Loading...
17D-012 (29) b. Stormwater Management Plan, Meadowbrook Apartments, 491 Bridge Rd., Northampton, MA, dated December 12, 2005, prepared by the Berkshire Design Group. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. Annual Reports that are stamped by a Registered Professional Engineer documenting the actions completed as required by the Operation, Maintenance and Inspection Agreement shall be submitted to the Northampton Department of Public Works by October 1s of each year. Specific Permit Conditions: 1. The applicant shall record an executed Stormwater Operation, Maintenance, and Inspection Agreement that is binding on all subsequent owners of land served by the private stormwater management facility by recording it in the land records of the Registry of Deeds. This agreement shall be signed by the owner and approved by the Northampton DPW. Section 22 -85 of the Northampton Stormwater Management Ordinance provides additional guidance for the requirements of this agreement. Signature of Cit Engineer Date cc. Planning Board c/o Office of Planning and Development I3uilding Department Conservation Commission c/o Office of Planning and Development E:AStonnwater Pennits \Stonnwater Pennits \Pennits_new applications \0491 Bridge Rd \0491 Bridge Rd.doc Page 2of2 4 a �NnMp TO � i STORMWATER MANAGEMENT PERMIT 1t- 1 3r1i� \'�• APPLICATION DECISION City of Northampton Department of Public Works I n fsf ' " " ^ _ Project / Site Name: Meadowbrook Apartments Project Street or Location / Assessor ID: 491 Bridge Road / Assessor Map 17D, Parcel 12 Applicant Name: Preservation of Affordable Housing Applicant Address /Phone: 40 Court Square, Suite 650, Boston, MA 02108 / 617- 261 -9898 Application Submission Date: 12/15/2005 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, drainage, construction, and development shall be conducted in strict accordance with the following plans and information submitted with the application and as amended by any conditions attached to this permit: a. Existing Conditions and Paving and Site Improvements Plans (Sheets 1 -4), Meadowbrook Apartments, Bridge Road, Northampton, Massachusetts, dated December 5, 2005 by Berkshire Design Group. E:AStormwater Permits \Stornwater Pennits \Permits_ new applications \0491 Bridge Rd \0491 Bridge Rd.doc Page 1 of 2