Loading...
Initial Construction Control_Structural�C\ � Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional Syr for work per the 91h edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: Building Addition Date: June 21, 2024 Property Address: 60 Maple Street, Florence, MA Project: Check (x) one or both as applicable: X New construction X Existing Construction Project description: Remove section of building, provide new addition. I, Robert Leet, MA Registration Number: 38942 Expiration date: 06/30/2026, am a registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': _ Entire Project Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings. samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document. Enter in the space to the electronic signature and Phone number: 978-54z Email: WhetstoneEng9' Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an `x' project design plans, computations and specifications that you prepared or directly supervised. If other' is chosen, provide a description. Trial Version 10 09 2012