Loading...
17A-058 (2) RECEIVED ARCHITECT OCT 242011 J E F F R E Y S C O T T P E N N 77 Worthington Road, Huntington, MA 01050 tel. 413-667-5230 fax. 413- 667 -3082 � � jspsed('a�,verizon.net ....w .-t., _ 01080 24 October 2011 Report of completion Client: Village Day Spa 213 Main Street Northampton, MA Louis Hasbrouck, Building Commissioner Northampton City Hall 212 Main Street Northampton, MA 01060 Dear Mr. Hasbrouk: I have continued to visit the site of 213 Main each week and I am satisfied with the progress. The installations appear professional and compliant. The final result is a safe and attractive addition to vibrant Main Street. I observed the installed mineral wool which firestops the upper wall cavity in the first floor bathroom as noted missing in report #1. The rooms in the basement approximate the same configuration shown on plans but with slightly altered dimensions. Sincerely, . &,g.Y S. ' O F ��' c..7(tt j effrey Scott Penn, Arc 1 ■ f f Commonwealth of Massachusetts County of /i i /"..e. On this aY day of 20 before me, the undersigned notary public, personally appeared Xe Sc.c14- 14,n (name of document signer), proved to me through satisfactory evidence of identification, which were M(4s5 - Dri utis LtCo,�t,... , to be the person who signed the preceding or attached document in my presence, and who swore or affirmed to me that the , contents of the document are truthful and accurate to the best of (his) (h) knowledge PATRICIA y O'VALLI and beli-•' , , NOTARY PUB IC 1 o fficial signature and seal of notary 7 I � COMMO�IVJEALOE1 Or °, t;HUSETTS °.4 My Commission xpir - 7 2015