32A-162 (21) 32A - iLz
r ` Final Construction Control Document
13 II I G To be submitted at completion of construction by a
' Registered Design Professional
141/4.l�!
1 for work per the 9t1i edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Art Trust Interior renovations Date: Nov.30th,2023 Permit No.:
Property Address: 33 Hawley street Northampton,Ma.
Project: Check(x)one or both as applicable: New construction X Existing Construction
Project description: Plumbing, Fire Protection and HVAC systems renovations for interior renovations of performing Art
Center
I James P Stroke,MA Registration Number: 20068 Expiration date: June 31,2024,am a registered design professional,
and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
Architectural Structural X Mechanical
Fire Protection Electrical Other: Describe
for the above named project. I,or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
OF*A,.
DAMES P.
STROKE ,,,,
4 J ui
NO.2008S
.q,
,441
ssroH ��'
�
ft°
Enter in the space to the right a"wet"or
electronic signature and seal:
Phone number: 413-626-8752 Email: ddangelo@tjconway.com
Building Official Use Only
Version 06 1 1 2013
Final Construction Control Document
= It 4/
To be submitted at completion of construction by a
w I Registered Design Professional
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
The Northampton Community Arts Trust 12/5/23
Project Title: Date: Permit No.
Interior Renovations to 33 Hawley Street, Northampton, MA
Property Address:
Project: Check(x) one or both as applicable: New construction X Existing Construction
Project description:
Renovate the interior of the existing building.
Thomas Douglas Lic. No. 8944 August 2020
I MA Registration Number: Expiration date: ,am a registered design professional,and I have
prepared or directly supervised the preparation of all design plans,computations and specifications concerning:
X Architectural Structural Mechanical
Fire Protection Electrical Other:Describe
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet" or 10.0 A.?
electronic signature and seal:
+ "�f��n
a, • G.a .., �
Vi C� ,,.
I
wanterrou
t 1L'wa". l�
413-585-0641 douglas@tdouglasarchitects.com lraa s
Phone number: Email: '-�
Building Official Use Only
Building Official Name: Permit No.: Date:
Version Ol Ol 2018
Final Construction Control Document
To be submitted at completion of construction by a
Q `T{l Registered Design Professional
11110
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:The Arts Trust Building-Renovations&Additions Date:Nov.30,2023 Permit No.
Property Address: 33 Hawley St.Northampton,MA
Project: Check(x)one or both as applicable: X New construction X Existing Construction
Project description: Renovations to existing structure to accommodate the intended use as a new
performance arts center along with a new entry addition.
I Charles C.Brown,P.E MA Registration Number: 49433 Expiration date: 06-30-2024 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans,computations and
specifications concerning:
Architectural X Structural Mechanical
Fire Protection Electrical Other:
for the above named project. I, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and
belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved
as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept,shop drawings,samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with
the progress and quality of the work and to determine if the work was performed in a manner consistent
with the construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
Enter in the space to the right a"wet" or rst,.8\
electronic signature and seal: �
•
ItgC TOW;
Phone number:860-388-1224 Email:Brown@gncbengineers.com
Building Official Use Only
Building Official Name: Permit No.: Date:
Version O1 01 2018
9 Washington Street
Rutland,Vermont 05701
kre Engineering Services 802-855-8091
of Vermont, tic 5430 Waterbury-Stowe Rd.,2nd Floor
Waterbury Center,VT 05677
Meohantoal-ileotrical Consulting Engineers 802.882.8449
www.EngineeringVermont.com
FIELD REPORT
Date: 11/30/2023 ESVT Project No.: 1 22083
Project: Northampton Community Arts Trust Improvements
Location: 33 Hawley Street, Northampton, MA
Contractor: W.J. Mountford, Co. Owner: NCAT
Weather: Sunny Temperature: 45F
Present at Site:
Palmeri Electric
W.J. Mountford Co.
Report Author:` Claus Bartenstein, P.E.
Arrived on site 11/30/2023 at 12:30PM to perform inspection of electrical work. Inspected all work
(visible) associated with this project and spoke with Contractors. In general, the electrical work
looks very professional - appears to be quality efforts. There is still some work to be done for
completion, some (most likely) is listed below. Inspection was complete and left site at about
2:15 PM.
General
1. Label receptacles that at GFCI protected from a circuit breaker. Mainly in Green Room
and Dressing Rooms.
Dressing 004A, 004B-
2. Missing two lamps in the"W" luminaire above one mirror. 004A
3. Damaged wall at feed points to plug-mold at several locations.
Storage 007 -
4. There is an extension cord coiled above the door to the Telecom/Mech/Storage Room
and it is mudded into the drywall. Extension cords are temporary and not allowed as
permanent wiring. This extension cord must be removed.
Mechanical-
5. Provide permanent directory for panel TP1
Lobby 102
6. Some labeling of switches, or maybe a framed plan is needed to know what switch
controls what.
7. Some of the dimming switches cannot dim the LED lamps which are presently installed.
Lamps and/or control needs to be changed with ensured compatibility such that the
dimming control operates.
8. ETC controller for RGBW TP tape light luminaires on beams requires programming and
likely Owner training. Recommend contacting the ETC controls representative for