Loading...
509 Riverside Addition (2) ' ` SerUon. 4 L ALL NFORMATEON hifiJST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF IN|aOR.YKDATTION r — Existing Proposed I Required by Zoning This column to be filled M by Buildinc Department r ,,, t.:::: ,,„ , C7. - < ' , ---; ,1 r 7 - 7 , r el. Frontage Setbacks Front i �.t(/' �� � ECEe t 4 eo Footage P( of Parking Spaces ._.,_ _ _ ____t___ A. Has a Special Perrnit/Vorianoe/Findin0ener:been ssed for/on the site? `�- N0 UD07 �.___' YE3________ K�YES,date (esued: U1'r YES: VVao the pa mt eaoded at tHa Registry of Deeds? NO DON'T KNOW YES _____ ` l"l,: YES: enter Rook ___________ P�8e and/or Dooumant � B� Does [fie s(t� contaiD � brook, body ofvv3teF or wetlands? NO �� DON'T KNOW YE.S _ _____ ���k"-L%';, has a permit been o( Li i t) be obtained from the Conservation Commission? �ee6s c � �a m l':''' i'o��� � C D 0 any si( tt-:-;Xintun <hti ".n i:.pi: /up�dv7 � ND — !F YES describe s i:yDa aind |ooaton: ________________________'__ D, Are itnere any proposed chanp:es to or ddditions of si,gns intended for the orobeidy ?) No (FYES,desor{ba size, type and location: ________ // ; 1 ;9 1 , off '°i A ` ' - vAV,b Q 0(0 '1,24(4) , ��,A ?��. . v . r r rrrr rr rrr rrr ,rrrr , H JP, , S S FJ Frrnj.1-,1,-;i.:-...T 1 PH ty; HF I, II T(.1! 1)4 ;;;HrmH 5tjrtt U)11',.- j S -e-;'-= 144 II 1 IT, 7 r, f; - .7; • , , - S dl I Cl;‘!1,/ Sf 1:401,'HV,Inl,./i—i S („e„ :L,: I i P1 (.; [ fL I)! ;)1.11: City of Northampton Building Department June 14, 2011 RE: 509 Riverside Drive Proposed 2 story rear addition and whole house remodel Dear Louis and/or Chuck, This project will have dense packed cellulose blown into all walls, whether new construction or existing. We will provide video images of the wall cavities to ensuring the cavities are completely dense packed. This was discussed with Chuck in an email exchange dated 5/31/2011. I wll provide an engineer's stamp for structural components prior to framing inspection. Please contact me with any concerns. Steve Silverman 584.7522 W ]2O7128C I6, o Compliance Certificate • .0dm=mm5m7,,, Project Title: Suna /Ben Wood Project Energy Code: 2009 IECC Location: Northampton, Massachusetts Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 6404 Climate Zone: 5 Construction Site: Owner/Agent: Designer/Contractor: 509 riverside Drive Steven Silverman same as agent Northampton, MA 01062 Valley Home Improvement 340 riverside Drive Northampton, MA 01062 413.584.7522 steven@valleyhomeimprovement.com ;# ; ltaan,PENEIMIVK " ;=KP* l ir,*Pi**4*S,*tiA#**,PM . It 1.0.01.02613.A.WW.004.4:gaiWW Ceiling 1: Flat Ceiling or Scissor Truss 748 38.5 0.0 22 Wall 1: Wood Frame, 16" o.c. 540 19.3 0.0 21 Window 1: Vinyl Frame:Triple Pane 164 0.200 33 Door 1: Glass 20 0.300 6 Floor 1: All-Wood Joist/Truss:Over Unconditioned Space 220 31.0 0.0 7 Crawl 1: Solid Concrete or Masonry 0 10.0 0.0 0 Wall height: 4.0' Depth below grade: 3,0' Insulation depth: 4.0' Inside below-grade depth: 0.0' Project Notes: proposed 10x22 2 story rear addtion, demolition of exisitng garage DPC throughout home New High Efficiency Buderus gas boiler Project Title: Suna /Ben Wood Project Report date: 06/14/11 Data filename: C:\Users\SAS\Documents\REScheck\Suna Rescheck.rck Page 1 of 4 � m m �� �� ' m� ���*�,� Inspection Checklist �� ��������b���N���� ��,�����*���N��� Ceilings: J Ceiling 1: Flat Ceiling or Scissor Truss, R-38.5 cavity insulation Comments: Above-Grade Walls: U Wall 1: Wood Frame, 16''v.c, R-19.3 cavity insulation Comments: Windows: LJ Window 1 Vinyl Frame:Triple Pane, u-factor: o.zoo For windows without labeled U-factors, desc be features mpamm Frame Type Thermal Break? Yes No Comments Doors: LJ Door 1: Glass, u-factor: o.3oo Comments: -_- Floors: O Floor t All-Wood Jo|xuTmx`:ovo Unconditioned Space, R-31.0 cavit insulation Comments: Floor insulation is installed in permanent contact wit the underside of the subfloo decking. Crawl Space Walls: LJ Crawl 1: Solid Concrete or Masonry, 4.nm/n.nuo/�0'eminsv /n/r inside uo depth, n'1on cavity insulation Comments: Exposed earth in unvented crawl space foundations is covered wit a continuous vapor retarde (less than or equal to 0.1 perm). All joints of the vapor retarder are overlapped by 6 inches and are sealed or taped with edges extending at least 6 inches up the stem wall and securely attached. Air Leakage: U Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or solid material. O Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs/showers, and in openings between window/door jambs and framing. U Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. B Access doors separating conditioned from unconditioned space are weather-stripped and insulated (without insulation compression or damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed to maintain insulation application. U Wood-burning fireplaces have gasketed doors and outdoor combustion air. Air Sealing and Insulation: L] Building envelope air tightnes and insulation installation complies by eithe 1) a pos rough-in blower door test result of less than 7 ACH at 33 5 psf OR 2) the following items have been satisfied: (a) Air barriers and thermal barrier: Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b) Ceiling/attic: Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c) Above-grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. Project Title: Suna /Ben Wood Project Report date: 06/14/11 Data filename. CAosvo\sAS\ovc"monu^nEaohevmsvna Rescheck.rck Page 2 m4 (d) Floors: Air barrie is installed at any exposed edge of insulation. (e) Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or sprayed/blown insulation extends behind piping and wiring. (f) comom, hoau*m, narrow framing cavities, and rim joists are insulated. (g) Shower/tub on exterior wall: Insulation exists between showers/tubs and exterior wall. Sun,onmy: LJ Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-factor of 0.50 and the maximum skylight U-factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Materials Identification and Installation: U Materials and equipment are installed in accordance with the manufacturer's installation instructions. O Insulation is installed in substantial contact with the surface being insulated and in a manner that achieves the rated R-value. Materials and equipment are identified so that compliance can be determined. O Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. L] Insulation n+mmos, glazing ufacturs, and heating equipment efficiency are clearly marked on the building plans or specifications. Duct Insulation: L] Supply ducts in attics are insulated to a minimum of R-8. All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: O Building framing cavities are not used as supply ducts. O All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or UL 181B and are labeled according to the duct construction. Metal duct connections with equipment and/or fittings are mechanically fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray poly rethane foam. Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the joint so as to prevent a hinge effect. Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa). U Duct tightness test has been performed and meets one of the following test criteria: (1) Postconstruction leakage to outdoors test: Less than or equal to 8 cfm per 100 ff2 of conditioned floor area. (2) Postconstruction total leakage test (including air handler enclosure): Less than or equal to 12 cfm per 100 ff2 pressure differential of 0.1 inches w.g. (3) Rough-in total leakage tes with air handler installed: Les than or equal to6 cfm per 100 ff2 of conditioned floor area when tested at a pressure differential of 0.1 inches w.g. (4) Rough-in total leakage test without air handler installed: Less than or equal to 4 cfm per 100 ff2 of conditioned floor area. Heating and Cooling Equipment Sizing: LJ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. [J For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating (Sections 503 and 504). Circulating Service Hot Water Systems: L] Circulating service hot water pipes are insulated to R-2. O Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: O HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R Swimming Pools: L] Heated swimming poois have an on/off heater switch. O Pool heaters operating on natural gas or LPG have an electronic pilot light. O Timer switches on pool heaters and pumps are present. Exceptions: Project Title: Suna /Ben Wood Project Report date: 0e/14/11 Data filename: c:`uo*exsAo\ovmmonts \neaohvck\Sunr nav;her:mx Page 3 w1 Where public health standards require continuous pump operation. Where pumps operate within solar- and /or waste - heat - recovery systems. j Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a minimum insulation value of R -12. Exceptions: Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source. Lighting Requirements: ❑ A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following: (a) Compact fluorescent (b) T -8 or smaller diameter linear fluorescent (c) 40 lumens per watt for lamp wattage <= 15 (d) 50 lumens per watt for lamp wattage > 15 and <= 40 (e) 60 lumens per watt for lamp wattage > 40 Other Requirements: • Snow- and ice - melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement 'c'). Certificate: • A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values; window U- factors; type and efficiency of space - conditioning and water heating equipment. The certificate does not cover or obstruct the visibility of the circuit directory label, service disconnect label or other required labels. NOTES TO FIELD: (Building Department Use Only) Project Title: Suna /Ben Wood Project Report date: 06/14/11 Data filename: C:\ Users \SAS \Documents \REScheck \Suna Rescheck.rck Page 4 of 4 Ceiling / Roof 38.50 Wall 19.25 Floor / Foundation 31.00 Ductwork (unconditioned spaces): Window 0.20 Door 0.30 NA Heating System: Cooling System: Water Heater: Name: Date: Comments: