Bouthilette Reno Plans 9-29-24 PRINTGENERAL NOTES
Remove & Dispose F.G.
Tub & Surround
Remove & Dispose of Wall Finish
& gaming in These Areas
Remove & Dispose of We
Finish in These Area
Remove & Dispose o
F-loor Finish & Remov
Subfloor in Shaded ArE
Remove Toilet & Pedes
Lav, Save Fixtu
Remove Wall Sc
Save and relocat
Bathroon
Outline of New Wall
SECOND FLOOR DEMOLITION ?LAN
Scale:1/4" =1'-0"
New Shower Valvi
Shower on S
New Ceiling Mounted Showei
Curtain and Slide Trac
New Center door Drain w/
Full door Shower Pan
Pitched to Drain
Move E
to 16
.ines
Remove & Save Plumbing
Chase Covering
Front Door
5'-11"
�� II II .II �I II II I
II II � II II II
Main Stairway
Remove Ceiling Finish and door
Framing, Install New door
Framing 3" Below existing door
EElevation
F-IRST F-LOOR DEMOLITION PLAN
Trim Railing to Match
SECOND F-LOOR RE-:NOVATION PLAN
Scale:l/2" =1'-0"
Scale:1/4" =1-0"
No. I REVISION/ISSUE I DATE I
1 1. 1 Added Demo & Construction notes 1 9/20i24 1
ORIENTATION STAMP
ALL DRAWINGS ARE THE PROPERTY OF THE DESIGNER
AND THEYARE NOT TO BE REPRODUCED IN WHOLE OR IN
PART WITHOUT THE WRITTEN CONSENT OF THE DESIGNER
CONTRACTOR TO CHECKAND VERIFYALL DIMENSIONS
BEFORE COMMENCING WORKAND TO REPORTANY
DISCREPANCIES TO THE DE5/GNER
PROJECT NAME:
BOUTHILETTE RENOVATIONS
3 TRINITY ROW
FLORENCE, MA
CLIENT:
Nona & Barry Bouthilette
DRAWING: BATH RENOVATIONS
SCOPE OF WORK PLAN
SCALE: AS Noted DATE: 7/23/2024
DRAWN BY:
SHEET:
A-
1
CHECKED BY: