Loading...
38B-282 (8) BP-2024-0763 16 WINTHROP ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 38B-282-001 CITY OF NORTHAMPTON Permit: Exterior Res PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2024-0763 PERMISSION IS HEREBY GRANTED TO: Project# ROOF 2024 Contractor: License: PEAK PERFORMANCE ROOFING Est. Cost: 4595 LLC CS-103061 Const.Class: Exp.Date:09/21/2024 Use Group: Owner: GERSTLE KATHERINE&JENNIFER WERNER Lot Size(sq.ft.) Zoning: URB Applicant: PEAK PERFORMANCE ROOFING LLC Applicant Address Phone: Insurance: I LOVEFIELD ST 413-203-5888 R2WC'493286 EASTHAMPTON, MA 01027 ISSUED ON: 06/12/2024 TO PERFORM THE FOLLOWING WORK: PARTIAL ROOF REPLACEMENT POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.I'.A\'. Building Inspector I ndcrground: Service: Meter: Footings: Rough: Rough: House # Foundation: Final: Final: Final: Rough Frame: (:as: Fire Department Driselsay Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. I� Signature: ���1�:...--. Fees Paid: $40.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner DocuSign Envelope ID:B89815E8-8618-4924-BF60-62CF5D2760D4 _ / ii--8----c---------- /3QEIVE0 , The Commonwealth of Massachusettj `�( 1 1N 12 2024 F R 7 Board of Building Regulations an Stan ards Il'ALITY 1� Massachusetts State Building Cod ,780�aro� nu�to'N SE `� Building Permit Application To Construct,Repair.Reno r en evis d Mar 2011 One-or Two-Family Dwelling =_ This Section For Official Use Only Building Permit Number: g/7''at'f /703 Date Applied: 44-1 rZ ,72 6-12-ZON Building Official(Print Name) Signature Date SECTION 1;SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 16 Winthrop St., Northampton I.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) € 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,gS4) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zonc• _ Outside Flood Lorne? Municipal O On site disposal system 0 Check ifyes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Ownerr of Record: Jen Werner Northampton Name(Print) City,State,ZIP 16 Winthrop St. 413-575-8959 jenwerner22@gmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg.0 Number of Units Other Cl Specify: Brief Description of Proposed Work2: Partial Replacement: Strip and replace asphalt roof on garage and front porch. Replace hip and ridge on main house. SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) 1.Building S 4595 1. Building Permit Fee: $ Indicate bow fee is determined: 2.Electrical S 0 Standard City/Town Application Fee 0 Tonal Project Cost3(Item 6)x multiplier x 3.Plumbing i S 2. Other Fees: S 4.Mechanical (HVAC) f $ List: 5.Mechanical (Fire $ Suppression) Total All F�efGs�• ;/,), IL!0 Check NO.'M '4:heck Amount: Cash Amount: 6.Total Project Cost: $ 4595 ❑Paid in Full 0 Outstanding Balance Due: DocuSign Envelope ID:B89815E8-8618-4924-BF60-62CF5D2760D4 SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-103061 09/21/2024 James Flannery ; License Number Expiration Date Name of CSL Holder L) 1 Lovefield St. List CSL Type(see below) No.and Street Type Description U Unrestricted(Buildings up to 35,000 ea.ft.) Easthampton. MA 01027 I R , Restricted 1B2 Family Dwelling City/Town,State,ZIP • M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 413-203-5888 peakperformanceroofinglIc@gmail.com I Insulation Telephone Email address I D Demolition 5.2 Registered Home Improvement Contractor(HIC) 183698 11/03/2025 James Flannery/ Peak Performance Roofing LLC tnC Registration Number Expiration Date HIC Company or HIC Registrant Name 1 Lovetlela�bt. peakperformanceroofingllc@gmail.com No.and Street Email address Easthampton, MA 01027 413-203-5888 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION LNSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes No . 0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorizeJames Flannery/Peak Performance Roofing LLC to act on my behalf,in all matters relative to work authorized by this building permit application. 6/4/2024 ain't C7wner`s Name(Electronic Signature) Date SECTION 7b:OWNERI OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. James Flannery , (Ames Rar.rkerrt. 6/4/2024 Print Owner's or Autboriztd Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at I www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.t ov/dos 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system ' Number of decks/porches Type of cooling system_ Enclosed _ Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" The Commonwealth of Massachusetts Department of Industrial Accidents 1 1 Congress Street, Suite 100 _'�•f Boston, MA 02114-2017 wwx.mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): PEAK PERFORMANCE ROOFING, LLC Address: 1 LOVEFIELD STREET City/State/Zip: EASTHAMPTON, MA 01027 Phone#:413-203-5888 Are you an employer?Check the appropriate box: Type of project(required): I.❑✓ I am a employer with 4 employees(full and/or part-time).* 7. ❑New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. ❑ Remodeling any capacity.[No workers'comp.insurance required.] 3.0 I am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. El Demolition 10 ❑ Building addition 4.0 I am a homeowner and will be hiring contractors to conduct all work on my property. I will ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.0 Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 6.0 We arc a corporation and its officers have exercised their right of exemption per MGL c. 14.❑Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box Al must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they arc doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:BERKSHIRE HATHAWAY GUARD Policy#or Self-ins.Lic.#:R2WC493286 Expiration Date:04/27/2025 Job Site Address: 16 WINTHROP ST. City/State/Zip:NORTHAMPTON, MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the forth of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: James J Flannery Date: 6/5/2024 Phone#:413-203-5888 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 16 WINTHROP ST. The debris will be transported by: Aaron's 24/7 Towing and Roll-On The debris will be received by: Valley Recycling Building permit number: Name of Permit Applicant Peak Performance Roofing LLC/ James Flannery 6/5/2024 James Flannery Date Signature of Permit Applicant DocuSign Envelope ID:B89815E8-8618-4924-BF60-62CF5D2760D4 Peak Pezfonnance Roofing LLC 1 Lovefield St. P E Easthampton, MA 01027 413-203-5888 P E R F O R CE peakperformanceroofingllc@gmail.com ROOFING MA HIC#183698 MA CSL#103061 Contract ADDRESS CONTRACT# 11269 Jen Werner DATE 06/04/2024 16 Winthrop St. Northampton 413-575-8959 jenwerner22@gmail.com JOB LOCATION 16 Winthrop St. Northampton DESCRIPTION SEE EMAIL FOR VISUAL PLEASE NOTE: The pricing provided below is itemized separately for each component. However, the total reflects a bundled pricing assumption based on the execution of all proposed options. Should any specific item, such as the garage replacement, be excluded from the project scope at your discretion, it will necessitate a revision of the estimate. We will follow up with an adjusted price for the remaining components to accurately reflect the changes to the scope of work. Peak Performance Roofing will provide the labor and materials to perform the following: PARTIAL REPLACEMENT ITEM #1: MAIN HOUSE-HIP & RIDGE AREA $975.00 1. Remove materials along the hips and ridge of the main roof area only. 2. Install Shingle Vent II along the ridge of this area. 3. Install closest matching cap shingles along hip and ridge area. ITEM#2: REPLACE AREA ABOVE FRONT PORCH $1350.00 1. Remove existing materials from the roof area. 2. Inspect sheathing for compromised areas; replace as needed. (If new plywood is necessary: +$60/sheet*** or $6/foot) 3. Apply synthetic underlayment across the full roof surface. 4. Install closest matching architectural shingles (IKO-Harvard Slate) 5. Install 8" aluminum drip edge to all eaves and rakes. 6. Complete all necessary flashings. ITEM #3: REPLACE GARAGE AREA $2270.00 Same Steps as Item #2. DocuSign Envelope ID:B89815E8-8618-4924-BF60-62CF5D2760D4 DESCRIPTION Remove all debris from premises, and throughout the job, continue cleanup and keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR. Please use reasonable caution during the installation process: do not walk or drive under active work or on areas of potential roofing debris. Installations are weather permitting; inclement weather will cause scheduling delays. Peak Performance Roofing LLC will obtain the building permit. Total: $4595 A one-third deposit of$1531 will secure contract,permitting, material order, and priority scheduling. The balance shall be due upon completion, within 10 days of invoice. Accounts outstanding over 30 days subject to 2% finance charge monthly. DISCLAIMERS 1)LEAKING CHIMNEY Peak Performance Roofing takes measures to prevent water penetration at the chimney-roof connection by installing high-quality flashing. However, leaks that stem from the chimney structure itself, particularly in adverse weather conditions like diagonal, wind-driven rain are not covered under our 5-YEAR labor warranty. Homeowners are encouraged to arrange for ongoing chimney care and repair with a certified mason. 2) PROJECT MAP IT Upon signing, you consent to have your project included on our public work map after completion. This project entry will only be used to aid future customers in their decision-making process. Only non- sensitive,public information will be shown. Please inform us if you would like to opt out. Thank you for choosing Peak Performance Roofing! TOTAL $4,595.00 e—DocuSigned by. ju&. wf,►guy 6/4/2024 Accepted By `-9E6A02$61291403 Accepted Date DocuSign Envelope ID:B89815E8-8618-4924-BF60-62CF5D2760D4 What if I have an urgent question? If you have an urgent issue outside of regular office hours, call or text your project manager directly on his cell. Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying sheathing. Your contract states we will replace a small amount of plywood at no additional cost if needed. If more serious issues are found, the project manager will contact you to explain. There may need to be an upcharge on the final bill, consistent with the per sheet or square foot amount quoted in your estimate. Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done, we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew may need to leave before cleaning up, or if the job ends midday, they may leave to start another job. Another staff person will come later or the next day for more cleaning. There are materials left over. Did I get charged for those? Your job is priced according to the measurements. We always bring extra material for the jobsite, just to be safe. You were not charged for those and we will be collecting them. One of our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days. When will the dumpster be removed? The dumpster is usually removed the next business day after the main crew has finished. Weekends or holidays may delay pickup. The dumpster company should check for any debris after removal. but please do a visual check before walking or driving over the area where the dumpster was located. If you see any debris there, please let us know. The job is done but I have concerns, what should I do? Please be aware that even after the main installation crew has left, that doesn't mean our job is done. The project manager will be coming by as soon as possible to do a final inspection, and a staff person will come by to do a final sweep, and pickup leftover items. Depending on our schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days after main installation is complete. If you have any other questions, please let us know. Thank you for choosing Peak Performance Roofing! We will do our very best to make this major home improvement a smooth experience for you! 11..u5 gna , ku I.U�r,•.rr 6/4/2024 • a 1 Lovefield St., Easthampton MA 01027 p E - K. -5888 M-F gam-4 PERFORMANCE 413-203 m p ROOFING peakperformanceroofinglIc@gmail.com DocuSign Envelope ID:B89815E8-8618-4924-BF60-62CF5D2760D4 The Roofing Process : What to Expect When will my roof be scheduled? Once the contract, deposit, and building permit are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of our crew is a priority. We must work around the weather forecast; here in New England, this means we can't plan our schedule very far in advance, and can't promise specific installation dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and patience in our dealings with Mother Nature! Your project manager will contact you a few days before they wish to proceed. Our crews are hardworking and efficient; most residential installations take only 1-2 days to install. Do I need to do anything to prepare? As noted on your contract, we are not responsible for dirt/debris that may fall into the attic. Depending on the condition of the plywood. you may see little to no debris, or it could be more substantial. If you store items in the attic, we recommend covering with plastic sheeting. Do I need to notify my neighbors? If your home is extremely close to other homes or driveways, there's a possibility we may need to be on their property temporarily to lay protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a courtesy. Your neighbors will likely appreciate notification of the noise/traffic. Materials and Dumpster Delivery: The materials and dumpster may arrive the day before the scheduled installation (especially if your installation is taking place on a weekend). Depending on your home's layout and driveway(s), we may need vehicles moved at this point. Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL driveways, and away from the house, to avoid any damage, and for our access. How early will you start? Our crews will begin as early as 7.30am. They will work a long day, often until dark if necessary. We aim to have the installation completed in as few days as possible to minimize disruption to you and your neighbors. Do I need to be home? It's up to you. Some customers like to keep an eye on what's going on. Others would rather not be home because of the noise. Be aware that roofing is loud (banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets. Please do not plan on outdoor activities while we are working, for safety's sake. Please keep pets inside, or on a leash away from the roofing activities.