Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
22d-103-001
44-62 C r-•r-v' .S7f 2_2b-%3 -- o a / • t 1 Official Use Only Commonwealth of Massachusetts Permit No.�P—Z ?.��D0732 _>r. '' Department of Fire Services Occupancy and Fe Checke 223dD3g57 `-- j. ; IDS BOARD OF FIRE PREVENTION REGULATIONS 'Rev. I/2023) jr9 41z —'' . APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC),527 CMR 12.00 City or Town of: NORTHMAPTON _ Date: 8/26/2024 To the Inspector of Wires:By this application,the undersigned gives notices of his or her intention to perform the electrical work described below Location(Street&Number): 46 CLARK ST Unit No.: Owner or Tenant: PETER BUSCEMI Email: Owner's Address: 46 CLARK ST Ph, e No.: ' ' 63729 Is this permit in conjunction with a building permit?(Check appropriate box)Yes® No 11 e i No.. Purpose of Building: RESIDENTIAL Utility A oriz. io o.: Existing Service: Amps / V I Overhead Under and U No.of Meters: New Service: Amps , .It• Overhead ergr and V No.of Meters: Description of Proposed Electrical Installation: ,// INSTALLAITON OF ROOFTOP PHOT• ' 'LTAI• SOLAR SYSTEM# F%E 21 8.61KW NO BATTERY deck,4*tc►mil Completion of the following table m4 $ • waived by the Inspect. of Wir . 0 p no Shut rA ,a/ No.of Receptable Outlets: ..o witches: Generator KW Rating: Type: 1 No.Luminaires: No.of' es- , Luminaires: No.Wind Generators: Wind KW Rating: No.Appliances: KW: i .ter Heaters: ' : No.Transformers: Total KVA: Space Heating W: Heating Equipmen ' . No.Motors: Total HP: Total KW: No.Heat Pumps. Ti ` W: Total To . Fire Alarm System❑ No.of Devices: Swi ing Pool d.ElAbove-Grnd. r I '• ub 0 No.of Self--Contained Detection/Alerting Devices: N. B. ers No.Gas e Video System ❑ No.of Devices: N. Ai n ti\. T•to 'on Telecom System❑ No.of Outlets: No St. age Systems: 0 Storage Rating: Security System ❑ No.of Devices: olar 'V ' W D Rating:8•- 1 la 'V KW AC Rating:5.76 No.of Electric Vehicle Supply Equipment: .of'odules: 2 R •NM. nt® Ground-Mount ElLevel 1 ❑ Level 2 0 Level 3 0 Rating: OT ER: Attach additional ' ail if desired,or as required by the Inspector of Wires. Estimated Value of Electrical Work: 12949.44 (When required by municipal policy) Date Work to Start: Inspections to be requested in accordance with MEC Rule 10,and upon completion. FIRM NAME: SUNRUN INSTALLATION SERVICES A-I ®or C-1 0 LIC.No.: 4316 Al Master/Systems Licensee: NATHAN ASHE LIC.No.: 21136A Journeyman Licensee: NATHAN ASHE LIC.No.: 11361B Security System Business requires a Division of Occupational Licensure"S"LIC. S-LIC.No.: Address: 240A CHERRY ST SHREWSBURY MA 01545 Email: Pioneervalley rmits©sunrun.com Telephone No.: 4132598044 I certify,under t ai s and penalties of perjury,that the information on this application is true and complete. Licensee: Print Name: NATHAN ASHE Cell.No.: 9785943159 INSURANCE C ERAGE:Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability including"completed operation"coverage or its substantial equivalent.The undersigned certifies that such coverage is in force and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE® BOND❑ OTHER 0 Specify: OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law.By my signature below,I hereby waive this requirement. I am the:(Check one)Owner❑ Owner's agent 0 Owner/Agent: Tel.No.: Signature: Email.: Subject: Fw: Valley Solar From: Lauren Hirth <Ihirth@valleysolar.solar> Date: 10/31/2024, 11:31 AM To: "sfifield@northamptonma.gov" <sfifield@northamptonma.gov>, "kcarson@northampton.ma.gov" <kcarson@northampton.ma.gov>, "bwillard@northamptonma.gov" <bwillard@northamptonma.gov>, "rmalo@northamptonma.gov" <rmalo@northamptonma.gov> Hello, The client emailed this confirmation of her intent to proceed with the Valley Solar project and not the Sunrun project on 10/21/2024. It seems to have only gotten to Carson. Luckily, she CC'd me on the message so I can forward to the whole team. I hope this will be sufficient to proceed with the application review. Best regards, LAUREN HIRTH Project Manager '4'6' /ika,: 2023 ADVOCATE Ete4Avv2022 *BEST* 116 Pleasant Street, Suite 321, Easthampton, MA 01027 HOIE OF 413-584-8844 valle solar.solar 2021 THE VALLEY' Y MULTI-YEAR 2020 READERS' POLL VALLEY WINNER 2018 2024 `- SOLAR SunAlert From: Annbuscemi53 <annbuscemi53@aol.com> Sent: Monday, October 21, 2024 9:38 AM To: kcarson@northamptonma.gov<kcarson@northamptonma.gov> Cc: Lauren Hirth<Ihirth@valleysolar.solar> Subject: Valley Solar Good morning. This email is to let you know that we are moving forward with Valley Solar for our solar system. Please remove any information on Sunrun. Thanks. Ann Buscemi 413-519-5947 Sent horn the all new AOL app for IOS Subject: Re: Building and Electrical permits for solar project at 46 CLARK ST POLE 6 NORTHAMPTON, MA 01062 From: Beth Willard <bwillard@northamptonma.gov> Date: 10/31/2024, 11:12 AM To: Lauren Hirth <Ihirth@valleysolar.solar> CC: "rmalo@northamptonma.gov" <rmalo@northamptonma.gov>, "kcarson@northampton.ma.gov" <kcarson@northampton.ma.gov>, "sfifield@northamptonma.gov" <sfifield@northamptonma.gov> Hi Lauren, As I mentioned in my 10/21/2024 09:08 am email to you, we can not issue a permit to you at 46 Clark Ave. as another solar company already has pulled a permit at that address. As I also said in my 10/21/2024 10:19 email to you, only the homeowner or the contractor who pulled the permit can withdraw the permit. We have not yet received a written withdrawal from either. Beth On 10/31/2024 11:04 AM, Lauren Hirth wrote: Hello, I'm the project manager for the solar project at 46 CLARK ST POLE 6 NORTHAMPTON, MA 01062. According to my records, we submitted the permit applications for this project on 10/15/2024. I wanted to confirm that you received the applications and checks and have been able to review them. My notes mention a complication on 10/21/2024 when I asked the client to email you all re-confirming that she was proceeding with this project, not the Sunrun project. Has that issue been resolved? Thank you, LAUREN HIRTH Project Manager ADNGSpxiilSrita 2023 ADVOCATE Et44€11 2022 *BEST* 116 Pleasant Street, Suite 321, Easthampton, MA 01027 H01 OF 413-584-8844 I valleysolar.solar 2021 THE VALLEY y MULTI-YEAR 2020 REnnE:Rs r ol,1 VALLEY WINNER 2018 2 0 2 4 `_ SunAlert Beth Willard Principal Account Clerk Northampton Building Dept. 212 Main St. , Room 100 413-587-1271