Loading...
32C-172 LI:I FOR U EcoTechnology we make green make sense MID Construction Performance Testing Documentation Date of Test 10/5/11 Builder /Homeowner JJK & Son Services LLC Address 270 Pleasant St Test completed by Bill Lafley Test Information Conditioned Floor Area 2046 sq ft Number of Stories 1 Duct System 1 Duct System 2 (if installed) Air Handler Installed? Y Air Handler Installed? 0 Duct Flow in CFM25 119 Duct Flow in CFM25 0 Pass or Fail? P Pass or Fail? 0 RESULTS of Rough -In Duct Leakage Test Rough In Total Leaka a Test at 25 Pascals Total Leakage Test 5.821CFM per 100 sq ft of conditioned floor area Notes on Area Tested and /or Testing Conditions: Could not run blower door - history of steam /asbestos in building 2009 IECC Minimum Requirements Rough In Test with Air Handler Installed < 6 CFM per 100 sq ft of conditioned floor area Rough In Test with NO Air Handler Installed < 4 CFM per 100 sq ft of conditioned floor area Questions about this Report? Contact Megan McDonough - Phone: 413 - 586 -7350 x221 - E -Mail: MeganM @cetonline.org