Loading...
Bouthilette Reno Plans 9-29-24 PRINTGENERAL NOTES Remove & Dispose F.G. Tub & Surround Remove & Dispose of Wall Finish & gaming in These Areas Remove & Dispose of We Finish in These Area Remove & Dispose o F-loor Finish & Remov Subfloor in Shaded ArE Remove Toilet & Pedes Lav, Save Fixtu Remove Wall Sc Save and relocat Bathroon Outline of New Wall SECOND FLOOR DEMOLITION ?LAN Scale:1/4" =1'-0" New Shower Valvi Shower on S New Ceiling Mounted Showei Curtain and Slide Trac New Center door Drain w/ Full door Shower Pan Pitched to Drain Move E to 16 .ines Remove & Save Plumbing Chase Covering Front Door 5'-11" �� II II .II �I II II I II II � II II II Main Stairway Remove Ceiling Finish and door Framing, Install New door Framing 3" Below existing door EElevation F-IRST F-LOOR DEMOLITION PLAN Trim Railing to Match SECOND F-LOOR RE-:NOVATION PLAN Scale:l/2" =1'-0" Scale:1/4" =1-0" No. I REVISION/ISSUE I DATE I 1 1. 1 Added Demo & Construction notes 1 9/20i24 1 ORIENTATION STAMP ALL DRAWINGS ARE THE PROPERTY OF THE DESIGNER AND THEYARE NOT TO BE REPRODUCED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT OF THE DESIGNER CONTRACTOR TO CHECKAND VERIFYALL DIMENSIONS BEFORE COMMENCING WORKAND TO REPORTANY DISCREPANCIES TO THE DE5/GNER PROJECT NAME: BOUTHILETTE RENOVATIONS 3 TRINITY ROW FLORENCE, MA CLIENT: Nona & Barry Bouthilette DRAWING: BATH RENOVATIONS SCOPE OF WORK PLAN SCALE: AS Noted DATE: 7/23/2024 DRAWN BY: SHEET: A- 1 CHECKED BY: APPROVED BY: