LA Construction Control Document Initial - Prospect Place-` Initial Construction Control Document
To be submitted with the building permit application by a
Registered Design Professional
r
for work per the ninth edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Prospect Place Family Housing Date:03-18-2024
Property Address: 737 Bridge Road, Northampton, MA 01002
Project: Check (x) one or both as applicable: New construction X Existing Construction
Project description: 737 Bridge Road, an existing 67,976 sq ft, 2 story brick building previously used as a
nursing home, is being renovated to provide 60 affordable family apartments.
I Rachel Loeffler, MA Registration Number: 1617 Expiration date: 01-2025 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning':
Architectural Structural
Fire Protection Electrical
Mechanical
Other: Landscape Architecture
for the above named project and that to the best of my knowledge, information, and belief such plans,
computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780
CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my
designee) shall perform the necessary professional services and be present on the construction site on a regular
and periodic basis to:
1. Review, for conformance to this code and the design concept, shop drawings, samples and other
submittals by the contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work is being performed in a manner consistent
with the approved construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
When required by the building official, I shall submit field/ progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a 'Final Construction C0 rI �tx;nent'.
P......... S` i
�•GNEL toF'���/i
Enter in the space to the right a "wet" or.:
electronic signature and seal: / --
Phone number: 413-582-7000 x119 Email: rachel@berkshiredesign.com. . ti �
Building Official Use Only
Building Official Name: Permit No.: Date:
Note 1. Indicate with an 'x' project design plans, computations and specifications that you prepared or directly supervised. If 'other' is
chosen, provide a description.
Version 01 01 2018