prevention Plan (SWPPP) shall be submitted to the
Northampton DPW for approval prior to the start of construction and prior to issuance of a
building permit.
.,.4, g
Si;; ature of ty Engineer Date
l
cc. Planning Board c/o Office of Planning and Development
Building Department
Conservation Commission c/o Office of Planning and Development
\ \Eng \engineering \Stonnwater Permits\ Permits_ Active \Damon Road \080 Damon Rd_River Run Condos.doc
Page 3or3
c. River Run Condominiums, Bioretention Basin Cross - Section Detail, Figure 1.1,
dated July 2009, prepared by Stantec Consulting Services, Inc.
d. HydroCAD Drainage Calculations for New Parking Area, dated 7/24/2009 and
stamped by Aharon Sharff, P.E., Stantec Consulting Services, Inc.
e. TSS Removal Worksheet, dated July 17, 2009, prepared by Aharon Sharff, P.E.,
Stantec Consulting Services, Inc.
f. Recharge Volume Worksheet, dated 7/23/2009, prepared by Aharon Sharff, P.E.,
Stantec Consulting Services, Inc.
g. Stormwater Pollution Prevention Plan for River Run Condominiums, dated
6/7/2009, Prepared by Jeff Le Beau, Jr., P.E. for A. Martins & Sons Construction, Inc.
2. The Northampton Department of Public Works (DPW) or its authorized representative
shall be provided access to the property to conduct inspections before, during, and after
construction activities as necessary. The applicant shall arrange with the DPW to schedule
the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection,
and Final Inspection. The DPW may also conduct random inspections to ensure effective
control of erosion and sedimentation during all phases of construction.
3. At the completion of the work, including construction of stormwater management
facilities and landscaping, the applicant shall submit a statement to the DPW from a
professional engineer of record in the Commonwealth of Massachusetts certifying that the
materials and construction of the stormwater management system was constructed in
accordance with the approved plans and will function as designed. All changes to the
approved stormwater facilities shall be documented by a professional engineer of record in
the Commonwealth of Massachusetts and approved by the DPW prior to submission of the
certification statement described above.
4. Annual Reports that are stamped by a Registered Professional Engineer documenting the
actions completed as required by the Operation, Maintenance and Inspection Agreement shall
be submitted to the Northampton Department of Public Works by October 1 of each year.
5. If construction of the proposed stormwater system has not started within five years of the
issue date of this permit, then the permit will expire and a new permit will be required.
Construction is defined as clearing, grading, excavation, filling, and installation of drainage
structures on the lots specified in this permit.
Specific Permit Conditions:
1. Prior to completion of construction, the applicant shall record an executed Stormwater
Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners
of land served by the private stormwater management facility by recording it in the land
records of the Registry of Deeds. This agreement shall be approved by the Northampton
DPW and signed by the owner and the Mayor of Northampton. Section 22 -85 of the
Northampton Stormwater Management Ordinance provides additional guidance for the
requirements of this agreement.
2. This project will be required to submit one or more Notice of Intent (NOI) to the U.S.
EPA for coverage under the NPDES Stormwater Construction General Permit. A copy of the
\ \Eng \engineering \Stormwater Permits \Permits Active \Damon Road \080 Damon Rd River Run Condos.doc
Page 2of3
r
Ma T
�� STORMWAER MANAGEMENT PERMIT
y APPLICATION DECISION
City of Northampton
Department of Public Works
1:
Project / Site Name: River Run Condominiums
Project Street or Location / I 1 d q,� :` ' :g
/ x� * rs�r��'�'�i 1Vortham �tl,�s�',�.i..,+s i.. '�' t , ;
Applicant Name: Tony Martins
Applicant Address /Phone: 679 Moore Street, Ludlow, MA / 413 - 283 -9630
Owner Name / Address: Stephen Henderson, Classic Management / 80 Damon Rd. #1, 585 -9745
Application Submission Date: 7/28/2009
THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC
WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION
PRESENTED:
Disapproval of the Stormwater Management Permit Application based on a
determination within seven days of the receipt of the application that the
application is administratively incomplete (see attached documentation).
Approval of the Stormwater Management Permit Application.
X Approval of the Stormwater Management Permit Application subject to any
conditions, modifications or restrictions required by the Department of
Public Works (see below)
Disapproval of the Stormwater Management Permit Application based upon
a determination that the proposed plan, as submitted, does not meet the
purposes set forth in the Northampton Stormwater Management.
Standard Permit Conditions:
1. All clearing, grading, drainage, construction, and development shall be conducted in
strict accordance with the following plans and information submitted with the application and
as amended by any conditions attached to this permit:
a. River Run Condominiums, Proposed Infrastructure Improvements, Notice of
Intent Plan, SK -1, dated 4/17/2009, prepared by Stantec Consulting Services, Inc.
b. River Run Condominiums, Stormwater Management For New Parking Area,
Figure 1.0, dated 8/4/ 2009, stamped by Aharon Sharff, P.E., Stantec Consulting
Services, Inc.
\ \Eng \engineering \Stormwater Permits \Permits_Active \Damon Road \080 Damon Rd_River Run Condos.doc
Page 1 of 3