42-062 (5) BP-2024-1364
15 GLENDALE RD COMMONWEALTH OF MASSACHUSETTS
Map:Block:Lot:
42-062-001 CITY OF NORTHAMPTON
Permit: Exterior Res
PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
BUILDING PERMIT
Permit# BP-2024-1364 PERMISSION IS HEREBY GRANTED TO:
Project# ROOF 224 Contractor: License:
PEAK PERFORMANCE ROOFING
Est.Cost: 8300 LLC CS-103061
Const.Class: Exp.Date:09/21/2026
Use Group: Owner: MOFFETT BARBARA A&DAVID J MOFFETT
Lot Size(sq.ft.)
Zoning: WSP Applicant: PEAK PERFORMANCE ROOFING LLC
Applicant Address Phone: Insurance:
I LOVEFIELD ST 413-203-5888 R2R'C493286
EASTHAMPTON, MA 01027
ISSUED ON: 10/17/2024
TO PERFORM THE FOLLOWING WORK:
STRIP AND REROOF
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter: Footings:
Rough: Rough: House # Foundation:
Final: Final: Final: Rough Frame:
Gas: Fire Department Driveway Final: Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Signature: 72-
Fees Paid: $60.00
212 Main Street,Phone(413)587-1240,Fax:(413)587-1272
Office of the Building Commissioner
Docusign Envelope ID:645CCA2C-F802-4D22-8FF9-EC50D13C3A55
RECEIV O)
The Commonwealth of Massac use 6 2024
Board of Building Regulations and Stan •rd 0Cj OR
s1 Massachusetts State Building Code,780 MR SE AL
IO
Building Permit Application To Construct,Repair, en&lia ,`(, HP" OlisliPe 0p01�`7 ar 2011
One- or Two-Family Dwelli
This Section For Official Use Only
Building Permit Number: 8P 'V /30y Date Applied:
4.5;?(Ad /0-0.2y
Building Official(Print Name) gnature Date
SECTION 1:SITE INFORMATION
1.1 Property Address: 1.2 Assessors Map& Parcel Numbers
15 Glendale Rd.
1.1 a Is this an accepted street?yes no Map Number Parcel Number
1.3 Zoning Information: 1.4 Property Dimensions:
Zoning District Proposed Usc Lot Area(sq ft) Frontage(ft)
1.5 Building Setbacks(ft)
Front Yard Side Yards Rear Yard
Required Provided Required Provided Required Provided
1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System:
Public 0 Private 0 Zone: _ Outside Flood Zone? Municipal 0 On site disposal system 0
Check if yes❑
SECTION 2: PROPERTY OWNERSHIP'
2.1 Owner'of Record:
Dave Moffett Northampton
Name(Print) City,State.ZIP
15 Glendale Rd, Florence 413-548-4447 davemoffett357@yahoo.com
No.and Street Telephone Email Address
SECTION 3:DESCRIPTION OF PROPOSED WORK1(check all that apply)
New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0
Demolition 0 Accessory Bldg.0 Number of Units Other 0 Specify:
Brief Description of Proposed Work2: Strip and replace asphalt roof
on house .
SECTION 4:ESTIMATED CONSTRUCTION COSTS
Item Estimated Costs: Official Use Only
(Labor and Materials)
1.Building S 8300 1. Building Permit Fee:$ Indicate bow fee is determined:
2.Electrical S i 0 Standard City/Town Application Fee
0 Total Project Cost3(Item 6)x multiplier x
3.Plumbing S 2. Other Fees: S
4.Mechanical (IIVAC) S List:
5.Mechanical (Fire S
Suppression) Total All Feed:/ ` II �
Check No.{��P'Check Amon • Cash Amount:
6.Total Project Cost: S 8300 0 Paid in Full 0 Outstanding Balance Due:
Docusign Envelope ID:645CCA2C-F802-4D22-8FF9-EC50D13C3A55
SECTION 5: CONSTRUCTION SERVICES
5.1 Construction Supervisor License(CSL)
CS-103061 09/21/2026
James Flannery ! License Number Expiration Date
Name of CSL holder
1 Lovefield St. List CSL Type(see below)
No.and Street 1 Type Description
Easthampton. MA 01027 U Unrestricted(Buildings up to 35,000 ca.ft.)
p R Restricted l&2 Family Dwelling
Cityrl'own.State,ZIP M Masonry
RC Roofing Covering
WS Window and Siding
SF Solid Fuel Burning Appliances
413-203-5888 peakperformanceroofinglIc@gmail.com I Insulation
Telephone Email address D Demolition
5.2 Registered Home improvement Contractor(HIC) 183698 11/03/2025
James Flannery/ Peak Performance Roofing LLC tllC Rcgimation Number Expiration Date
H C Compa�gqyj� tt}�or HiC Registrant Name
1 Loveiieic St. peakperformanceroofinglIc@gmail.com
No_and Street Email address
Easthampton, MA 01027 413-203-5888
City/Town,State,ZIP Telephone
SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide
this affidavit will result in the denial of the Issuance of the building permit.
Signed Affidavit Attached? Yes No ❑ •
SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN
OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
•
I,as Owner ofthe subject property,hereby authorizeJames Flannery/Peak Performance Roofing LLC
to act on my behalf,in ail matters relative to work authorized by this building permit application.
10/9/2024
rmt wner's Name(Electronic Signature) Date
SECTION 7b: OWNER}OR AUTHORIZED AGENT DECLARATION
By entering my name below,i hereby attest under the pains and penalties of perjury that all of the information
contained in this application is true and accurate to the best of my knowledge and understanding.
James Flannery lance Ral Kent 10/9/2024
Print Owner's or Authorized Agent's Name(Electronic Signature) Date
NOTES:
1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor
(not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration
program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at
www.mass.eov/oca Information on the Construction Supervisor License can be found at wtvw.mass.eov'dps
2. When substantial work is planned,provide the information below:
Total floor area(sq. ft.) (including garage,finished basement/attics,decks or porch)
Gross living area(sq.ft.) Habitable room count
Number of fireplaces Number of bedrooms
Number of bathrooms Number of half/baths
Type of heating system Number of decks/porches
Type of cooling system Enclosed Open
3. "Total Project Square Footage"may be substituted for"Total Project Cost"
Docusign Envelope ID:645CCA2C-F802-4D22-8FF9-EC50D13C3A55
The Roofing Process : What to Expect
When will my roof be scheduled? Once the contract, deposit, and building permit
are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of
our crew is a priority. We must work around the weather forecast; here in New England, this
means we can't plan our schedule very far in advance, and can't promise specific installation
dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and
patience in our dealings with Mother Nature!
Your project manager will contact you a few days before they wish to proceed. Our crews are
hardworking and efficient; most residential installations take only 1-2 days to install.
Do I need to do anything to prepare? As noted on your contract, we are not
responsible for dirt/debris that may fall into the attic. Depending on the condition of the
plywood, you may see little to no debris, or it could be more substantial. If you store items in the
attic, we recommend covering with plastic sheeting.
Do I need to notify my neighbors? If your home is extremely close to other homes
or driveways, there's a possibility we may need to be on their property temporarily to lay
protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a
courtesy. Your neighbors will likely appreciate notification of the noise/traffic.
Materials and Dumpster Delivery: The materials and dumpster may arrive the day
before the scheduled installation (especially if your installation is taking place on a weekend).
Depending on your home's layout and driveway(s), we may need vehicles moved at this point.
Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL
driveways, and away from the house, to avoid any damage, and for our access.
How early will you start? Our crews will begin as early as 7.30am. They will work a
long day, often until dark if necessary. We aim to have the installation completed in as few days
as possible to minimize disruption to you and your neighbors.
Do I need to be home? It's up to you. Some customers like to keep an eye on what's
going on. Others would rather not be home because of the noise. Be aware that roofing is loud
(banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets.
Please do not plan on outdoor activities while we are working, for safety's sake. Please keep
pets inside, or on a leash away from the roofing activities.
Docusign Envelope ID:645CCA2C-F802-4D22-8FF9-EC50D13C3A55
What if I have an urgent question? If you have an urgent issue outside of regular
office hours, call or text your project manager directly on his cell.
Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying
sheathing. Your contract states we will replace a small amount of plywood at no additional cost
if needed. If more serious issues are found, the project manager will contact you to explain.
There may need to be an upcharge on the final bill, consistent with the per sheet or square foot
amount quoted in your estimate.
Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done,
we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew
may need to leave before cleaning up, or if the job ends midday, they may leave to start another
job. Another staff person will come later or the next day for more cleaning.
There are materials left over. Did I get charged for those?
Your job is priced according to the measurements. We always bring extra material for the
jobsite, just to be safe. You were not charged for those and we will be collecting them. One of
our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days.
When will the dumpster be removed? The dumpster is usually removed the next
business day after the main crew has finished. Weekends or holidays may delay pickup.
The dumpster company should check for any debris after removal, but please do a visual check
before walking or driving over the area where the dumpster was located. If you see any debris
there, please let us know.
The job is done but I have concerns, what should I do?
Please be aware that even after the main installation crew has left, that doesn't mean our job is
done. The project manager will be coming by as soon as possible to do a final inspection, and a
staff person will come by to do a final sweep, and pickup leftover items. Depending on our
schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days
after main installation is complete. If you have any other questions, please let us know.
Thank you for choosing Peak Performance Roofing!
We will do our very best to make this major home improvement a smooth experience for you!
Signed by
Vak hOrft i+ 10/9/2024
'-3B8947481A6F461.P E K 1 Lovefield St., Easthampton MA 01027
P E R F O R CE 13-203-5888 M-F 9am-4pm
ROOFING peakperformanceroofingllc@gmail.com
City of Northampton 212 Main Street, Northampton, MA 01060
Solid Waste Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as
a condition of the building permit all debris resulting from the construction
activity governed by this Building Permit shall be disposed of in a properly
licensed solid waste disposal facility, as defined by MGL c 111 , S 150A.
Address of the work: 15 GLENDALE RD.
The debris will be transported by: Aaron's 24/7 Towing and Roll-On
The debris will be received by: Valley Recycling
Building permit number:
Name of Permit Applicant Peak Performance Roofing LLC/James Flannery
10/10/2024 James Flannery
Date Signature of Permit Applicant
The Commonwealth of Massachusetts
17 h A/, Department of Industrial Accidents
_?,�1 6 1 Congress Street,Suite 100
„�j-_ 1 Boston,MA 02114-2017
= ;L,=,f. www massgov/dia
im
Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers.
TO BE FILED WITH THE PERMITTING AUTHORITY.
Applicant Information Please Print Legibly
Name (Business/Organization/Individual): PEAK PERFORMANCE ROOFING, LLC
Address: 1 LOVEFIELD STREET
City/State/Zip:EASTHAMPTON, MA 01027 Phone #:413-203-5888
Are you an employer?Check the appropriate box: Type of project(required):
i.p I am a employer with 4 employees(full and/or part-time).* 7. ❑New construction
2.0 I am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling
any capacity.[No workers'comp.insurance required.]
9. ❑Demolition
3.1:j 1 am a homeowner doing all work myself.[No workers'comp.insurance required.]t
10❑Building addition
4.❑I am a homeowner and will be hiring contractors to conduct all work on my property. I will
ensure that all contractors either have workers'compensation insurance or arc sole 11.❑Electrical repairs or additions
proprietors with no employees.
12.❑Plumbing repairs or additions
S❑I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.IMI Roof repairs
These sub-contractors have employees and have workers'comp.insurance.t
6.0 We are a corporation and its officers have exercised their right of exemption per MGL c. 14. Other
152,§1(4),and we have no employees.[No workers'comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below Is the policy and job site
information.
Insurance Company Name: Crum&Forster Specialty Insurance Company
Policy#or Self-ins.Lic.#:R2WC551056 Expiration Date:04/27/2025
Job Site Address: 15 GLENDALE RD. City/State/Zip: NORTHAMPTON, MA
Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date).
Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00
and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a
day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coverage verification.
I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct.
Signature: James J Flannery Date: 10/10/2024
Phone#:413-203-5888
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector
6.Other
Contact Person: Phone#:
Docusign Envelope ID:645CCA2C-F802-4D22-8FF9-EC50D13C3A55
Peak Performance Roofing LLC
1 Lovefield St. P E
Easthampton, MA 01027
413-203-5888 P E R F O R CE
peakperformanceroofingllc@gmail.com ROOFING
MA HIC#183698 MA C5L#103061
Contract
ADDRESS CONTRACT# 11318
Dave Moffett DATE 10/09/2024
15 Glendale Rd.
Florence
413-548-4447
davemoffett357@yahoo.com
JOB LOCATION
15 Glendale Rd, Florence
DESCRIPTION
Peak Performance Roofing will provide the labor and materials to perform the following:
1. Remove existing materials from the roof.
2. Inspect sheathing for compromised areas. Install plywood as needed at +$75 sheet. Replace boards as
needed at $2.50 per sq ft.
3. Install Ice/Water Shield (6 feet on eaves, 3 feet in valleys/around penetrations).
4. Apply Synthetic Underlayment to remaining roof areas.
5. Install 8" aluminum drip edge to all eaves and rakes.
6. Install architectural shingles by CertainTeed: Landmark PRO Shingles
COLOR: TBD
7. Install Shingle Ridge Vent II in designated areas.
8. Complete all necessary flashings, including LIFETIME pipe boots and chimney base.
Remove all debris from premises, and throughout the job, continue cleanup and keep the premises
undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO
ATTIC/INTERIOR.
Please use reasonable caution during the installation process: do not walk or drive under active work or on
areas of potential roofing debris. Installations are weather permitting; inclement weather will cause
scheduling delays.
Peak Performance Roofing LLC will obtain the building permit.
Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties
are not in effect until Paid In Full.
Docusign Envelope ID:645CCA2C-F802-4D22-8FF9-EC50D13C3A55
DESCRIPTION
Includes CertainTeed Lifetime Limited Warranty (Transferable) with 10 year SureStart period.
https://www.certainteed.com/resources/Asphalt_Warranty_CTR3782_1912 E.pdf
Total: $8300
A one-third deposit of$2766 will secure contract,permitting,material order, and priority scheduling.
The balance shall be due upon completion,within 10 days of invoice. Accounts outstanding over 30 days
subject to 2% finance charge monthly.
DISCLAIMERS
1)LEAKING CHIMNEY
Peak Performance Roofing takes measures to prevent water penetration at the chimney-roof connection by
installing high-quality flashing. However, leaks that stem from the chimney structure itself,particularly in
adverse weather conditions like diagonal,wind-driven rain are not covered under our 3-YEAR labor
warranty. Homeowners are encouraged to arrange for ongoing chimney care and repair with a certified
mason.
2) PROJECT MAP IT
Upon signing,you consent to have your project included on our public work map after completion. This
project entry will only be used to aid future customers in their decision-making process. Only non-
sensitive,public information will be shown. Please inform us if you would like to opt out.
Thank you for choosing Peak Performance Roofing!
TOTAL $8,300.00
nSigned by:
/ - 4 10/9/2024
`—388947481A6F461
Accepted By Accepted Date