Loading...
32A_241J 115 Bridge Street Conservation (2)--·------- July 15, 2006 Memo to the Conservation Commission: Dear Sirs: I am submitting an amendment to the recent "Notice of Intent" for I 15 Bridge Street in Northampton. After receiving approval (Notice of Conditions) to do the work in the proposal, I was informed that the work could cause erosion of the banks adjacent to the floodplain and it was recommended that I build retaining walls to support the banks. The attached schedule and site plan includes retaining walls the compensatory storage calculations for the walls. The schedule and storage calculations were produced by Huntly Engineering. Thank you for your consideration. Tom Horton 115 Bridge Street Northampton, MA 01060