24B-066 („1".:\i' ED 0 AUG 16 2011 DEPT. OF BUILDING INSPECTIONS NORTHAMPT PIERRE A. BELHUMEUR AIA • ARCHITEC1 101 Lovers Lane • P.O. Box 468 • Greenfield, MA 01302 413 - 774 -2248 Fax 413-774-2249 12 August 2011 Charles Miller, Assistant Building Commissioner Department of Building Inspections 212 Main Street, Municipal Building Northampton, MA 01060 Re: Potpourri Plaza, 241 -243 King Street, Northampton, MA 01060 Second Floor Office interior alteration Construction progress report Dear Inspector Miller: I visited the above workspace this morning: the location into which Lane Construction is to expand its existing adjoining office suite, and I conclude that work there is complete at this time. All the room finishes are in place, as are all utility and life safety system adjustments. The latter includes exit signage and emergency exit lighting. Everything has been completed as I depicted on my Schematic Interior Partition Layout Plan Drawing A -1 (dated 9 May 2011), with the sole exception being the removal of two back -to -back closets just north of the kitchenette. The removal of those two closets is shown below in my partial plan drawing and that closet removal, in my opinion, smoothes out the flow of pedestrian traffic within the suite expansion. From all of my field observations, and to the best of my knowledge, the work of this project is therefore complete and conforms to the requirements of Massachusetts Building Code 780 CMR Eighth Edition. Please be in touch if you have any questions with regard to this project. Thank you. Ki egards, U :) „r • . P rre A. Beihum -ur AIA Copy: Edmond DiLorentis, owner Richard Lavalley, Managing Agent Note: distribution to all parties via e-mail, and to Charles Miller via USPS as well. i f qr t r w t... A , s.,. `� e - 1-1. \ 1 }-- -Z f ,;S A K /j. ,..