Loading...
32A_241H 115 Bridge Street Zoning�J Print Form CITY OF NORTHAMPTON ZONING BOARD OF APPEALS FINDING APPLICATION 1 r r<-_3 J ll JUL 1 4 2006 CITY CL.- K: l OFFICE NORTHAMPTON MA 01060 Applications WILL NOT be accepted without all of the following information. It is recommended that you meet with the Senior Planner to review application materials prior to submission. For an appointment, please call the Office of Planning & Development at 413-587-1287. Change of a Legally Pre -Existing Non -Conforming Use or Structure t Permit is requested under Zoning Ordinance Section: ,1 Page: From Building Inspector's Review form 2. Address: 1 ' -5 Fk Assessor Identification: 7_4 7' Parcel 41 (if applicable) Recorded in Hampshire Registry of Deeds or Land Court Book: Page: 3. Applicant's Information 4.Owner Information (if different from Applicant) Name �� VVA 1 oiq 1, Address _fc, ` i U WNe, V 1 �A t5 1�1��� ' t� ``�'� 0 \ oc a Telephone g 4-16 S 96 ^ VA 5 Email ( COvv� o � 0 C A0, Oeqlg--O Fax Status of (— Owner Contract Purchaser Applicant �-- Lessee Other: Date �^ Owner's Signature* Date% eo Applicant's Sign -re .� 10 �b I certify: the information contained herein is true nd ccurate to the best of my knowledge; the above sign d owner(s) grant the Board and its agents permission to enter the property to review this application; I understand all documents will be entered into the public record and will be available on the internet; I understand that if neighboring issues have not been addressed/ resolved prior to the hearing, the Board will continue the hearing. * Owner's signature or letter from owner authorizing applicant/representative to sign on benau or owner. 3/28/2005 003.pdf FOR OFFICE USE: Distribute to: Sr. Planner ; Building ; DPW (2); Fire ; Police ; BOH . Please review & send comments to the Sr. Planner. The tentative meeting date is 2nd Thursday ; 4th Thursday of Jan. Feb. ; March ; April ; May ; June ; July ; Aug. ; Sept. : Oct. ; Nov. ; Dec. • 5. Check boxes below indicating that you have attached/included the following documentation: Sketch Plan OR Site Plan showing abutting property surrounding site. Filing Fee made Payable to the City of Northampton ($200.00). j Stamped, Self Addressed Envelope(s) to Owner and Applicant. Two separate rubberbanded sets of stamped envelopes addressed to each of the abutters within 300' and the planning boards within adjacent towns. The abutters list can be found at www.northamptonma.gov/opd within 300' of a neighboring town, the envelopes must include the abutters within said town. The return address of all the envelopes should be labeled as: Planning and Development, City of Northampton, City Hall, 210 Main Street, Room 11, Northampton, MA 01060-3198. I'A A printed list of all abutters (from above section). Number of Abutters on the list is: Z �— %V 12 complete packages (original & I copies). Each packet must include all application material and be collated, stapled and banded together. Zoning Permit Review Form with Building Inspector's endorsement & Application. �] Folded Plans - all plans of I Ix17 or larger must be folded (If 36x24 plan sheets are included, they may (� contain 6 full sets with the remaining 5 at 1 I x17 size) and collated with each application. If �_ Alk��� P_'o4� as I understand that it is required that I take this application to get date stamped at the City Clerk's Office first, prior to filing it with the Northampton Planning and Development Office. 6. Narrative Description of Proposed Work/Project: (use additional sheets if necessary) 4DD )-no7( --m n4rz1 i1X3 t QL,7�,C6 Arr WS i3R%'04'F State How Work/Proposal Complies with the following Finding Criteria: (see also Section 9.2) a) Explain why the existing building, lot or use is legally pre-existing non -conforming. (Buildings, lots or uses that are in existence at the time new zoning is enacted are protected under grandfathering provisions) The barn was originally a principal structure for a principal use on the property. So given that there were two principal uses, a farm and a residence, the two structures and their setbacks should be reviewed accordingly. Under section 6.2 URC dimensional requirements for "any other allowed use not listed above", the side setback is 10'. Thus it is pre-existing, non -conforming for the side setback of a conforming principal use. Since the setback for attached accessory structures used only as workshop, garage, or storage requires the same side setback of 10', changing from a barn/farm use to an attached accessory garage that requires the same side setback would not create a new non -conformity. b) Does the change, extension or alteration create a new violation of the zoning, which would require a variance? F Yes No If Yes, explain c) Explain how the change, extension or alteration shall not be substantially more detrimental than the existing nonconforming use to the neighborhood: —,VKd' r'oW 'Noo s ►+er- i3t= epimdlCLZ \ W l'tA \s`� 2eQ�J\(X0 S .t'- -1> ACV_i5 0 !�=- 7�Tue5 a-JA'T Z, o3�\ � �\ - w La. SOT CcSTtiS't i�t7'ft� Ar 003. pdf 2 3/28/2005 . File # MP-2006-0118 • APPLICANT/CONTACT PERSON TIMOTHY STOKES ADDRESS/PHONE 20 TURKEY HILL RD (413) 695-2264 Q PROPERTY LOCATION 115 BRIDGE ST MAP 32A PARCEL 241 001 ZONE URA LE �71;LU 1 4 2006D _ —. CITY CL_,E i<S OFFICE NOFITHA101P-1 ON MA 01060 THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building,Permit Filled out Fee Paid Typeof Construction: connect residence to barn no bedroom or sleeping quarters in barn New Construction Non Structural interior renovations Addition to Existing Accessoly Structure iiiii1ding Plans Included: Owner/ Statement or License 3 sets of Plans / Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRE§RNTED: Approved //Additional permits required (see below) PLANNING BOARD PERMIT REQUIRED UNDER: § Intermediate Project : Site Plan AND/OR Special Permit with Site Plan Major Project: Site Plan AND/OR Special Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § -! 3 _ Finding L..-1 Special Permit Variance* Received & Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Septic Approval Board of Health Water Availability Sewer Availability Permit from Conservation Commission Permit from Elm Street Co ssion Signature of Building Official Well Water Potability Board of Health ,ct�,✓ c o„ii�orp,..z..� 4. ST,e&<TaQ� Permit from CB Architecture Comn>ittee Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of Planning & Development for more information. JUL 1 4 2006 L File No. CITY C'S OFFICE Please type or print all information and return this form to the BuBdi-n Inspector's Qf ice with the $15B or fee (check- on-noney order-) payable to the City ofNorthamptoi2 1. Name of Applicant: 1 • w— Address: 70 v Z 7 , �'ti� 1 q 1 elephone: �`� % ���{ `( 2. Owner of Property:- C) V,\ Address: t-A S Telephone: 3. Status of Applicant Owner Contract Purchaser Lessee Other (explain) UJ 4. Job Location:__. i 1>°R��17C4'6 1. Existing Use of Structure/Property:_ S 11)w i xl ,� 6. Description of Proposed Us-a/VJork✓Project/Occupation: (Use additional sheets if necessary): ,��9yS.�ff, 7. Attached Plans: Sketch Plan Site Plan Engineered/Surveyed Plans a. Has a Special Permit/Variance/Finding e -r been issued for/on the site? NO DONT KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DON'T KNOW YES IF YES: enter Book Page and/or Document r 9.Does the site contain a brook, body of water or wetlands? NO DONT KNOW_ YE IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained date issued: (Form continues on other Side) V�':1Doltm�tslFORN'.S1o�sina11Bm7dina IrspectorZoaiae-Paaiit-AvoIica�on-Dassivadoc 8/412004 a 0. Do any signs e;:ist on the property? YES NO IF YES, describe size, type and location: Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: 11. W11 the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES . NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 2 ALL INFORMATEON MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFOP� I ONlE=n Teed for use by the Scalding FISTING PROPOSED - Lot Size Frontage I1501 l So — Setbacks Front 3571 L1 Side 1. j r R: /.k r ' O R- 6 3 t r<: ,L l Rear�4 Building Height �D Building Square Footage p Open Space: (lot area ` minus building & paved parking 1 # of Parking Spaces A t of Loading UocKs Fill: (volume & location) 13. Certi ication: I hereby certify Drat the information contained herein"_ e and ac^arate io the best of y knowledge. Date: G `� Applicant's Signature' NOTE: issuance of a zoning permit does not relieve an applicant's burden to co ng pmply with all zoning requirements and -i all required permits from the Board of Health, Conservation Commission, ti Historic and Architectural Boards, Department of Public Works and other applicable permit a ariting authorities. C':S�octmtentc`� OF.iv'S\ori:irca+'w�-v�ldina-Inr�ect�,7�nma �=:mit-.�.p�:i�or.-p�s;ce.do�