Loading...
17C-167 (3) ----------"--- ../- ‘› \ >, / / 4. , , , ,,,,„ \ 5 , ,,, , , ,, ,,„ ,, i r„, , , o ..,,Ei..4.i 4 _. •• I"S Al8538L1FASttf3 5:),i,gra 'it at DEPARTMENT OF BUILDING INSPECTIONS K 212 Main Street • Municipal Building '` a INSPECTOR ,� s�• Northampton, MA 01060 LOCATION y 11 1 y 4 I f SQUARE FOOTAGE AMOUNT BASEMENT @ : 20 ` l. i 1 - 1 ST FLOOR @.50 f• 7 C q,j , 2 FLR @ 30 • , C 7 ( - )-v ci FLOORS, FINISH ATTIC, GARAGE @ .20 DECK/PORCHES @ . 20 ft Gl 3 TOTAL. 6-2).P fi r Compliance Certificate Energy Code: 2006 IECC Location: Northampton, Massachusetts Construction Type: Single Family Building Orientation: Bldg. orientation unspecified Conditioned Floor Area: 1352 ft2 Glazing Area Percentage: 10% Heating Degree Days: 6404 Climate Zone: 5 Construction Site: Owner /Agent: Designer /Contractor: 44 High St Florence, MA 01062 Compliance: 9.4% Better Than Code Maximum UA: 245 Your UA: 222 Ceiling 1: Flat Ceiling or Scissor Truss 676 38.0 18.0 13 Wall 1: Wood Frame, 16" o.c. 1664 19.0 0.0 88 Orientation: Unspecified Window 1: Vinyl Frame:Double Pane with Low -E 165 0.310 51 SHGC: 0.31 Orientation: Unspecified Door 1: Solid 40 0.310 12 Orientation: Unspecified Floor 1: All -Wood Joist/Truss:Over Unconditioned Space 676 30.0 0.0 22 Basement Wall 1: Solid Concrete or Masonry 730 11.0 5.0 36 Orientation: Unspecified Wall height: 7.0' Depth below grade: 6.0' Insulation depth: 7.0' Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2006 IECC requirements in RESche Versio 4.2.0 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. 7 X/ . 1 Name Titl Sig ture Date Project Title: Report date: 09/15/09 Data filename: C: \Program Files \Check \REScheck \high st.rck Page 1 of 1 , MUNICIPAL SEWER! AVAILABILITY APPLICATION Northampton Streets Department 125 Locust Street Northampton, MA 01060 587 -1570 A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. Location: Litt (4( Si: Lot 2 High Street, Northampton inquiry Made By: Jim Harrity 210 -5256 Date of Inquiry: 4128/09 Reason for New Building Request: Municipal Sewer Main in Front of Location: Yes No Municipal Storm Drain Available: 5' /z deep Yes No X Size of Sewer Main: C � Material: C LA 7 Age: / `7o 7 r7 Depth of Sewer Main: Size of Service Connection: NKlVc .,.j /1/ Type of Service Connection: Tie -in to Sanitary Main Tie -in to Sanitary Stub X Comments: Note: If this availibiiity is for new construction, this form must be hand delivered to Mau Inspector. A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Streets Department with a minimum of 5 working days notification. Al! work shall conform to Northampton Streets Department specifications. .�. a a ohn a I -- Sewer Department cc: Ned Huntley, Director DPW Anthony Patillo, Building Inspector . MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department 237 Prospect St, Northampton, MA 01060 587.1097 A Department of Public Works Trench Permit shall be required prior to any construction or connection activity associated with this application. Location: j4 L t.h.# 5L .. Lot 2 High Street, Northampton Inquiry Made By: Jim Harrity 210-5256 Date of Inquiry: 4/28/09 Number of Type of Single Family X Type of Private X Units: 1 Unit(s): Accessory Apart. Ownership: c multi-wa Rental 4 4 MIIIMIMOMINIMIII•■11111•111111/ 41111•111111■1111 Municipal Water Main in Existing service to Front of Location? Yes: X No site/ Yes: No X Size of Water Main: Material: Cast bon Age: 1927 .Approximate Static Street How Test Conducted: Yes: No: X Pressure: 80 If done attach results Size of Service Connection 1" Suggested Meter Sin: 5/8" --- Comments: The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320 feet. Contractor to install new service line from street • A corresponding water entrance fee shall be paid prior to making any connection to the municipal water SV • ts such fit ati shall be made with the Noliainpton Water Department with a minimum of 5 w days • %Tot • .0 Tr.. .1 •P. 1. 1.r ton Water Ikpattnatt specification.s. David W. Sparks, Superintendent of Water Water Erttry$ 200 Meter$ 100 Radio $ 100 cc: Ned Huntley, Director cc: Tony Patillo, Building Inspector kistsi jikalis ilUtkconstruction, it mustbe t_iitsteivered to the Boildin2 Inspector, , 1111111111111111r Aormansimmorroommorti1 Permit No. D16-09 CITY OF NORTHAMPTON, MA DRIVEWAY PERMIT Date: 4/28/09 Check 0: 1003 FEE: S250.00 THE BOARD OF PUBLIC WORKS Drivewa num ber posted The undersigned respectfully petitions your honorable body for: Permission to install a driveway at: Lot 2 #44 High Street, Northampton Fifteen (15) foot maximum width at the street line. Gutter drainage not to be disturbed,All_ Drainage shall be directed off the driveway surface to adjacent land and not on the existing_ Roadway. Driveway surface to be paved as soon as possible if the grade of the proposed Driveway exceeds 3% or more. Homeowners will be held responsible for any cost to the City Of Northampton in the event of a washout of this driveway. By Jim Harrity Telephone: 413-210-5256 Signature: Proposed Location Inspection By: 4,411/4 6, iL3 i____ • Gravel Base Grade Inspected By: Final Approval: THE BOARD OF PUBLIC WORKS voted that petition be granted. Edward S. Huntley, P.E. Director of Public Works Cc: Building Inspector (SUBJECT TO ATTACHED CONDITION 1 & 2) I," • • masumummirmoor lommin•K} 44 HIGH ST - LOT 2 BP-2009-1066 Gis COMMONWEALTH OF MASSACHUSETTS Mld.p 17C - 167 CITY OF NORTHAMPTON -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Lerrn:BuHduig DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category.: New Single Family House B PERMIT P■:!mut # _13P-2009-106 Project # jS-2009-001407 Est. Cost: $10000,00 Fee:1135.20 PERMISSION IS HEREBY GRANTED TO: Cpc,st..class:, Contrac(or: License: Use Group: JAMES HARRITY 052260 L9tsizr(sq Owner: CURELLO MARARET & ED Zoinag URBi I QQ.// Applicant: James Harri :C.° 44HOkT-CT2 Applicant Address; Phone: Insurance: 515 KennedyRoaci 14.13) 585-8025 LEEDSMA01053 ISSUED ON:8/27/2009 0:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT 26 X 26 SFH 2 STORY RESIDENCE (FOUNDATION ONLY) POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector 1 ruderground: Service: Meter: Footings: Rough: Rough: House # Foundation:efiC ?- Drive lv ay Final: Final: Rough Frame: Gas: fire Department Fireplace/Chimney: Rougn: jj Insulation! Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. — Certificate pf Signature: _Occuoncy _ FeeType: Date Paid: Amount: 8/27'2009 0:00:00 S1 35 212 Min Street, Phone (413) 587-1240, Fax: (413) 587-1272 Bollding Commissioner - Anthony Paiillo , . Planning - Decision City of Northampton Hearing No.: PLN- 2010 -0003 Date: August 19, 2009 MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: Kenneth Jodrie Francis Johnson 8 - - Approved with Conditions MINUTES OF MEETING: Available in the Office of Planning & Development. 1, Carolyn Misch, as agent to the Planning Board, certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been filed with the Board and the: City Clerk on -the date shown above. 1 certify that a copy If this decision has been mailed to the Owner and Applicant. Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt. 40A, Section 17 as amended within twenty (20) days after the date of the filing of the notice of the decision with the City Clerk. The date is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of Northampton. VCEOWED AUG 1 9 2009 CITY CLERKS OFFICE NORTHAMPTON, MA 01060 September 9, 2009 I, Wendy Mazza, CityClerk of the City of Northampton, hereby certify that the above Decision of the Northampton Planning Board was filed in the Office of the City Clerk on August 19, 2009, that twenty days have elapsed since such filing and that no appeal has been filed in this matter. Attest: C 7 CIL-..■ ity Clerr u ,.) City of Northampton ATTEST: HAMPSHIRE, Ala Lvty+ oZ . MARIANNE L. DON.OHUE • GeoTMS® 2009 Des Lauriers Municipal Solutions, Inc. r Planning - Decision City of Northampton II I III II 1111 II 11111111111111 2009 00023003 Hearing No.: PLN- 2010 -0003 Date: August 19, 2009 Bk: 9966Pg: 212 Page: 1 of 2 Recorded: 09/16/2009 09:27 AM APPLICATION TYPE: SUBMISSION DATE: Amendment to Permit 7/21/2009 Applicant's Name: Owner's Name: NAME: NAME: CURELLO MARGARET GOSS LEE W ADDRESS: ADDRESS: 44 High St. P O BOX 60599 TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: FLORENCE MA J 01062 FLORENCE MA 01062 PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: (413) 348 -8431 0 EMAIL ADDRESS: EMAIL ADDRESS: Site Information: Surveyor's Name: STREET NO.: SITE ZONING: -.. - -- COMPANY NAME: 42 HIGH ST URB(100)/ TOWN: ACTION TAKEN: ADDRESS: FLORENCE MA 01062 Approved With Conditions MAP: BLOCK: LOT: MAP DATE: SECTION OF BYLAW: 17C 167 _ 001 Chpt. 350 -10.1: Special Permit TOWN: STATE: ZIP CODE: Book: Page: 8442 291 PHONE NO.: FAX NO.: EMAIL ADDRESS: NATURE OF PROPOSED WORK: - - - - Amend PB special permit and site plan to change house plans only. HARDSHIP: CONDITION OF APPROVAL: 1) All conditions from the original permit plus the first amendment shall stand. Condition #2 from the original permit shall be modified as follows: Any garage, either detached or attached, shall be located behind the single family house and not visible from the street. FINDINGS: The Board voted to approve the request for amendment related to the design of the home based on the plans submitted. The Board emphasised that because the final plans showed a greater setback than originally reviewed by the Board that one of the original conditions apporved be modified to ensure that no detached structure be allowed in front of the principal structure. COULD NOT DEROGATE BECAUSE • FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 7/23/2009 8/6/2009 8/13/2009 REFERRALS IN DATE. HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 7/30/2009 9/24/2009 8/13/2009 8/27/2009 9/8/2009 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 7/30/2009 8/13/2009 8/13/2009 8/19/2009 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: .. DECISION DEADLINE: 8/6/2009 7:00 PM 11/11/2009 8/27/2009 MEMBERS PRESENT: VOTE: Marilyn Richards votes to Grant Katharine G. Baker votes to Grant Stephen Gilson votes to Grant Jennifer Dieringer votes to Grant Mark Sullivan votes to Grant Francis Johnson votes to Grant George Kohout votes to Grant Kenneth Jodrie votes to Grant GeoTMS® 2009 Des Lauriers Municipal Solutions, Inc. City of r B uild in �t on f P' +maen v 9 �epartmen Statu at e�if Depa �. eanr 12 Main Street c ,�. ROprn 100 5e' rye►GAua�iafi�t N MA 01060 Wald,- � V4 Mbbrl � phone 413 - 1= 58 7 -1 Fax Y ax 41 58 -1272 P)otJSitE l s APPLICATION TO CO Oierpeciy� NSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A O NE O TWO FAMILY D WELLING SECTION 1 • SITE INFORMATION 1.1 Pro ert Address: This section to be completed by office / f- J ki i 1 S.? i 6 2009 Map -- Lot Unit s r ! .Zon 1 ' Overlay District , ' - ~ Elpl Sl i1istnct u CB District SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT 2.1 Owner of Record: 1 - A f` . e L`. O ,y ' s ( s f7 m e (Print) Current Ma iling A dC ress: Z4 1z/1, e/l'd--- Telephone 2.2 Authorized Agent: Name (P . t) Current Mailing Address: / ,- 4°1---- Signatur Telephone 1 SECTION 3 - ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollars) to be Official Use Only completed by permit applicant 1. Building (a) Building Permit Fee 2. Electrical (b) Estimated' T otal! Cost of - ' % t i r J Construction from (6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) ' ../ / 5. Fire Protection ! •_? ,3 1 a,3 ) 6. Total = (1 + 2 + 3 + 4 + 5) Check Number / !0 This Section For Official Use Only Building Permit Number: Date issued: • Signature: Building Commissioner /Inspector of Buildings Date 1 Informat D enied Due 10 Income lete it Can Be Z oning Be Comp leted • Perm Requ y e {tiled m by anon Must Prop psed Th c olumn to b ent to inform ttt" ZONING Building D� a Section 4 V Lot Size _ Frontage Setbacks Front Side _ Rear .�`- ..,�;' „I G� C� 1 ` _� Building Height 1111111111111111111 Bldg. Square Footage /o Open Space Footage % _ ____ , „� (Lot area minus bldg & paved r /2; 4 parking) # of Parking Spaces Fill: (volume & Location) M.._, . A. Has a Special Permit /Variance /Finding ever been issued for /on the site? NO 0 DONT KNOW 0 YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES IF YES: enter Book Page and /or Document # B. Does the site contain a brook, body of water or wetlands? NO * DONT KNOW C YES 0 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained , Date Issued: C. Do any signs exist on the property? YES (NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES 0 NO 4 IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO s) IF YES, then a Northampton Storm Water Management Permit from the DPW is required. � 1 04����s1 s t* �g� � � etti`7 es te • , '° \N es�$40 o fie o blos� 9 Joe°° $ i 6.e' '� °,° S ,?$,..1> seems a�e� x‘o e e�' $ '�s�'` �° $ ,'e s� see ,a,,,,- a ' e , 2 s , p � al \ohs o Coe sS � ,1 de r *") ° a' G �c e ,s e s a �,e se s e ,� , �s � ,� e � e b� s S a o s ,s e b`} • be 6. O a s' ° iS . �sS �G e �O `� e � 4'� °�.�,1��` �,��,. �e4 e �4 {r� es, o o's o s'� °�' � �' x` eo �, 4 ' e,i? o t e S I N. , 's., e es " e os is o s e r ., d " v2` e b`}1 eo � o e � X 5% f c. `S )'6' Oti �4� e b "S G i b a \,pP cool e# i # o o � ° t+ v .0 °, o S N14 o ff' a' s O S's�fi� s'sb � ekoi hest or t �s `ecie � ot�` � e �� e eti� �, e s. es' .�Q�, o� e l �j - X 0 6 e � ' s e ge e �� %V d�'`' O a � y ss ' �� i e s Q sac CP b ilea e s s ot d o �� 4 NO' 0 4 � `� 6 e '� e o a .:9 .4.10 ., eg fi o 010, � c ' e 's eN . �,a 11 bs'O ,es . e' e° x ti y e s, ,�< �� e ... {e s e 1ep S . be ���, , .o fl se el, o . � o . o � Ms ° c,',..`070 ' o o• e „Nip e s � , ,A � °s� � s g a�' . 's.''' es;',"'. 4 g.' e co { i s` s �be s � )" . o ff ' a s ' e � fl a et a r o �. o �p o� e es , ksb X e 44 S VI �t� S OS d es � ea'�� mo o{ �,. so 4e ,�t� . � She � ' � i eo NO' o ` ' �'� Oti ps c e ese ae s es s` N s o .0 t ' a : e ee,10 dos s ,da `" �S S� 0 p+ <,,,,N, � 1b1{etb�44 ot� y e s vs X5 4 0 e b\) 1 , �� Cr 0 45 Se ti > i�e 0 ,1 �ti 5� &;4\ AO \ 0 140 .. � 3 a � \ 0 . e a t' .\ 14 0 1 ' soefl \�,Se �,et j em lose" a col ,00. P rev- - ma e L __POSED WORK check all a licable Replacement Windows Alteration {s) " rs 0 [� Roofing Decks [q Siding [pl Other [pa .9' 2 i Pjl7 9 1.44,�laA* �0041_, sa �� n tr ga oj1 30d xroM oOj��9 j S sit �° Ss� -ippv Q �� �hh a crlplin ��,� S .t a 4t ax h�ax a>u a • �"��S S ��R pains o� I�p I i � 1 File # BP- 2010 -0294 APPLICANT /CONTACT PERSON JAMES HARRITY ADDRESS /PHONE 515 KENNEDY RD LEEDS (413) 210 -5256 O PROPERTY LOCATION 44 HIGH ST - LOT 2 MAP 17C PARCEL 167 001 ZONE URB(1001/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Paid /13� `J 9 , Typeof Construction: CONSTRUCT 26 X 26 2 STORY SFH W/PORCH New Construction Non Structural interior renovations Addition to Existing_ Accessory Structure Building Plans Included: Owner/ Statement or License 052260 3 sets of Plans / Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF ATION PRESENTED: Approved Additional permits required (see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND /OR Special Permit With Site Plan Major Project: Site Plan AND /OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* _ Received & Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission - Permit DPW Storm Water Management Demolition Delay /di/ " 249 ? Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning & Development for more information. i , t f HIGH ST - LOT 2 BP-2010-0294 s #: COMMONWEALTH OF MASSACHUSETTS .ap:Biock: re CITY OF NORTHAMPTON ot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS emit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Tategory: New Single Family House BUILDING PERMIT • Permit # B P -2010 -0294 Project # JS- 2009 - 001407 Est. Cost: $135000.00 Fee: $572.80 PERMISSION IS HEREBY GRANTED TO: Const. Class: 5B Contractor: License: Use Group: R4 JAMES HARRITY 052260 Lot Size(sq. ft.): 31798.80 Owner: CURELLO MARARET & ED Zoning: URB(100)/ Applicant: JAMES HARRITY AT: 44 HIGH ST - LOT 2 Applicant Address: Phone: Insurance: 515 KENNEDY RD (413) 210 -5256 0 LEEDSMA01053 ISSUED ON:10/14/2009 0:00:00 TO PERFORM THE FOLLOWING WORK :CONSTRUCT 26 X 26 2 STORY SFH W /PORCH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 10/14/2009 0:00:00 $572.80 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Building Commissioner - Anthony Patillo UGH ST - LOT 2 BP -2010 -0294 #: COMMONWEALTH OF MASSACHUSETTS ip:Block: 17C -167 CITY OF NORTHAMPTON )t: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS �rmit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) 2ategory: New Single Family House BUILDING PERMIT Permit # BP- 2010 -0294 Project # JS -2009- 001407 Est. Cost: $135000,00 Fee: $572.80 PERMISSION IS HEREBY GRANTED TO: Const. Class: 5B Contractor: License: Use Group: R4 JAMES HARRITY 052260 Lot Size(sq. ft.): 31798.80 Owner: CU.ELLO MARARET & ED zoning: URB(100)/ Applicant: JAMES HARRITY AT: 44 HIGH ST - LOT2 Applicant Phone: Insurance: 515 KENNEDY RD (413) 210 - 5256 0 LEEDSMA01053 ISSUED ON :10/14/2009 0 :00 :00 TO PERFORM THE FOLLOWING WORK :CONSTRUCT 26 X 26 2 STORY SFH W /PORCH POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: / 8b. ' ° ,-1 Meter: Footings: Rough :ib-- , "'O? , Rough: /o/Z2. 3lti 9 House # Foundation: of, 5 ^� (�' � M Driveway Final: i 1 Final: 1 - -1 ?—G Final: Rough Frame: © 4 )1 Gas: Fire Department '901- 7. 0 Fireplace /Chimney: Rough://. .2 , 1: Insulation: arc / 40 74 17 -G )1'. , CO Final: ! ° I - 07 / � Smoke: 6 6.47 , Final: k rr� q THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULE AND REGULATIONS. 124'43109 Certificate of Occupancy, ( Signature: FeeType: Date Paid: Amount: Building 10/14/2009 0:00:00 8572.80 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Building Commissioner - Anthony Patillo