Loading...
Thomson, Sydney Letter SS ® VSE Project Number: U1932.1364.241 July 3, 2024 Bright Planet Solar ATTENTION: Mikey Heinz 103A Millbury St. Auburn, MA 01501 REFERENCE: Thomson, Sydney Residence: 114 Woodland Drive, Northampton, MA 01062 Bright Planet Solar Project: BPS380710 Solar Array Installation To Whom It May Concern: We have reviewed the existing structure at the above referenced site.The purpose of our review was to determine the adequacy of the existing structure to support the proposed installation of solar panels on the roof as shown on the panel layout plan. Based upon our review, we conclude that the existing structure is adequate to support the proposed solar panel installation. Design Parameters Code: Massachusetts State Residential Code (780 CMR Chapter 51, 9th Edition (2015 IRC)) Risk Category: II Design wind speed, Vult: 117 mph (3-sec gust) Wind exposure category: C Ground snow load, Pg: 40 psf Flat roof snow load, Pf: 35 psf Existing Roof Structure Roof structure: 2x8 rafters @ 16" o.c. Roofing material: asphalt (composite) shingles Roof slope: 37° Connection to Roof Mounting connection: (1) Ecofasten Rockit Smartslide w/(2) #12 screws into framing at max. 48" o.c. along panel edges This installation uses a rail-less system. Panel Orientation: Portrait Maximum panel dimension: 76.4x41 in Connections shall be staggered so as not to overload any existing structural member Conclusions Based upon our review,we conclude that the existing structure is adequate to support the proposed solar panel installation. The gravity loads,and thus the stresses of the structural elements,in the area of the solar array are either decreased or increased by no more than 5%.Therefore,the requirements of Section 807.4 of the 2015 IEBC as referenced in 780 CMR Chapter 34, 9th Edition are met and the structure is permitted to remain unaltered. 651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com ® VSE Project Number: U1932.1364.241 Thomson, Sydney Residence 7/3/2024 The solar array will be flush-mounted (no more than 10"above the roof surface)and parallel to the roof surface.Thus,we conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), the governing load case.Increases in lateral forces less than 10%are considered acceptable.Thus the existing lateral force resisting system is permitted to remain unaltered. Limitations Installation of the solar panels must be performed in accordance with manufacturer recommendations.All work performed must be in accordance with accepted industry-wide methods and applicable safety standards.The contractor must notify Vector Structural Engineering,LLC should any damage,deterioration or discrepancies between the as-built condition of the structure and the condition described in this letter be found.The use of solar panel support span tables provided by others is allowed only where the building type,site conditions,site-specific design parameters,and solar panel configuration match the description of the span tables.The design of the solar panels,solar racking (mounts,rails,etc.)and electrical engineering is the responsibility of others.Waterproofing around the roof penetrations is the responsibility of others.Vector Structural Engineering assumes no responsibility for improper installation of the solar array.Vector Structural Engineering shall be notified of any changes from the approved layout prior to installation. VECTOR STRUCTURAL ENGINEERING, LLC 07/03/2024 _______________________________________________________ Wells Holmes, S.E. MA License: 54240 - Expires: 06/30/2026 Project Engineer Enclosures WLH/thp 07/03/2024 651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com JOB NO.:U1932.1364.241 SUBJECT:WIND PRESSURE ® PROJECT:Thomson, Sydney Residence Label:Note: Calculations per ASCE 7-10 SITE-SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]:117 Notes: Exposure Category:C Risk Category:II Importance Factor, I: ADDITIONAL INPUT & CALCULATIONS: Height of Roof, h [ft]:25 (Approximate) Comp/Cladding Location:Yes Enclosure Classification: Zone 1 GCp:0.9 Figure 30.4-2C (enter negative pressure coefficients) Zone 2 GCp:1.2 Zone 3 GCp:1.2 α:9.5 Table 26.9-1 zg [ft]:900 Table 26.9-1 Kh:0.95 Table 30.3-1 Kzt:1 Equation 26.8-1 Kd:0.85 Table 26.6-1 Velocity Pressure, qh [psf]:28.2 Equation 30.3-1 GCpi:0 Table 26.11-1 PRESSURES:Equation 30.9-1 Zone 1, p [psf]:25.9 psf (1.0 W, Interior Zones, beyond 'a' from roof edge) Zone 2, p [psf]:33.2 psf (1.0 W, End Zones, within 'a' from roof edge) Zone 3, p [psf]:33.2 psf (1.0 W, Corner Zones, within 'a' from roof corner) (a= 3 ft) Solar Panel Array Gable Roofs 27° < θ ≤ 45° Enclosed Buildings Components and Cladding Wind Calculations piphGCGCqp JOB NO.:U1932.1364.241 SUBJECT:CONNECTION ® PROJECT:Thomson, Sydney Residence Calculate Uplift Forces on Connection Pressure (0.6 Dead -0.6 Wind) (psf) Max Trib. Width1 (ft) Max Trib. Area2 (ft2) Max Uplift Force (lbs) Zone 1 13.7 4.0 25.5 349 Zone 2 18.1 4.0 12.7 231 Zone 3 18.1 4.0 12.7 231 Calculate Connection Capacity Connection Description: Ultimate Capacity3 [lbs]:1590 Factor of Safety:3 Quantity per Connection:1 Prying Coefficient:1 Connection Capacity [lbs]:530 Determine Result Maximum Demand [lbs]:349 Connection Capacity [lbs]:530 Result:Capacity > Demand, Connection is adequate. Notes 1. 'Max Trib. Width' is the width along the panel seams tributary to the connection. 3. Ultimate capacity values are from manufacturer testing. 2. 'Max Trib Area' is the product of the 'Max. Trib Width' and the panel width/height perpendicular to the direction of the connection spacing. Tributary area on connections at array edges are reduced by 50% as they Ecofasten Rockit Smartslide w/(2) #12 screws into framing VECTOR STRUCTURAL ENGINEERS JOB NO.:U1932.1364.241 SUBJECT:GRAVITY LOADS ® PROJECT:Thomson, Sydney Residence GRAVITY LOADS Roof Pitch: 9.0 :12 ROOF DEAD LOAD (D) Increase due to pitch Material weight [psf] Asphalt (Composite) Shingles 1.25 2.0 1/2" Plywood 1.25 1.0 Framing 1.00 3.0 Insulation 1.00 0.0 1/2" Gypsum Clg.1.25 0.0 M, E & Misc 1.00 0.0 Total Existing Roof DL PV Array DL 1.25 3 DL:1.25 ROOF LIVE LOAD (Lr) Existing Design Roof Live Load [psf]20 ASCE 7-10 Table 4-1 Roof Live Load With PV Array [psf]20 SNOW LOAD (S):w/ Solar Array Roof Slope [x:12]:9.0 Roof Slope [°]:37 Ground Snow Load, pg [psf]:40 ASCE 7-10, Section 7.2 Terrain Category:C ASCE 7-10, Table 7-2 Exposure of Roof:Fully Exposed ASCE 7-10, Table 7-2 Exposure Factor, Ce:0.9 ASCE 7-10, Table 7-2 Thermal Factor, Ct:1.1 ASCE 7-10, Table 7-3 Risk Category:II ASCE 7-10, Table 1.5-1 Importance Factor, Is:1.0 ASCE 7-10, Table 1.5-2 Flat Roof Snow Load, pf [psf]:35 ASCE 7-10, Equation 7.3-1 Minimum Roof Snow Load, pm [psf]:0 ASCE 7-10, Section 7.3.4 Unobstructed Slippery Surface?No ASCE 7-10, Section 7.4 Slope Factor Figure:Figure 7-2b ASCE 7-10, Section 7.4 Roof Slope Factor, Cs:1.00 ASCE 7-10, Figure 7-2 Sloped Roof Snow Load, ps [psf]:35 ASCE 7-10, Equation 7.4-1 Design Snow Load, S [psf]:3535 9.0 37 40 C Fully Exposed 0.9 1.1 II 1.0 35 0 No Figure 7-2b 1.00 35 Design material weight [psf] 2.5 1.3 3.0 0.0 0.0 0.0 6.8 3.8 #VALUE! Existing JOB NO.:U1932.1364.241 SUBJECT:LOAD COMPARISON ® PROJECT:Thomson, Sydney Residence Summary of Loads Existing With PV Array D [psf]7 11 Lr [psf]20 20 S [psf]35 35 Maximum Gravity Loads: Existing With PV Array (D + Lr) / Cd [psf]21 24 ASCE 7-10, Section 2.4.1 (D + S) / Cd [psf]36 40 ASCE 7-10, Section 2.4.1 Maximum Gravity Load [psf]:36 40 Maximum Member Forces: GEOMETRY Span(ft)15.7 (Approximate) Solar Panel Array Start, a (ft)0.0 (Approximate) Solar Panel Array Length, b (ft)5.1 (Approximate) Framing Spacing (ft)1.3 MEMBER FORCES Existing With PV Array Vertical Reaction, V1 (lbs)380 399 OK Vertical Reaction, V2 (lbs)380 384 OK Existing With PV Array Moment @ Center, M (lbs-ft)1493 1521 OK Ratio The gravity loads, and thus the stresses of the structural elements, in the area of the solar array are either decreased or increased by no more than 5%. Therefore, the requirements of Section 807.4 of the 2015 IEBC as referenced in 780 CMR Chapter 34, 9th Edition are met and the structure is permitted to remain unaltered. (Cd = Load Duration Factor = 0.9 for D, 1.15 for S, and 1.25 for Lr) Ratio 102% 105% 101%