Loading...
Addendum 320110715 CURTIS A. EDGIN, A.I.A., N.C.A.R.B. JAMES M. HANIFAN, A.I.A., N.C.A.R.B. KENNETH R. JODRIE, A.I.A. CAOLO & BIENIEK ASSOCIATES , INC. A R C H I T E C T U R E · P L A N N I N G · I N T E R I O R D E S I G N 521 East Street · Chicopee, Massachusetts 01020-4161 · (413) 594-2800 · Fax (413) 594-2900 · info@cbaarchitects.net NORTHAMPTON POLICE HEADQUARTERS Northampton, MA Addendum No. 3 May 24, 2011 This addendum is issued for the purpose of amending the requirements of the contract documents and is hereby made a part of the contract drawings and specifications to the same extent as though it were fully incorporated therein. This addendum consists of two (2) pages, including this page. There are no attachments for a total of (2) pages. GENERAL: Item No. 1: New Bid Date: The bid date for all bids will be changed to Friday, May 27, 2011 at 10:00 am at the City of Northampton Central Services. The bids will be publicly opened on Friday, May 27, 2011 at 1:30 pm at the Senior Center. Item No. 2: Clarification: Underslab drainage and foundation drainage for the new building shall be provided by the Site work contractor. Item No. 3: Clarification: Excavation and backfill for underground work shall be provided by the Sitework contractor. Item No. 4: Clarification: Penetration firestopping shall be provided by Construction Manager through a non-trade contractor. The HVAC, Plumbing, Fire Protection and Electrical contractors are not responsible for penetration firestopping of their work. SPECIFICATIONS: Item No. 5: Supplemental Requirements 010000; Delete: Any items requiring alternates. Alternates are not required for Trade Contractor bids. Item No. 6: Penetration Firestopping 078413, 1.2 Description of Work E.; Delete: 3. Section 210001 Fire Suppression 4. Section 220001 Plumbing 5. Section 230001 Heating, Ventilating and Air Conditioning 6. Section 260001 Electrical Item No. 7: Penetration Firestopping 078446 1.2 Description of Work E.; Delete: 3. Division 21 Fire Suppression 4. Section 220001 Plumbing 5. Section 230001 Heating, Ventilating and Air Conditioning 6. Section 260001 Electrical Addendum No. 1 Page 2 of 2 Item No. 8: Tiling 093000: 2.2 PRODUCTS, GENERAL, I; Add: Water-Cleanable, Tile Setting Epoxy Adhesive: A. Kerapoxy by Mapei or other approved equal. Item No. 9: Section 280000 Security and Communication Systems(issued in addendum #3) Replace: Throughout the Security and Communication Systems Specification 280000 replace reference to “ Systems Integrator” to “Security System and Communication System sub-sub contractor or contractors” Item No. 10: Section 280000 Security and Communication Systems(issued in addendum #3), Section 1.8 Submittals Delete: Item F. Item No. 11: Section 280000 Security and Communication Systems(issued in addendum #3), Section 1.9 Qualifications Delete: Item A. Add: The electrical contractor may include separate sub-sub contractors to complete the work specified for the Security system and Communication System. It is the Electrical Contractor’s responsibility to coordinate the scope of work for the Security System and Communication System sub-sub contractor contractor or contractors in bidding and in all aspects of the work. The electrical contractor shall list the sub-sub contractor or contractors on the Prequalified trade contractor Bid Form as indicated in Addendum #2. Replace: In Item D, replace reference to a “single firm/company” to “Security System and Communication System sub-sub contractor or contractors” DRAWINGS: Item No. 12: Drawing L-2,Layout Plan Change: The new transformer shall be 10’ 0” clear from the northeast corner of Stair B. Change the 5’ 10” dimension to 10’ 0”. Item No. 13: Drawing L-2,Layout Plan Add: Four steel bollards around the transformer. One bollard shall be provided and installed at each corner of the transformer pad. The final location of the bollards shall be coordinated with the electrical contractor & the door openings of the transformer. The steel bollards shall be as shown in detail 12 on L-4 and shall be painted. Item No. 14: Drawing A-701 ,Room Finish Schedule & Floor Pattern Dtls: Clarification: See Floor Pattern Layout 1 and 2 for patterns. Color #1 and #2 refer to solid colors, refer to 4/A701 for strip detail dimensioned on the plans at 9-3/4”. Clarification: Three styles of Carpet max. at locations to be determined. Revise: Carpet S-5 to read S-3 Carpet S-4 to read S-2. END OF ADDENDUM #3