Loading...
24D-204 224 STATE ST BP- 2012 -0065 GIs #: COMMONWEALTH OF MASSACHUSETTS Map:Bloc 24D - 204 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Buildinq DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Categor BUILDING PERMIT Permit # BP-2012-0065 Project # JS- 2012 - 000096 Est. Cost: $1000.00 Fee: $50.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: JOSEPH SEITZ Lot Size(sq. ft.): 3789.72 Owner: Kass Fred Zoning: URC(100)/ Applicant: JOSEPH SEITZ AT. 224 STATE ST Applicant Address: Phone: Insurance: 196 LINE ST (413) 687 -1227 EASTHAMPTONMA01027 ISSUED ON: 7119120110:00:00 TO PERFORM THE FOLLOWING WORK.- Deck POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House # Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace /Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Sienature: FeeType: Date Paid: Amount: Building 7/19/20110:00:00 $50.00 212 Main Street, Phone (413) 587 -1240, Fax: (413) 587 -1272 Louis Hasbrouck — Building Commissioner O L ` v. L City c f Northampton ildi ig Department ` 212 Main Street . oom 100 52(111 ; No ha pton, MA 01060 .oR oars 87- 240 Fax 413- 587 -1272 ; oN MA 01050 APPLICATION TO CONSTRUCT, ALTER, REPAIR, RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 - SITE INFORMATION 1.1 Property Address Thissection to be completed'by office z y� Map Lot Unit �+ Zar'!e � Overlayprstnct EIniYSt bi §t lie t CB District SECTION 2 - PROPERTY OWNERSHIP /AUTHORIZED AGENT 2.1 Owner of Rec Name ¢ t Current Mailing Address: Telephone Signatu 2.2 Authorized Agent: Name (Print) Current Mailing Address: Signatu Telephone SECTION 3 - ESTIMATED CONSTRUCTION COSTS Item Estimated Cost (Dollars) to be Official Use Only completed by ermit applicant 1. Building (a) Building Permit Fee Do 2. Electrical M Estimated Total Costof Construction from 6 3. Plumbing BuildingPermlt Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total = (1 + 2 + 3 + 4 + 5) 100(5 Check Number This.Section For Official Use Onl Date Building iPermit Number: Issued: Signature: Building Commissioner /Inspector:of Buildings Date 4 k Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be ,f (IV Building Departmdtit w. ' Lot Size r I 5 N 4 7 ! i H. _A Frontage I Setbacks Fron Side L: _._...._i R: �..__I L: =..=. = ._._ ' = R: Rear Building Height Bldg. Square Footage _i % -Open Space Footage % - -.- (Lot area minus bldg & paved p arkin g) # of Parking Spaces Fill: .,.� . �. �._V...�._.�.......W..�.. _�.. 7! volume & Location) A. Has a Special Permit /Variance /Finding P been issued for /on the site? NO 0 DONT KNOW YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES 0 IF YES: enter Boo I Pager Document # H B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW Q YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued y C. Do any signs exist on the property? YES 0 NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property ? YES Q NO e IF YES, describe size, type and location: E. Will the construction activity disturb (clearing, grading, exc ation, or filling) over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5- DESCRIPTION OF PROPOSED WORK (check all applicable) 71 a Y New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roofing ❑ Or Doors ❑ Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [❑ Siding [0] Other Brief Description of Proposed � V¢S Work: Gtr l � r �-o ae IF Alteration of existing bedroom Yes ✓ No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes _No Plans Attached Roll - Sheet a. Use of building : One Family Two Family r Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. WilFbuilding conform to the Building and Zoning regulations? Yes NO. I. Septic Tank City Sewer Private well City water Supply SECTION 7a - OWNER AUTHORIZATION TO BE COMPLETED! WHEN OWNERS AGENT OR CONTRACT OR APPLIES FOR E3tJ:ILDINGPERMI f I, ' ' uI 1`cl'S as Owner of the subject property t� hereby authorize 3 e J e ° to act on my behalf, in all matters relative to work authorized by this building permit application. Signature f ner Dat 7 . as Owner /Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed �the and pe nalties of erjury. Fnnt_!TaAhe Signature of Owner /Agent Dat SECTION 8 - CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor Not Applicable ❑ r Name of License Holder _ �1 Tom- cS License Number e ( t M 01,02-? 1 C, ? - z L Addres& Exp ation bate Signat a Telephone Not Applicable ❑ 9�eirp� ribr�i�tnerton Company Name Registration Number Address Exp' ation ate Telephone SECTION :10 - WORKERS': COMPENSATIQN 1NSlJRANCE; AFFIDWI.T (M:G.L. Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the buildi54 permit. Signed Affidavit Attached Yes....... No...... ❑ 5: The current exemption for "homeowners" was extended to include Owner - occupied Dwellings of one (1) or two(2) families and to allow such homeowner to engage an individual for hire who does not possess a license, provided that the owner acts as supervisor. CMR 780 Sixth Edition Section 108.3.5.1. Definition of Homeowner Person (s) who own a parcel of land on which he /she resides or intends to reside, on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm structures. A person who constructs more than one home in a two -year period shall not be considered a homeowner Such "homeowner" shall submit to the Building Official, on a form acceptable to the Building Official that he /she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. The undersigned "homeowner" certifies and assumes responsibility for compliance with the State Building Code, City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature The Commonwealth of Massachusetts . Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 www massgov/dia -Workers Compensation Insurance Affidavit: Builders / Contractors /Electricians/Plumbers A licant Information Please -Print Le 'bI Name ( Business /Organiiation/Individual): �J t Address: L `^-• � - �54 J � """""f 7t1 j . 'I .0!� 2.3 Phone. #: q l,3 City /State/Zip: �r,✓ � V% y� .Are you.an employer ?.Check the appropriate box:. - Type of project (required):. 4.. I am a general contractor and I ' 1. El I am a employer with 6 _ N co nstruction [� - - - -- - - * - -- —have hired -the- sub - contractors - -- - oyees (fiill - and/or part fame). . 7. Remode 2.. am a sole proprietor or partner- listed on the attached sheet 3. ❑ I a homeowner doing all work q u ❑ -- " - ship and have. no employees These sub- contractors - have. - .8. ❑ Demolition employees and have workers' 9: E] Building addition working for me in any capacity. in suran ce - [No workers comp- mstuanee COIDp. m 10 Electrical r airs or additions zegtured] 5. [] We are a corporation and its ❑ officers have.exercised their 11.❑ Plumbing repairs or additions myself [No workers' comp. right of exemption per MGL 12 [].Roof repairs insurance required] t P. 152, _§ 1(4), and we have no employees. [No workers', 13.�ther PC.�r. P a t Comp, insuranc required. }. - "Any applicant that checks box #1 must also fin out the section below showing their workers' co aisation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. =Contractors that check this box must - attached an additional sheet showing the name of the sub = contractors and state whcd= or not those entities have employees. If the sub- contractors have employees, they must provide their workers' comp. policy number. am an employer that is providing workers' compensation insurance for my employees. Below is the policy an I d job site information. Insurance Company Name: Policy # or Self -ins. Lic. #. Expiration Date: Job Site Address: City /Sta&Zip: Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage, as required under Section 25A of MGL c. 152 cant lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one -year imprisonment; as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investisations of the DIA for insurance coverage verification. — — — I de hereby ce under thepains andpenalties of perjury that the information provided above is true and correct -Si tore: -Date: Z !­1 f Phone #: 1 3 Offciai use only. Do not write in this area, to be completed by city br town offtcw City or Town: Permit/License # Issuing Authority (circle one): 1. Board of Health 2. Building Department 3. City/Town Clerk 4. Electrical Inspector 5. Plumbing Inspector 6. Other _ . � � Contact Person: Phone #: �! o HOME OWNER EXElwTPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner". as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached - or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two -year period shall not be considered a home owner." The buildin g. department for the City .of Ngrthampton wants persons) who: seek to use the home owner exemption;-to act `as their o"vrrcotrstraction su to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process require s' that. the.building department be called to inspect work at various stages, which include foundation /footings (before backfdl), sonotube holes (before , your). a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these. inspections before the worlds concealed, failure. to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will. be responsible to make sure that the trades hired secure their proper �ermits in conjunction to the building permit issued, and that they get their required in Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. .(Home owner /resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued t6 me. Date Address of work location