MID Construction Performance Testing Documentation
Date of Test 10/5/11
Builder /Homeowner JJK & Son Services LLC
Address 270 Pleasant St
Test completed by Bill Lafley
Test Information
Conditioned Floor Area 2046 sq ft Number of Stories 1
Duct System 1 Duct System 2 (if installed)
Air Handler Installed? Y Air Handler Installed? 0
Duct Flow in CFM25 119 Duct Flow in CFM25 0
Pass or Fail? P Pass or Fail? 0
RESULTS of Rough -In Duct Leakage Test
Rough In Total Leaka a Test at 25 Pascals
Total Leakage Test 5.821CFM per 100 sq ft of conditioned floor area
Notes on Area Tested and /or Testing Conditions:
Could not run blower door - history of steam /asbestos in building
2009 IECC Minimum Requirements
Rough In Test with Air Handler Installed < 6 CFM per 100 sq ft of conditioned floor area
Rough In Test with NO Air Handler Installed < 4 CFM per 100 sq ft of conditioned floor area