Loading...
06-M-SCI02.Conformed Electrical- Prospect Place-100% CD Building_Permit_SetACAIR CONDITIONING UNITAFFABOVE FINISH FLOORAFCABOVE FINISH CEILINGAHUAIR HANDLING UNITBODBOTTOM OF DUCTBOTBOTTOMCACOMBUSTION AIRCBVCIRCUIT BALANCING VALVECOCLEAN OUTCPCONDENSATE PUMPCUCONDENSING UNITCHCABINET HEATERDCWSDOMESTIC COLD WATER SUPPLYDHWSDOMESTIC HOT WATER SUPPLYDHWRDOMESTIC HOT WATER RETURNDNDOWNEAEXHAUST AIREDHELECTRIC DUCT HEATEREERENERGY EFFICIENCY RATIOEFEXHAUST FANERVENERGY RECOVERY VENTILATORETEXPANSION TANKEUHELECTRIC UNIT HEATEREXIST.EXISTING.FC.FLEXIBLE CONNECTIONFCUFAN COIL UNITFLFLOORFDFIRE DAMPERFTRFIN TUBE RADIATIONHCHEATING COILHPHORSEPOWERHVHEATING AND VENTILATING UNITHTWHIGH TEMPERATURE WATERHTWSHIGH TEMPERATURE WATER SUPPLYHTWRHIGH TEMPERATURE WATER RETURNLDLINEAR CEILING DIFFUSERLBS/HRPOUNDS PER HOURMWMAKE-UP WATERMAX.MAXIMUMMIN.MINIMUMNOM.NOMINALOAOUTDOOR AIRPPUMPPRVPRESSURE REDUCING VALVERARETURN AIRRFRETURN FANRHRELATIVE HUMIDITYS&RSUPPLY AND RETURNSASUPPLY AIRSDSMOKE DAMPERSPSTATIC PRESSURESUSP. CLG.SUSPENDED CEILINGUHUNIT HEATERUVUNIT VENTILATORVDVOLUME DAMPERVFDVARIABLE FREQUENCY DRIVES.G. SUCTION GUIDET.D.V.TRIPLE DUTY VALVEN.C.NORMALLY CLOSEDN.O.NORMALLY OPENPOWER LEGENDGENERAL ELECTRICAL NOTES1.ALL ELECTRICAL WORK SHALL CONFORM WITH THE NATIONAL ELECTRICAL CODE (NEC), AND APPLICABLE FEDERAL, STATE AND LOCAL CODES. CONTRACTOR SHALL SECURE PERMITSAND PAY THE FEES REQUIRED TO CARRY OUT HIS WORK.2.THE DRAWINGS AND SPECIFICATIONS INDICATE THE INTENT OF THE DESIGN AND SHALL BE CONSIDERED AS DIAGRAMMATIC ONLY. EXACT LOCATIONS FOR OUTLETS AND EQUIPMENTSHALL BE DETERMINED AT THE SITE, AS WORK PROGRESSES, DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE CONTRACTOR AT THE SITE. FINAL WORK SHALL BEDOCUMENTED ON AS BUILT RECORD DRAWINGS.3.PIPING, CONDUITS AND EQUIPMENT OF ALL TRADES SHALL BE PROPERLY COORDINATED AND SET TO MAINTAIN THE CLEARANCES REQUIRED BY APPLICABLE FEDERAL, STATE, AND LOCALCODES.4.CONDUIT RUNS CROSSING EXPANSION JOINTS SHALL HAVE EXPANSION OR EXPANSION DEFLECTION TYPE FITTINGS, AS REQUIRED VERIFY EXISTING JOINTS BY FIELD MEASUREMENTS.5.RACEWAYS AND CABLE SHALL BE RUN CONCEALED IN FINISHED SPACES UNLESS OTHERWISE NOTED.6.SERVICE EQUIPMENT, LOAD CENTERS, PANELBOARDS, AND METER CENTERS SHALL BE PROVIDED WITH DEDICATED WORK SPACE. THE HEIGHT OF THE WORK SPACE SHALL EXTEND FROMFLOOR TO A HEIGHT 6'-6'' OR TO THE HEIGHT OF THE NEW EQUIPMENT, WHICHEVER IS GREATER. THE WIDTH OF THE WORKING SPACE SHALL BE THE WIDTH OF THE ELECTRICALEQUIPMENT OR 30'' , WHICHEVER IS GREATER. IN ALL CASES, WORK SPACE SHALL ALLOW AT LEAST A 90 DEGREE OPENING OF EQUIPMENT DOORS OR HINGED PANELS.7.ALL LOAD CENTERS, PANELBOARDS, AND METER CENTERS SHALL BE LOCATED IN DEDICATED SPACES AND PROTECTED FROM DAMAGE. THE DEDICATED ELECTRICAL SPACE SHALL BEEQUAL TO THE WIDTH AND DEPTH OF THE EQUIPMENT AND EXTENDING FROM THE FLOOR TO A HEIGHT OF 6'-0'' ABOVE THE EQUIPMENT OR TO THE STRUCTURAL CEILING, WHICHEVER ISLOWER. NO PIPING, DUCTS, OR EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR ARCHITECTURAL APPURTENANCES SHALL BE PERMITTED TO BE INSTALLED IN, ENTER OR PASSTHROUGH SUCH SPACE.8.WIRING DEVICES SHALL BE MOUNTED IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE ARCHITECTURAL ACCESS BOARD.9.ALL RECEPTACLES INSTALLED IN UNFINISHED AREAS SHALL BE GFI TYPE, MOUNTED 4'-0'' ABOVE FINISHED FLOOR.10.EXIT SIGNS AND EMERGENCY BATTERY UNITS AND LIGHTING FIXTURES DESIGNATED AS NIGHT LIGHTS SHALL BE UNSWITCHED.11.EXACT LOCATIONS OF RECEPTACLES, SWITCHES, LIGHTING FIXTURES, SMOKE DETECTORS, ETC. SHALL BE DETERMINED IN THE FIELD AND COORDINATED WITH ARCHITECTURALDRAWINGS.12.CONTRACTOR SHALL VERIFY ALL DOOR SWINGS BEFORE INSTALLING SWITCH BOXES.13.FOR EXACT LOCATION OF LIGHTING FIXTURES, SEE ARCHITECTURAL REFLECTED CEILING PLAN DRAWINGS.14.ELECTRICAL CONTRACTOR IS TO COORDINATE THE EXACT LOCATION OF LIGHTING FIXTURES IN MECHANICAL AND STORAGE AREAS WITH OTHER TRADES.15.UNLESS NOTED OTHERWISE, ALL DATA AND TELEPHONE CABLING SHALL BE BY OTHERS. ELECTRICAL DRAWINGS INDICATE RACEWAY AND BACKBOX SYSTEMS ONLY AND INDICATETEL/DATA OUTLET CONFIGURATIONS FOR REFERENCE ONLY.16.MEP COORDINATION:a.ALL ELECTRICALLY POWERED HVAC, PLUMBING AND FIRE PROTECTION EQUIPMENT TO BE PROVIDED WITH LOCAL DISCONNECT SWITCHES. THE SWITCHES SHALL BE PROVIDED BYTHE ELECTRICAL CONTRACTOR UNLESS NOTED OTHERWISE.b.LINE VOLTAGE THERMOSTATS SHALL BE SUPPLIED BY THE MECHANICAL CONTRACTOR, INSTALLED AND WIRED BY THE ELECTRICAL CONTRACTOR.c.DUCT MOUNTED SMOKE DETECTORS: ARE TO BE SUPPLIED BY THE ELECTRICAL CONTRACTOR (FIRE ALARM EQUIPMENT SUPPLIER), INSTALLED IN THE DUCTWORK BY THE HVACSUBCONTRACTOR. WIRED BY THE ELECTRICAL CONTRACTOR.d.THE ELECTRICAL CONTRACTOR SHALL COORDINATE THE EXACT LOCATIONS OF THE PLUMBING, HVAC AND SPRINKLER SYSTEM DEVICES IN THE FIELD PRIOR TO ROUGH IN.e.ALL EXTERIOR DISCONNECT SWITCHES AND THERMAL SWITCHES SHALL BE RATED NEMA 3R.f.PROVIDE WEATHERPROOF RECEPTACLES WITH WHILE-IN-USE COVERS FOR ALL EXTERIOR OUTLETS.g.FOR EXACT LOCATION OF MECHANICAL EQUIPMENT, (AC UNITS, FANS, PUMPS, ETC.) REFER TO RESPECTIVE TRADES DRAWINGS.17.BRANCH CIRCUIT WIRING:a.WIRING SHOWN ON DRAWINGS IS FOR SPECIFIC ROUTES OR SPECIAL CONDITIONS.b.WIRING AND CONDUIT SHALL BE REQUIRED BETWEEN ALL OUTLETS INDICATED WITH CIRCUIT NUMBERS AND PANEL DESIGNATIONS.c.ALL SWITCH CONTROLS SHALL BE PROVIDED WITH WIRING AND CONDUIT AS REQUIRED.d.ALTHOUGH ALL BRANCH CIRCUIT WIRE AND CONDUIT IS NOT SHOWN, IT IS THE INTENT OF THESE DRAWINGS THAT A COMPLETE BRANCH CIRCUIT WIRING SYSTEM BE INSTALLED.e.ALL 120V SINGLE PHASE CIRCUITS SHALL HAVE DEDICATED NEUTRALS. NO SHARED NEUTRALS WILL BE ALLOWED EXCEPT WHERE NOTED FOR WORKSTATIONS.f.ALL BRANCH CIRCUITS, (LIGHTING AND POWER) SHALL HAVE A DEDICATED NEUTRAL CONDUCTOR. COMMON OR SHARING OF NEUTRALS WILL NOT BE ALLOWED. NO MORE THAN (3)CIRCUITS (SIX CURRENT CARRYING CONDUCTORS) SHALL BE RUN IN A SINGLE CONDUIT EXCEPT WHERE NOTED FOR WORKSTATIONS.g.CURRENT CARRYING MATERIAL USED SHALL BE COPPER OR ALUMINUM AS SPECIFIED, INCLUDING PANELBOARD BUS MATERIALS.h.FURNISH GROUNDING/BONDING BUSHINGS ON ONTO ALL CONDUIT ENTERING/LEAVING BOXES.i.ALL GROUND CONDUCTORS SHALL BE GREEN, ISOLATED GROUND CONDUCTORS SHALL BE GREEN/YELLOW STRIPPED, AND NEUTRAL CONDUCTORS SHALL BE WHITE.18.CONTRACTORS SHALL PREPARE AND SUBMIT COORDINATED SHOP DRAWINGS FOR OWNER'S, ARCHITECT'S AND ENGINEER'S REVIEW. NOTE THAT CONTRACT DRAWINGS ARE SCHEMATICONLY, AND CONTRACTOR SHALL NOT SCALE DRAWINGS OR BUILD FROM AS SHOWN.a.CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL FIELD CONDITIONS AND INSTALL EQUIPMENT AND SYSTEMS TO MEET ALL REQUIRED CLEARANCES AND PROVIDES ALLNECESSARY ACCESS. CONTRACTOR SHALL FIELD DETERMINE FINAL LOCATIONS AND ELEVATIONS THAT BEST SUITS THE NEEDS OF THE PROJECT.b.COORDINATED SHOP DRAWINGS SHALL BE DRAWN TO A SCALE NOT SMALLER THAN 3/8 INCH EQUALS 1 FOOT. DRAWING SHEETS SHALL BE SAME SIZE AS THE CONTRACT DRAWINGS.COORDINATED SHOP DRAWINGS SHALL DEPICT FABRICATION, ASSEMBLY, AND INSTALLATION DETAILS. DRAWINGS SHALL SHOW EQUIPMENT/SYSTEM PLANS, ELEVATIONS ANDSECTIONS. DETAILS OF COMPONENTS, AND ATTACHMENTS TO OTHER WORK SHALL ALSO BE INCLUDED.c.THE MC SHALL PREPARE A FIRST SUBMISSION OF DUCTWORK SHOP DRAWINGS TO 3/8" SCALE. THESE DRAWINGS ARE TO INCORPORATE ALL DUCTWORK (INCLUDING BOTTOM OFDUCT ELEVATIONS), EQUIPMENT AND ACCESSORIES AS SPECIFIED AND SHOWN ON THE CONTRACT DRAWINGS. ALL EXISTING AND PROPOSED PENETRATIONS THROUGH WALLS,FLOOR AND DECKS MUST BE SHOWN ON THE DRAWINGS.d.ALL CONFLICTS WITH BUILDINGS' CONSTRUCTION WILL BE RESOLVED BY THE GC/CM. THE MC WILL THEN FORWARD THE DUCTWORK SHOP DRAWINGS TO THE GC/CM. THE GC/CM WILLFORWARD THE DUCTWORK SHOP DRAWINGS TO THE PC.e.THE PC WILL INCORPORATE HIS/HER SCOPE OF WORK ON THE 3/8" DUCTWORK SHOP DRAWINGS ILLUSTRATING ALL PLUMBING EQUIPMENT, PIPING, HANGERS, ETC. THE GC/CM WILLFORWARD THE FINAL DUCTWORK/PLUMBING/ MC SHOP DRAWING TO THE EC.f.THE EC WILL INCORPORATE ALL ELECTRICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO LIGHT FIXTURES, SWITCHGEAR, CONDUIT & HANGERS. THE GC/CM WILL FORWARD THEFINAL DUCTWORK/PLUMBING/MC/EC SHOP DRAWINGS TO THE FIRE PROTECTION CONTRACTOR (FP).g.THE FP WILL INCORPORATE ALL SPRINKLER EQUIPMENT, PIPING, HANGERS AND SPRINKLER HEADS AS REQUIRED BY CODE. GC/CM SHALL THEN, AND ONLY THEN, DISBURSE TO THEDESIGN TEAM FOR REVIEW.19.ANY PIPING, DUCTS OR CONDUIT THAT PENETRATE RATED WALL, CEILING OR FLOOR ASSEMBLIES SHALL BE SEALED WITH APPROVED FIRESTOPPING MATERIAL TO MAINTAIN FIRE RATINGAS REQUIRED BY CODE. PENETRATIONS THROUGH NON-RATED ASSEMBLIES MAY BE SEALED WITH SILICONE CAULK. ALL PLUMBING, ELECTRICAL AND HVAC PENETRATIONS MUST BESEALED BY THE RESPECTIVE TRADE CONTRACTOR.20.ELECTRICAL BOXES MUST BE SEALED TO DRYWALL AROUND THE PERIMETER AND ALL HOLES WITHIN THE ELECTRICAL BOX ITSELF MUST BE SEALED WITH PUTTY OR DUCT SEALINGMASTIC.21.AS PART OF TEMPORARY POWER AND LIGHTING (SECTION 260547), CONTRACTOR SHALL PROVIDE TEMPORARY EMERGENCY LIGHTING TO COMPLY WITH 527 CMR 1.00, NFPA 241.22.SEAL ALL PENETRATIONS AT UNIT DEMISING AND CORRIDOR WALLS/CEILINGS.1.ALL WORK SHALL BE INSTALLED IN FULL ACCORDANCE WITH LOCAL, STATE & FEDERAL CODES, STATE AND LOCAL AUTHORITIES IRRESPECTIVE OF THE FIRE ALARM DEVICES SHOWN ONTHE DRAWINGS. FILE ALL PLANS, OBTAIN ALL PERMITS, PAY ALL FEES, SCHEDULE ALL INSPECTIONS, MAKE ALL TESTS AND OBTAIN ALL APPROVALS REQUIRED. THE FIRE ALARM WORKSHALL BE PERFORMED IN ACCORDANCE WITH THE ADOPTED EDITIONS OF NFPA-72, NATIONAL ELECTRIC CODE AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL COMPONENTSSHALL BE UL LISTED.2. EC SHALL RETAIN THE SERVICES OF FAS VENDOR FOR TESTING & COMMISSIONING OF DEVICES. COORDINATE EXACT SCOPE OF WORK, INCLUDING CONNECTION TO FACP, POWERSUPPLIES, ETC.4. ALL VISUAL DEVICES SHALL BE SYNCHRONIZED AS PER NFPA 72.5. DUCT SMOKE DETECTORS SHALL BE PROVIDED WITH A REMOTE TEST SWITCH IN A LOCATION ACCEPTABLE TO THE FIRE DEPARTMENT. COORDINATE EXACT LOCATION WITH THE FIREDEPARTMENT PRIOR TO INSTALLATION.6. CIRCUIT BREAKER FOR FIRE ALARM SYSTEM DEVICES SHALL HAVE RED MARKING WITH A CIRCUIT BREAKER LOCK LISTED FOR USE WITH THE CIRCUIT BREAKER. LOCATION OF FIREALARM SYSTEM DEVICE CIRCUIT DISCONNECTING MEANS SHALL BE PERMANENTLY IDENTIFIED AT THE FIRE ALARM CONTROL UNIT.FIRE ALARM NOTESKEYED EQUIPMENT LEGENDTYPICAL ABBREVIATIONSPKBSSSSOSK3FSMSTHJTSFSKFINT1MAIN BUILDING INTERCOM PANELKEY FOB SENSORFLOW SWITCHTAMPER SWITCHDRYER OUTLET, NEMA 6-30RJUNCTION BOXWALL-MOUNTED EMERGENCY LIGHTGROUND FAULT CIRCUIT INTERRUPTER RECEPTACLEFIRE ALARM ANNUNCIATOR PANELFIRE ALARM CONTROL PANELWALL TELEPHONE JACK MOUNTED 18-INCHES AFF-(2) PORTS FOR DATA USESMOKE DETECTORFIRE ALARM HORN/STROBE FIRE ALARM STROBE UNIT- PROVIDE PENDANT WHERE REQ'D- BRACKET INDICATES WALL MOUNTING.- ARROWS INDICATE DIRECTION,EXIT/DIRECTIONAL SIGNS- SHADE SECTIONS INDICATES 1 OR 2 FACESWALL-MOUNTED OCCUPANCY SENSORKEYED SWITCHTHREE-WAY TOGGLE SWITCHSINGLE-POLE SWITCHQUADRUPLEX CONVENIENCE OUTLETS IN ONE BOXDATA/TELECOMMUNICATIONS OUTLET MOUNTED 18-INCHES AFF DUPLEX CONVENIENCE OUTLET- 2#12+G MIN.- INSTALLED IN BURIED CONDUITBRANCH CIRCUIT CONDUCTORS AND RACEWAY- INSTALLED CONCEALEDBRANCH CIRCUIT CONDUCTORS AND RACEWAYHOMERUN TO PANELBOARD KNOX BOXPULL STATION WITH VANDAL SHIELD & SOUND ALERTHEAT DETECTORTENANT INTERCOM STATIONINT2T1-PROVIDE 120V CIRCUIT TO EACH LOCATION-FURNISH, INSTALL & WIRE SENSORPANELBOARD-MOUNT IN ACCORDANCE WITH MAAB FUSED DISCONNECT SWITCH (600V)- FURNISHED BY MC FOR INSTALLATION BY ECDISCONNECT SWITCH (UNFUSED, 600V) DISCONNECT SWITCH (UNFUSED, 600V)ELEVATOR RECALL SMOKE DETECTORECOPPER (NON-DIGITAL) PHONE LINE FOR ELEVATOROR FIRE ALARMX- INDICATES QUANTITY OF PHONE LINES REQUIREDEC SHALL COORDINATE WITH OWNER'S REPXCEILING MOUNTED OCCUPANCY SENSOROSAPPLIANCE OUTLET- FURNISHED & INSTALLED BY ECMOTOR RATED SERVICE SWITCHSMMOTOR RATED TOGGLE/DISCONNECT SWITCH- FURNISHED & INSTALLED BY ECFAANFACPSMOKE DETECTOR W/ LOW FREQUENCY SOUNDER BASESB& UFAS REQUIREMENTS-MOUNT IN ACCORDANCE WITH MAAB & UFAS REQUIREMENTSDASBI-DIRECTIONAL AMPLIFIER FOR DASBDAFD - ASSIGNED TO FIRE DEPARTMENT FREQUENCIESPD - ASSIGNED TO POLICE DEPARTMENT FREQUENCIESPUBLIC SAFETY DISTRIBUTED ANTENNA SYSTEM(DAS) ANTENNA-EXACT LOCATION AND QUANTITIES TO BE IN ACCORDANCE WITH APPROVED MANUFACTURER'S SHOP DRAWING SUBMITTALSSS1.DATA/TELECOMMUNICATIONS:a.TELEPHONE WIRING AND CABLING (BY EC) SHALL BE BROUGHT FROM HEAD END EQUIPMENT (EQPT. BY THE RESPECTIVE SYSTEM VENDOR) TO BACK BOXES (BY EC) WITH TELE/DATA JACKS(BY EC) IN LOCATIONS INDICATED ON ELECTRICAL DRAWINGS. EC SHALL INSTALL BACKBOXES WITH RACEWAY PER CATV/DATA/TELECOMM ROUGH-IN DETAIL.b.OWNER SHALL COORDINATE NEW TELEPHONE/DATA SERVICE WITH THE TELECOMMUNICATION/DATA SERVICE PROVIDER, WHO WILL PROVIDE EXTERIOR WALL MOUNTED NID ANDUNDERGROUND FEED.c.EC SHALL FURNISH AND INSTALL, WHERE SHOWN ON THE DRAWINGS, OUTLETS AND WIRING TO MAKE A COMPLETE SYSTEM READY FOR CONNECTION TO TELEPHONE/DATA EQUIPMENT TO BEINSTALLED.d.EACH TELEPHONE/DATA OUTLET SHALL CONSIST OF TWO (2) RJ45 MODULAR JACKS, IVORY, 4 CONDUCTOR WITH LABELS.e.EACH MODULAR JACK SHALL BE WIRED WITH CAT6, 6 PAIR CABLE TO TELEPHONE NETWORK INTERFACE DEVICE (NID), LOCATED IN MAIN ELECTRICAL ROOM, AND TERMINATED BYTELECOMMUNICATION/DATA SERVICE PROVIDER.f.SERVICE FEE FOR UTILITY WORK SHALL BE PAID FOR BY THE OWNER.2.CABLE TELEVISION (CATV):a.OWNER SHALL ARRANGE FOR AND COORDINATE THE CABLE TELEVISION SERVICE INSTALLATION WITH THE CABLE TV SERVICE PROVIDER. ANY CHARGES FROM VENDOR SHALL BE PAID BY THEOWNER.b.THE CABLE TV SERVICE PROVIDER WILL FURNISH AND INSTALL THE SERVICE TO THE BUILDING, AS WELL AS THE SERVICE CABINET WITH ITS AMPLIFIERS, SPLITTERS, AND APPURTENANCES.c.EC SHALL FURNISH AND INSTALL ALL REQUIRED DISTRIBUTION CABLE WITHIN THE BUILDING PLUS SPLITTERS, CONNECTORS, AND OTHER REQUIRED HARDWARE. THE INSTALLATION SHALLCOMPLY WITH THE CABLE TV SERVICE PROVIDER STANDARDS.d.EACH DWELLING UNIT SHALL BE FED INDEPENDENTLY (HOME RUN) FROM THE SERVICE CABINET.e.EC SHALL MAKE ALL FINAL CONNECTIONS TO SPLITTERS, AMPLIFIERS, ETC., AND TO TV WALL OUTLETS UNLESS DIRECTED OTHERWISE BY CATV PROVIDER.3.EC SHALL FURNISH AND INSTALL ALL EQUIPMENT, RACEWAYS, CABLES AND WIRING ASSOCIATED WITH DOOR INTERCOM SYSTEMS AND ACCESS CONTROLS SYSTEMS.4.THE GC SHALL BE RESPONSIBLE FOR COORDINATION OF WORK WITH THE EC, THE CATV COMPANY AND TELECOMMUNICATION PROVIDER TO ENSURE THAT ALL TELEPHONE AND OTHER SPECIALSYSTEMS WIRING IS INSTALLED BEFORE GYPSUM BOARD CEILINGS ARE IN PLACE.5.UNLESS NOTED OTHERWISE, ALL RACEWAYS, DATA AND TELEPHONE CABLING SHALL BE BY EC. ELECTRICAL DRAWINGS INDICATE LOCATIONS OF OUTLETS ONLY. THE GENERAL CONTRACTOR ISRESPONSIBLE FOR COORDINATION OF WORK WITH THE DATA/TELE COMPANY AND OWNER'S TELECOMMUNICATION PROVIDER TO ENSURE THAT ALL CABLE AND TELEPHONE WIRING IS INSTALLEDBEFORE GYPSUM BOARD CEILING IS IN PLACE. WIRING AND CABLING SHALL BE BROUGHT FROM HEAD END EQUIPMENT TO BACK BOXES WITH TELE/DATA JACKS IN LOCATIONS INDICATED ONELECTRICAL DRAWINGS.TELECOMMUNICATION AND OTHER SPECIAL SYSTEMS NOTESPHONE/CATV/INTERNET NETWORK CONNECTION-FURNISHED AND INSTALLED BY ECSURVEILLANCE CAMERA- FURNISHED BY OWNER'S VENDOR- CABLING BY OWNER'S VENDOR. CONDUIT, BOXES ANDPULLSTRING BY EC- FIELD COORDINATE EXACT LOCATIONS AND QUANTITIESWITH OWNER'S REP & SECURITY VENDOR- EC SHALL PROVIDE 4"x4"x1/2" BOX FOR SECURITY CAMERAMOUNTING. PROVIDE CONDUIT BACK TO ELECTRICAL ROOMSENSORY (AV) UNIT LEGEND:DIDOORBELL INDICATOR LIGHT- WIRELESS UNIT, FURNISHED AND INSTALLED BY ECINTERCOM INDICATOR LIGHT-CONNECT TO INTERCOM PANEL. LIGHT SHALL ILLUMINATEWHENEVER INTERCOM IS ACTIVATED.-FURNISHED AND INSTALLED BY ECDOORBELL PUSH BUTTON- FURNISHED AND INSTALLED BY ECTTELEPHONE INDICATOR LIGHT- FURNISHED AND INSTALLED BY ECEMERGENCY LIGHT REMOTE HEADDEDICATED OUTDOOR AIR UNIT-BY MCVERTICAL HEAT PUMP UNIT- BY MCELECTRIC CABINET HEATER- BY MCELECTRIC UNIT HEATER- BY MCHEAT PUMP WATER HEATER-BY PCRECIRCULATION PUMP-BY PC-FURNISHED AND INSTALLED BY EC- COORDINATE EXACT REQUIREMENTS WITH LOCAL FD & PD PRIOR TO SUBMITTAL PHASEFIRE ALARM LEGENDCOMMUNICATIONS, ACCESS CONTROL & SECURITY LEGENDLIGHTING LEGEND"CLG" = CEILING MOUNTED"CLG" = CEILING MOUNTEDDUCT TYPE SMOKE DETECTORDSELECTRICAL DEVICE MOUNTING HEIGHTS48" MAX.FIN. FL.SWITCHES18"ALL MOUNTING HEIGHTS SHOWN ARE FOR BIDDING PURPOSES ONLY. EXACT MOUNTING HEIGHTS SHALL BE COORDINATED WITHARCHITECT & OWNER PRIOR TO ROUGH-IN1.DEVICES SHALL BE INSTALLED ON A COMMON VERTICAL CENTERLINE WHEREVER POSSIBLE.2.ALL DEVICES SHALL BE INSTALLED AT MOUNTING HEIGHTS AS INDICATED ON ARCHITECTURAL DRAWINGS.3.MOUNT DEVICE 8" ABOVE COUNTER TOP. COORDINATE HEIGHT OF BACK SPLASH WITH THE ARCHITECT4.PRIOR TO ROUGH-IN, VERIFY ALL MOUNTING HEIGHTS AND DEVICE LOCATIONS WITH ARCHITECT.5.NOT ALL DEVICES USED IN THE PROJECT ARE SHOWN.6.48" HEIGHT FOR MAAB FRONT REACH & 54" HEIGHT FOR ADA SIDE REACH.7.DEVICES SHALL BE LOCATED NO LESS THAN 18" FROM INTERIOR CORNERS. DEVICES LOCATED ON WALLS ABOVE CABINETSMUST BE A MINIMUM OF 36" FROM INTERIOR CORNERS.8.FIRE ALARM, ACCESS CONTROLS, SECURITY, CATV, DATA AND TELECOM DESIGN IS BY OTHERS.a. LOCATIONS OF DEVICES WHERE SHOWN FOR REFERENCE ONLY FOR CONVENIENCE/COORDINATION PURPOSES ONLY.NOTES:-NOTE 6℄℄MAX.44"6"ABOVE COUNTERDEVICE SEENOTE 38'-0" MAX.FIRE ALARM PULL STATIONTELE/DATA OUTLETRECEPTACLEWALL PHONELIGHT SWITCHES FIRE ALARM AUDIBLE DEVICEFINISHED CEILING (VARIES)8"18"4'-0" MAX.6'-8" MIN.FIN. FL.FIRE ALARM VISUAL DEVICEINTERCOM7'-0" ℄CLOCKEXIT7'-0" ℄4'-6" MAX.4'-0" MIN.-SYNCHRONIZE MORETHAN 2 A/V & VISUALAPPLIANCES ONLY7'-6" MIN. 6"3"5"5'-0" MAX.4" 12" MAX.4"3' MIN.SUPPLY/RETURN WALL MOUNT SMOKE/HEAT DETECTORCLG MOUNT SMOKE/HEAT DETECTORDIFFUSERMAGNETIC DOORHOLDERRTSREMOTE TEST STATIONEUHXECHXHPXDOAXRCPXHPWHXPPHOTOCELLCOMBINATION EXIT SIGN/EMERGENCY LIGHTHHHANDHOLEHCADA DOOR OPERATOR PUSH PADDLEPROVIDE ONLY IF REQUIRED BASED ON TESTING- SEE RISER DIAGRAM & SPECIFICATIONS ONSHEETS E6.1 FOR ADDITIONAL NOTES ANDINFORMATIONBASE BID:EC SHALL COORDINATE WITH POLICE/FIREDEPARTMENT AND PERFORM ALL TESTINGREQUIRED TO DETERMINE IF DAS SYSTEM ISREQUIRED.ADD ALTERNATE:EC SHALL FURNISH AND INSTALL ALL DEVICES,RACEWAY, CABLING, ETC. TO PROVIDE FULLYFUNCTIONAL DAS SYSTEMELECTRIC HEATER- BY MCECRXENERGY RECOVERY VENTILATOR-BY MCMAKE-UP AIR UNIT- BY MCMAUXERVXELECTRIC DUCT HEATER- BY MCEDHXGEOTHERMAL PUMP- BY MCGPXSDDIMMER SWITCH- ALL SWITCHES LOCATED IN APARTMENT UNITS SHALL BE ROCKER-TYPE- ALL SWITCHES LOCATED IN APARTMENT UNITS SHALL BE ROCKER-TYPE- ALL SWITCHES LOCATED IN APARTMENT UNITS SHALL BE ROCKER-TYPEWALL TELEPHONE JACK MOUNTED 48-INCHES AFFT2ESELECTRIC DOOR STRIKEDHMAGNETIC DOOR HOLD OPEN-REFER TO DETAIL ON SHEET E5.1-REFER TO DETAIL ON SHEET E5.1PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-E0.0ELECTRICAL NOTES& LEGENDSN.T.S. 1.SEE POWER RISERS ON E6.0 FOR FEEDER CLARIFICATIONS.2.FOLLOW CURRENT NATIONAL GRID ELECTRICAL SPECIFICATIONS FOR ALL MATERIALSAND INSTALLATION. OBTAIN NATIONAL GRID APPROVAL FOR ALL SERVICE EQUIPMENTAND TRENCH SPECIFICATIONS. COORDINATE WITH NATIONAL GRID PLANNER. NOTEMAXIMUM THREE-PHASE SERVICE LATERAL CONDUCTOR SIZE NATIONAL GRID WILLACCEPT IS 500-KCMIL (CU) OR 750-KCMIL (AL); AND SINGLE PHASE 500-KCMIL (CU/AL)3.SEE SITE/CIVIL PLANS FOR EXACT ROUTING OF EXISTING/PROPOSED UTILITIESINCLUDING ELECTRICAL.4.CONTACT DIGSAFE TO IDENTIFY EXISTING UTILITIES PRIOR TO PERFORMING ANYUNDERGROUND WORK.5.ALL SITE LIGHTING, INCLUDING EXTERIOR BUILDING MOUNTED LIGHTS AND BUILDINGPROPERTY SIGNAGE, SHALL BE POWERED FROM PANEL SHOWN VIA RESPECTIVELIGHTING RELAY PANEL, CIRCUIT NEXT TO SYMBOL REPRESENTS CIRCUIT NUMBER.6.FOR ALL EXTERIOR LIGHTING, PROVIDE #6 (CU) POWER CONDUCTORS WITH MAXIMUMLOADING OF 1000-WATTS TO COMPLY WITH VOLTAGE DROP PER NEC (ASSUMING1100-FEET MAXIMUM). ADVISE ENGINEER IF DIFFERENT ROUTING IS USED TO ADJUSTCALCULATIONS AFTER LIGHTING EQUIPMENT HAS BEEN APPROVED.GENERAL NOTES:1.SITE CONTRACTOR SHALL PROVIDE ALL TRENCHING, EXCAVATION AND BACKFILL.a. EC SHALL PROVIDE ALL CONDUIT.b. SITE CONTRACTOR SHALL PROVIDE CONCRETE AT PRIMARY CONDUITS PERTRENCH DETAIL.2.EC SHALL PROVIDE PRE-CAST TRANSFORMER PAD & OIL CONTAINMENT CURB FORINSTALLATION BY SITE CONTRACTOR. SEE DETAILS.SITE COORDINATION NOTES:1APPROXIMATE LOCATION OF NEW 750kVAPAD MOUNTED UTILITY TRANSFORMERAPPROXIMATE LOCATIONOF NEW 25kW PROPANEGENERATORAPPROXIMATE LOCATION OFEXISTING UTILITY POLEHHAAAAAAAAAAAAAAAAAAAABBBBBBBBBB3PC-EXC-EXC-EXC-EXC-EXC-EXC-EX3/4"C W/ 2#10AWG + #10G (CU) TO POWER OUTLETSAT COVERED BIKE SHELTER-CONFIRM EXACT LOCATION AND QUANTITIES OFOUTLETS WITH OWNER'S REP, FIGURE MIN. OFTWO (2) DUPLEX (5-20R) GFCI RECEPTACLES WITHWHILE-IN USE COVERINTERCEPT EXISTING 2" CONDUIT-PROVIDE 2#10AWG + #10G (CU) TO POWEROUTLETS AT COVERED BIKE SHELTER-CONFIRM EXACT LOCATION AND QUANTITIES OFOUTLETS WITH OWNER'S REP, FIGURE MIN. OFTWO (2) DUPLEX (5-20R) GFCI RECEPTACLES WITHWHILE-IN USE COVER; CIRCUIT FROM PANELHP-1A BREAKER #48PROVIDE TWO (2) LEVEL 2 DUAL CAR CHARGING STATIONS,CLIPPER CREEK HCS-D40-C13-L25-113 OR APPROVEDEQUAL-OTHER ACCEPTABLE MANUFACTURERS INCLUDEVERSICHARGE, CHARGEPOINT, GE, EATON AND LEVITONHIGH VOLTAGE/COMMUNICATIONS DUCT BANK-FROM UTILITY POLE, PROVIDE (2) 5" PVC CONDUITS(1 USED, 1 SPARE) WITH 1-1/4" NYLON PULLCORD-CONCRETE ENCASED AT 30-INCH DEPTH-FIGURE ON 150-FEET TO POLE-HIGH VOLTAGE CABLES TO BE INSTALLED BYNATIONAL GRID4HHHHCONDUIT/CONDUCTORS TO GENERATOR-SEE POWER RISER DIAGRAM ON SHEETE6.0 FOR QUANTITIES AND SIZESPROVIDE SERVICEGROUNDSERVICE CONDUCTORS-SEE POWER RISER ONSHEET E6.0 FORQUANTITIES AND SIZESEXISTING (2) 2" PVC CONDUIT-TO REMAININVERTER AND AC COMBINERS(PHASE 2)INVERTER AND AC COMBINERS(PHASE 1)SOLAR PV METER & DISCONNECT (PHASE 1)-FIELD COORDINATE FINAL LOCATION WITH UTILITYSOLAR PV METER & DISCONNECT (PHASE 2)-FIELD COORDINATE FINAL LOCATION WITH UTILITY-RESERVE WALL SPACE AND PROVIDE CONDUITONLY, WIRING AND EQUIPMENT TO BE PROVIDED ATA LATER DATE AS PART OF PHASE 2.SHEET KEYED NOTES1APPROXIMATE LOCATION OF NEW 1000kVA PAD MOUNTED UTILITY TRANSFORMERFURNISHED & INSTALLED BY NATIONAL GRIDELECTRICAL CONTRACTOR MUST PROVIDE THE FOLLOWING:A.TRANSFORMER PAD FOUNDATION PER NATIONAL GRID SPECIFICATIONSB.GROUNDING GRID PER NATIONAL GRID SPECIFICATIONSC.PRIMARY CABLE TRENCH SHALL BE BY SITE CONTRACTORD.PAD MOUNTED TRANSFORMER FOUNDATION EXCAVATION SHALL BE BY SITECONTRACTORE.AFTER PRIMARY CABLE INSTALLATION BY NATIONAL GRID , SITE CONTRACTORSHALL BACKFILL ALL TRENCHINGF.BOLLARDS, AS REQUIRED BY NATIONAL GRID SHALL BE BY SITE CONTRACTORG.OIL CONTAINMENT PAD PER NATIONAL GRID SPECIFICATIONSH.EC SHALL FURNISH PRE-CAST CONCRETE TRANSFORMER PAD AND OILCONTAINMENT CURBING FOR INSTALLATION BY THE SITE CONTRACTOR. SEEDETAILS ON SHEET E-5.1.I.PAD MOUNT TRANSFORMER SWEEPS SHALL BE GALVANIZED RIGID STEEL ORSCHEDULE 40 - PVC, WITH THE TRANSFORMER SWEEPS RISING TYPICALLY 1"ABOVE THE CONCRETE PAD.J.EC SHALL INSTALL BELL ENDS ON THE CONDUITS AND INSTALL CONDUIT PLUGS INALL UNUSED CONDUITS AND PULLING TAPE.PROVIDE HANDHOLE, BASIS OF BID 24"W x 36"L x 18"D OLDCASTLE PRECAST DUOMOLDCOMPOSITE M/N 2436-18 OR APPROVED EQUAL WITH COVER MARKED "ELECTRIC".INSTALL PHOTOCELL IN SHADED AREA (PREFERABLY NORTH SIDE OF BUILDING)-FIELD COORDINATE EXACT LOCATION-PHOTOCELL SHALL BE CONNECTED/CONTROL EXTERIOR LIGHTING FIXTURES-PROVIDE LIGHTING CONTROL PANEL WITH 8 RELAYS AND TIME CLOCK, (1)WATTSTOPPER LP8 PEANUT CONTROL PANEL OR APPROVED EQUAL. PROVIDEPHOTOCELL ACCESSORY WITH CONTROL WIRING FOR INPUT TO UNIT. FIELDCOORDINATE PROGRAMMING FOR LIGHTING RELAY PANEL WITH OWNER SCHEDULESFOR OFF-HOURS AND PEAK NIGHT TIME USE.PROVIDE THREE (3) 2-INCH EMPTY CONDUITS WITH PULL CORD FOR PHONE/DATA/CATVCABLES BY OWNER'S VENDOR. CONDUIT SHOULD EXTEND FROM UTILITY POLEVICINITY TO TELECOMM ROOM ON FIRST FLOOR.-COMPLY WITH UTILITY GUIDELINES FOR CONDUITS IN SHARED TRENCH.-CONDUITS SHALL NOT TERMINATE ON NATIONAL GRID POLES.FUTURE DUAL ELECTRIC VEHICLE CHARGING STATION-FIELD COORDINATE EXACT LOCATIONS OF ELECTRIC VEHICLE PARKING SPACES WITHOWNER'S REP. (15 PARKING SPACES REQUIRED PER IECC 2021 C405.13).PROVIDE (6) RUNS OF 1" CONDUIT W/ 2#6 AWG (Cu) + #8G AND (1) 1"C W/ BELDEN3107DB (RJ-485 W/ WET BLOCKING) FOR COMMUNICATION PROTOCOL (DAISY CHAINED)PROVIDE (2) RUNS OF 1" CONDUIT W/ 2#6 AWG (Cu) + #8G AND (1) 1"C W/ BELDEN3107DB (RJ-485 W/ WET BLOCKING) FOR COMMUNICATION PROTOCOL (DAISY CHAINED)23456655555577HHHHHHAPPROXIMATE LOCATION OFEXISTING UTILITY POLE-TO REMAINAPPROXIMATE LOCATIONEXISTING HAND HOLE FORVALLEY BIKE STATION-TO REMAINAPPROXIMATE LOCATION OFEXISTING PUMP CHAMBER ANDASSOCIATED POWER PEDESTAL-TO REMAINHHAPPROXIMATE LOCATION OF EXISTING PANEL-REMOVE AND REPLACE WITH HAND HOLE3/4"C W/ 2#10AWG + #10G (CU) TO POWER OUTLETSAT OUTBUILDING-CONFIRM EXACT LOCATION AND QUANTITIES OFOUTLETS WITH OWNER'S REP, FIGURE MIN. OFTWO (2) DUPLEX (5-20R) GFCI RECEPTACLES WITHWHILE-IN USE COVER, CIRCUIT FROM PANEL HP-1BBREAKER #13222222C-EXC-EXC-EXC-EXC-EXC-EXC-EXPROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-ELECTRICALSITE PLAN1" = 20'E0.1 1413JHGF10EDCB14985431A13121176ABCDE5FGHJK10965LM12118754311SHEET KEYED NOTESREFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.0 FOR LAYOUT OF LIGHTING FIXTURES AND CONTROLS.REFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.1 FOR LAYOUT OF LIGHTING FIXTURES AND CONTROLS.LIGHTING FIXTURES IN COMMUNITY ROOM C-1-6 SHALL BE ONSTANDBY POWER (FED FROM PANEL SB-1).211111111111112122122222222222222SSOSSOS SOSSOSOSOSOSSOS OSS SSS1S1S2C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1S1S1S2C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1S1S1S2U1U1C2C2R1SOSC2C3C3L1L1U1S1S1S1L1L1U1S3S3 C2C2C2C2C2C2C2C2C2U13S3S1S1S2C1C1C1C1C1C1C1C1C1C1C3C3C3C3C3C3RHEX2EX2EMEX2EMEMEMEX2EX2EMEX2RHRHRHRHRHEMEX2EX2EMEMEX2EX2EMEX2EMEX2EX2EMEX1EX2EMEX2EMEX-CEX-CU1U1U1U1U1U1U1U1U1SS EX2EX2EMEMEMEMEMEMEMEMEX2EMEMEMEMEMEMEMEMEMEX2EMEMEMEX2EX2EMRHRH1.ALL PROPOSED SWITCH LOCATIONS AND SWITCHING SCHEMES SHALL BEREVIEWED WITH OWNER PRIOR TO ROUGH-IN. OWNER RESERVES THERIGHT TO MODIFY LOCATIONS OF SWITCHES. RECORD AND IDENTIFYAPPROVED SWITCHING SCHEME.2.INTERIOR LIGHTING FIXTURES SHALL BE SPECIFIED BY EC. CONFIRM EXACTTYPES, QUANTITIES AND LOCATIONS WITH OWNER'S REP.3.ALL COMMON AREA LIGHTING FIXTURES IN 1ST FLOOR EAST WING SHALL BEPOWERED FROM HP-1A. SEE PANELBOARD SCHEDULE ON SHEET E7.0 FORCIRCUIT DESIGNATIONS.3.ALL COMMON AREA LIGHTING FIXTURES IN 1ST FLOOR WEST WING SHALL BEPOWERED FROM HP-1B. SEE PANELBOARD SCHEDULE ON SHEET E7.0 FORCIRCUIT DESIGNATIONS.4.ALL COMMON AREA LIGHTING FIXTURES IN 1ST FLOOR NORTH & SOUTHWINGS SHALL BE POWERED FROM HP-1A. SEE PANELBOARD SCHEDULE ONSHEET E7.0 FOR CIRCUIT DESIGNATIONS.5.ALL LIGHTING FIXTURES IN COMMON AREA CORRIDORS AND STAIRWELLSSHALL BE CONTROLLED VIA OCCUPANCY SENSORS AND KEYED OVERRIDESWITCHES.SHEET LIGHTING NOTES33UNIT 1-21A-2UNIT 1-23B-2UNIT 1-19A-2UNIT 1-25C-1UNIT 1-17F-2UNIT 1-27D-1UNIT 1-05B-0UNIT 1-07B-0UNIT 1-15A-2UNIT 1-09E-2UNIT 1-11E-1UNIT 1-13A-2UNIT 1-03C-0UNIT 1-01B-1UNIT 1-02B-1UNIT 1-04C-0UNIT 1-06E-0UNIT 1-08B-0UNIT 1-10A-1UNIT 1-12B-2UNIT 1-14A-2UNIT 1-16A-2UNIT 1-18F-2UNIT 1-20A-2UNIT 1-22A-2UNIT 1-26C-1UNIT 1-24B-2UNIT 1-29A-0UNIT 1-31D-2UNIT 1-32A-3UNIT 1-30C-2UNIT 1-28D-1C-1-23SOUTHSTAIRC-1-22SOUTHENTRYC-1-21SOUTHCORRIDORC-1-6COMMUNITYROOMC-1-8MANAGEMENT/LEASING OFFICEC-1-10SERVICECOORDINATIONOFFICEC-1-5MAIL ROOMC-1-4COURTYARDC-1-3NORTHCORRIDORC-1-2VESTIBULEC-1-1COVEREDENTRYC-1-11ELEVATORMACH ROOMC-1-27ELEVATORMACH ROOMC-1-26WEST ELEVLOBBYC-1-12EAST ELEVLOBBYC-1-15COMMONSPACEC-1-16EASTCORRIDORC-1-19SOUTHEASTSTAIRC-1-17NORTHEASTSTAIRC-1-37NORTHWESTSTAIRC-1-32SOUTHWESTSTAIRC-1-34MULTIPURPOSEROOMC-1-35RESTROOMC-1-36MECH RMS C-1-25aMECHANICALC-1-13LAUNDRYSTORAGEC-1-28LAUNDRYJANITORC-1-29C-1-30COMMONSPACEC-1-31WESTCORRIDORC-1-25bMECHANICALR1SEE ELEVATOR WORK DETAILON E-5.0 FOR ADDITIONALELECTRICAL ITEMSSEE ELEVATOR WORK DETAILON E-5.0 FOR ADDITIONALELECTRICAL ITEMSC-1-9RESTROOMOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSSOSOSOSOSOSOSOSSK3SK3SK3SK3SK3SK3SK3S K 4 S K SK3SK3SK3SK3S K 4 S KSKSK 4 S K 4 S K 4 SK4C1C1C1C1C1C1C1C1C1C13 S3S3S3C2C2PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-FIRST FLOORLIGHTING PLAN1/8" = 1'-0"E1.0 141310KKJHGF10EDCB14984321AA13121176BCDE5FGHJ965M1211874321LSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHT11111222112222222222222112221SHEET KEYED NOTESREFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.0 FOR LAYOUT OF LIGHTING FIXTURES AND CONTROLS.REFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.1 FOR LAYOUT OF LIGHTING FIXTURES AND CONTROLS.LIGHTING FIXTURES IN RESIDENT LIBRARY ROOM C-2-6 SHALL BEON STANDBY POWER (FED FROM PANEL SB-1).2S1S1S2S1S1S2S1S1S2S1S1S2C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1C1SOSL1L1SOSU1C1C1C1C1SOSU1SOSSOSSOSL1L1U1C1C1C1C1C1C1C1C1C1C1C1C1C1S1S1S2EMEMEMEMEMEMEX1EX-CEMEX1EMEX1EX1EMEMEMEX1EX1EMEMEX-CEMEMEMEX1EX1EMEMEMEMEX1EMEMEMEMEX-CEX1EMEMEX11.ALL PROPOSED SWITCH LOCATIONS AND SWITCHING SCHEMES SHALL BEREVIEWED WITH OWNER PRIOR TO ROUGH-IN. OWNER RESERVES THERIGHT TO MODIFY LOCATIONS OF SWITCHES. RECORD AND IDENTIFYAPPROVED SWITCHING SCHEME.2.INTERIOR LIGHTING FIXTURES SHALL BE SPECIFIED BY EC. CONFIRMEXACT TYPES, QUANTITIES AND LOCATIONS WITH OWNER'S REP.3.ALL COMMON AREA LIGHTING FIXTURES IN 2ND FLOOR EAST WING SHALLBE POWERED FROM HP-2A. SEE PANELBOARD SCHEDULE ON SHEET E7.0FOR CIRCUIT DESIGNATIONS.3.ALL COMMON AREA LIGHTING FIXTURES IN 2ND FLOOR WEST WING SHALLBE POWERED FROM HP-2B. SEE PANELBOARD SCHEDULE ON SHEET E7.0FOR CIRCUIT DESIGNATIONS.4.ALL COMMON AREA LIGHTING FIXTURES IN 2ND FLOOR SOUTH WING SHALLBE POWERED FROM HP-2B. SEE PANELBOARD SCHEDULE ON SHEET E7.0FOR CIRCUIT DESIGNATIONS.5.ALL LIGHTING FIXTURES IN COMMON AREA CORRIDORS AND STAIRWELLSSHALL BE CONTROLLED VIA OCCUPANCY SENSORS AND KEYED OVERRIDESWITCHES.SHEET LIGHTING NOTESUNIT 2-21A-2UNIT 2-23B-2UNIT 2-19A-2UNIT 2-25F-1UNIT 2-17F-2UNIT 2-27D-1UNIT 2-05D-3UNIT 2-07B-0UNIT 2-15A-2UNIT 2-09A-1UNIT 2-11B-2UNIT 2-13A-2UNIT 2-06C-3UNIT 2-08B-0UNIT 2-10A-1UNIT 2-12B-2UNIT 2-14A-2UNIT 2-16A-2UNIT 2-18F-2UNIT 2-20A-2UNIT 2-22A-2UNIT 2-26F-1UNIT 2-24B-2UNIT 2-29D-0UNIT 2-31B-3UNIT 2-32A-3UNIT 2-30C-2UNIT 2-28D-1C-2-23SOUTHSTAIRC-2-22SOUTHENTRYC-2-21SOUTHCORRIDORC-2-4COURTYARDC-2-15COMMONSPACEC-2-16EASTCORRIDORC-2-19SOUTHEASTSTAIRC-2-17NORTHEASTSTAIRC-2-37NORTHWESTSTAIRC-2-32SOUTHWESTSTAIRC-1-13LAUNDRYSTORAGEC-2-28LAUNDRYJANITORC-2-29C-2-30COMMONSPACEC-2-31WESTCORRIDORC-1-12EAST ELEVLOBBYC-2-26WEST ELEVLOBBYC-2-8STUDY ROOMC-2-6RESIDENTLIBRARY ROOMROOFROOFROOFS2SEE ELEVATOR WORK DETAILON E-5.0 FOR ADDITIONALELECTRICAL ITEMSSEE ELEVATOR WORK DETAILON E-5.0 FOR ADDITIONALELECTRICAL ITEMSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSOSS OS OSSK3SK3SK3SK3SK3SK3SK3S K 4 S K S K 3 SK3SK3S K 4 SK SK3S K 3 SK3SK433C1C1C1PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-SECOND FLOORLIGHTING PLAN1/8" = 1'-0"E1.1 1413KJHGF10EDCB14985431A13121176ABCDE5FGHJK10965LM1211875431PKBFFAANPPPPPPFFFFFFFFFFFFESESDASDASDASDASDASDASSSSSSSSSSSSSSSSSSSSSSSSSSSSSS1SHEET KEYED NOTESREFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.0 FOR LAYOUT OF POWER AND FIRE ALARM DEVICES.REFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.1 FOR LAYOUT OF POWER AND FIRE ALARM DEVICES.PROVIDE ELEVATOR 2-WAY COMMUNICATION DEVICES FORSPRINKLERED BUILDING AS REQUIRED BY IBC 1009.8.PROVIDE 120V CIRCUIT FOR DOOR ACCESS CONTROLS. POWERBRANCH CIRCUIT FROM PANELMDP-1, CIRCUIT #32.-SEE DETAIL ON E5.1.WIRE CARD READER IN SUCH A WAY THAT IT UNLOCKS THE DOORBEFORE THE HANDICAP PUSH BUTTON CAN BE USED.HANDICAP ACCESS PUSH BUTTON FOR AUTOMATIC DOOR. MOUNT 48"AFF. PROVIDE ALL REQUIRED WIRING AND HARDWARE AND CONNECTTO AUTOMATIC DOOR OPERATOR.JUNCTION BOX FOR CONNECTION TO AUTOMATIC DOOR OPERATOR.PROVIDE ALL REQUIRED INTERCONNECTION WITH HANDICAP ACCESSPUSH BUTTONS. POWER BRANCH CIRCUIT FROM PANEL MDP-2,CIRCUIT #27.APPROVED FIRE ALARM VENDOR SHALL CONFIRM SPACING AGAINSTMANUFACTURER SOUND OUTPUT. THIS OUTPUT SHALL BE 15-DBAABOVE AVERAGE AMBIENT SOUND IN EVERY OCCUPIABLE SPACE INTHE BUILDING BUT SHALL NOT EXCEED 110-DBA IN ANY CASE. ECSHALL LOCATE HORN/STROBES IN ACCORDANCE WITH APPROVEDSHOP DRAWINGS. FIRE ALARM MANUFACTURER SHALL FIELDMEASURE/CONFIRM SOUND LEVELS DURING TESTING/COMMISSIONINGAND ADJUST SOUND LEVELS AS REQUIRED BY OWNER'S REP.PROVIDE FIRE ALARM ADDRESSABLE MONITOR MODULE AT EACH FIREPROTECTION SYSTEM DEVICE.-FIELD COORDINATE EXACT LOCATIONS AND QUANTITIES.SECURITY CAMERA LOCATED IN ELEVATOR CAR. COORDINATE WITHAPPROVED ELEVATOR MANUFACTURER/INSTALLER.2ACACSEE ELEVATOR WORK DETAILON E-5.0 FOR ADDITIONALELECTRICAL ITEMSSEE ELEVATOR WORK DETAILON E-5.0 FOR ADDITIONALELECTRICAL ITEMSHCHCHC KFHP-1AHP-1BINT1INT2KFFACP96" CLEARANCE2BDA-PDSEC SHALL PROVIDE FIRE-RATED, 3/4" PLYWOOD BACKBOARD-MOUNT DATA/TELECOM/CATV/SECURITY SERVICE EQUIPMENT ON BACKBOARDSWITCHGEAR INSTALLED ONCONCRETE PAD-3000A, 120/208V, 3Ø, 4WMAIN DISTRIBUTION PANEL MDP-1-1200A 120/208V, 3Ø, 4WANNCATSMAIN DISTRIBUTION PANEL MDP-2-1200A 120/208V, 3Ø, 4WSTANDBY PANEL PP-SB1-400A 120/208V, 3Ø, 4WLIFE SAFETY PANEL PP-LS1-100A 120/208V, 3Ø, 4WAUTOMATIC TRANSFER SWITCH ATS-SB(STANDBY, 400A, 3Ø, 4W)AUTOMATIC TRANSFER SWITCH ATS-LS(LIFE SAFETY, 100A, 3Ø, 4W)PER MEC 110.26(A)AND (C.2.b.)ATSFFAC11111111111112122122222222222222HP-1B1HP-1B1HP-1B1HP-1B3HP-1B3HP-1B1HP-1B1HP-1B1HP-1B3HP-1B3HP-1A1HP-1A1HP-1A1HP-1A1HP-1A1HP-1A1HP-1A3HP-1A3HP-1A3HP-1A3HP-1A3HP-1A9HP-1A9HP-1A9HP-1A9HP-1A9HP-1A96HP-1A6SB-14SB-12SB-14SB-14SB-12HP-1B15HP-1A13HP-1A13HP-1A13HP-1B9HP-1B9HP-1A1933666HC65J7JJ74J4HC665J7HCHC HC6J7 34567PPUNIT 1-21A-2UNIT 1-23B-2UNIT 1-19A-2UNIT 1-25C-1UNIT 1-17F-2UNIT 1-27D-1UNIT 1-05B-0UNIT 1-07B-0UNIT 1-15A-2UNIT 1-09E-2UNIT 1-11E-1UNIT 1-13A-2UNIT 1-03C-0UNIT 1-01B-1UNIT 1-02B-1UNIT 1-04C-0UNIT 1-06E-0UNIT 1-08B-0UNIT 1-10A-1UNIT 1-12B-2UNIT 1-14A-2UNIT 1-16A-2UNIT 1-18F-2UNIT 1-20A-2UNIT 1-22A-2UNIT 1-26C-1UNIT 1-24B-2UNIT 1-29A-0UNIT 1-31D-2UNIT 1-32A-3UNIT 1-30C-2UNIT 1-28D-1C-1-23SOUTHSTAIRC-1-22SOUTHENTRYC-1-21SOUTHCORRIDORC-1-6COMMUNITYROOMC-1-8MANAGEMENT/LEASING OFFICEC-1-10SERVICECOORDINATIONOFFICEC-1-5MAIL ROOMC-1-4COURTYARDC-1-3NORTHCORRIDORC-1-2VESTIBULEC-1-1COVEREDENTRYC-1-11ELEVATORMACH ROOMC-1-27ELEVATORMACH ROOMC-1-26WEST ELEVLOBBYC-1-12EAST ELEVLOBBYC-1-15COMMONSPACEC-1-16EASTCORRIDORC-1-19SOUTHEASTSTAIRC-1-17NORTHEASTSTAIRC-1-37NORTHWESTSTAIRC-1-32SOUTHWESTSTAIRC-1-34MULTIPURPOSEROOMC-1-35RESTROOMC-1-36MECH RMC-1-25aMECHANICALC-1-13LAUNDRYSTORAGEC-1-28LAUNDRYJANITORC-1-29C-1-30COMMONSPACEC-1-31WESTCORRIDORC-1-25bMECHANICALSTSTHP-1A38(TYP.)8(TYP.)8LOCATION OFEXISTING FIREPROTECTIONSERVICEEQUIPMENTBDA-FDWASHERS AND DRYERS IN LAUNDRY C-1-28SHALL BE CIRCUITED FROM PANEL HP-1B-SEE PANELBOARD SCHEDULE FORCIRCUIT DESIGNATIONSWASHERS AND DRYERS IN LAUNDRY C-1-13SHALL BE CIRCUITED FROM PANEL HP-1A-SEE PANELBOARD SCHEDULE FORCIRCUIT DESIGNATIONSACHP-1B3HP-1B5HP-1B3HP-1B159TS FS TS FS 9MDP-221MDP-221MDP-225MDP-223C-1-9RESTROOMESESHP-1B58(TYP.)HP-1A6HP-1A6HP-1A6HP-1AHP-1A50HP-1A50HP-1A50HP-1A50HP-1A54HP-1A50HP-1A52HP-1A52HP-1A52HP-1A52SB-14SB-14SB-12SB-14SB-12SB-12HP-1B15HP-1B15HP-1B15HP-1B15HP-1A54HP-1A54101010INT1ES ES ESKF JHC65 J7HC 46DH DH PROVIDE POWER FORMAGNETIC DOORHOLDERS VIA FIREALARM SYSTEM RELAYPROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-FIRST FLOORELECTRICAL &FIRE ALARM PLAN1/8" = 1'-0"E1.2 1413ML10KKJHGF10EDCB14984321AA13121176BCDE5FGHJ965M1211874321LSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTPPPPPPSSSSSSFFFFFFFFFFESESDASDASDASDASDASSSSSSSSSSSSSSDASFFFSSSSSSSS1SHEET KEYED NOTESREFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.0 FOR LAYOUT OF POWER AND FIRE ALARM DEVICES.REFER TO TYPICAL APARTMENT UNIT ELECTRICAL PLANS ON SHEETE2.1 FOR LAYOUT OF POWER AND FIRE ALARM DEVICES.APPROVED FIRE ALARM VENDOR SHALL CONFIRM SPACING AGAINSTMANUFACTURER SOUND OUTPUT. THIS OUTPUT SHALL BE 15-DBAABOVE AVERAGE AMBIENT SOUND IN EVERY OCCUPIABLE SPACE INTHE BUILDING BUT SHALL NOT EXCEED 110-DBA IN ANY CASE. ECSHALL LOCATE HORN/STROBES IN ACCORDANCE WITH APPROVEDSHOP DRAWINGS. FIRE ALARM MANUFACTURER SHALL FIELDMEASURE/CONFIRM SOUND LEVELS DURING TESTING/COMMISSIONINGAND ADJUST SOUND LEVELS AS REQUIRED BY OWNER'S REP.2ACACHP-2AHP-2B111112221122222222222221222HP-2A1HP-2A1HP-2A1HP-2A3HP-2A1HP-2A3HP-2A3HP-2A3HP-2A3HP-2A1HP-2A1HP-2A5HP-2A5HP-2B1HP-2B1HP-2B1HP-2B1HP-2B1HP-2B1HP-2B3HP-2B3HP-2B3HP-2B3HP-2B3HP-2B3HP-2B5HP-2B5HP-2B5HP-2B5HP-2B5HP-2B5HP-2B7HP-2B7HP-2B7HP-2B7PPUNIT 2-21A-2UNIT 2-23B-2UNIT 2-19A-2UNIT 2-25F-1UNIT 2-17F-2UNIT 2-27D-1UNIT 2-05D-3UNIT 2-07B-0UNIT 2-15A-2UNIT 2-09A-1UNIT 2-11B-2UNIT 2-13A-2UNIT 2-06C-3UNIT 2-08B-0UNIT 2-10A-1UNIT 2-12B-2UNIT 2-14A-2UNIT 2-16A-2UNIT 2-18F-2UNIT 2-20A-2UNIT 2-22A-2UNIT 2-26F-1UNIT 2-24B-2UNIT 2-29D-0UNIT 2-31B-3UNIT 2-32A-3UNIT 2-30C-2UNIT 2-28D-1C-2-23SOUTHSTAIRC-2-22SOUTHENTRYC-2-21SOUTHCORRIDORC-2-4COURTYARDC-2-15COMMONSPACEC-2-16EASTCORRIDORC-2-19SOUTHEASTSTAIRC-2-17NORTHEASTSTAIRC-2-37NORTHWESTSTAIRC-2-32SOUTHWESTSTAIRC-2-13LAUNDRYSTORAGEC-2-28LAUNDRYJANITORC-2-29C-2-30COMMONSPACEC-2-31WESTCORRIDORC-1-12EAST ELEVLOBBYC-2-26WEST ELEVLOBBYC-2-8STUDY ROOMC-2-6RESIDENTLIBRARY ROOMROOFROOFROOF33(TYP.)3(TYP.)WASHERS AND DRYERS IN LAUNDRY C-2-28SHALL BE CIRCUITED FROM PANEL HP-2B-SEE PANELBOARD SCHEDULE FORCIRCUIT DESIGNATIONSWASHERS AND DRYERS IN LAUNDRY C-2-13SHALL BE CIRCUITED FROM PANEL HP-2A-SEE PANELBOARD SCHEDULE FORCIRCUIT DESIGNATIONSSERVICE DISTRIBUTION PANEL DP-1-400A 120/208V, 3Ø, 4WSERVICE DISTRIBUTION PANEL DP-2-400A 120/208V, 3Ø, 4WSERVICE DISTRIBUTION PANEL DP-3-400A 120/208V, 3Ø, 4W3(TYP.)HP-2A3SB-16SB-16SB-16SB-16SB-16SB-18SB-18SB-18SB-18SB-18PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-SECOND FLOORELECTRICAL & FIREALARM PLAN1/8" = 1'-0"E1.3 1413JHGF10EDCB14985431A13121176ABCDE5FGHJK10965LM1211875431HP3HP2HP3HP2HP3HP2HP2HP2HP3HP3HP1HP1HP1HP1HP2HP2HP1HP1HP3HP2HP3HP3HP2HP2HP3HP2HP2HP2HP3HP2HP4HP2HP1HP2HP1HP2HP1HP1HP1HP6HP5HP1HP5HP5HP5HP7HP5HP81SHEET KEYED NOTESHEAT PUMP SERVING APARTMENT SHALL BE POWERED FROM RESPECTIVEAPARTMENT UNIT PANEL. SEE PANELBOARD SCHEDULES ON SHEET E7.0.OIL HIGH LEVEL ALARM PANEL FURNISHED & INSTALLED BY PC-EC SHALL PROVIDE 120V POWER & CONTROL WIRING TO OIL SEPARATOR-FIELD CONFIRM EXACT LOCATION-COORDINATE WITH PCPROVIDE TWO (2) 1-INCH RACEWAYS BELOW SLAB (ONE FOR POWER, ONE FORCONTROLS).PROVIDE DEDICATED RECEPTACLE CONNECTED TO GFCI BREAKER FOR SUMP PUMP-FIELD COORDINATE EXACT LOCATION.GEOTHERMAL PUMP STATION INCLUDES FOUR (4) PUMPS CONNECTED TO A SINGLECONTROL PANEL. EC SHALL PROVIDE 2P/30A DISCONNECT FOR EACH PUMP. ALL FOUR(4) PUMPS SHALL BE CONNECTED TO THE SAME 2P/15A CIRCUIT BREAKER IN STANDBYPANEL SB-1, CIRCUIT #30/32 (GEOTHERMAL PUMP STATION #1) AND #29/31(GEOTHERMAL PUMP STATION #2).21111111111111111111111111111111HP-1A29/31HP-1A25/27HP-1A17/19HP-1A21/23HP-1A33/35HP-1A37/39HP-1A32/34SB-117/19HP-1B51/53HP-1B17/19HP-1B21/23HP-1B25/27HP-1B29/31HP-2B33/35HP-2B37/39SP1OS1SP1OS1OSAPOSAPOIL SEPARATOR (BY PC)INSTALLED BELOW GRADEOIL SEPARATOR (BY PC)INSTALLED BELOW GRADE3322344HP-1B54/56HP-1B58/60MDP-117MDP-233MDP-230MDP-123DOMESTIC WATER SERVICEENTRANCE EQUIPMENTRCP1GEOTHERMAL PUMP STATION #1 HPWH1BHPWH1AMDP-28/10/12MDP-214/16/18MDP-222SMMDP-224PROVIDE RECEPTACLE FORTHERMOSTATIC MIXING VALVE-FIELD COORDINATE EXACTLOCATION WITH PCPROVIDE 120V TO WATER HEATERMASTER CONTROL PANEL-FIELD COORDINATE EXACTLOCATION WITH PCMDP-22041.ALL HEAT PUMPS (HP-X) SHALL BE PROVIDED WITH DISCONNECT SWITCHES (FURNISHEDBY MC, INSTALLED/WIRED BY EC). DISCONNECTS NOT SHOWN ON PLAN FOR CLARITYPURPOSES.2.SEE MOTOR AND EQUIPMENT SCHEDULE ON E7.1 FOR ADDITIONAL INFORMATION ON HVACEQUIPMENT POWER REQUIREMENTS.3.SEE MECHANICAL AND PLUMBING PLANS FOR EQUIPMENT DESIGNATIONS AND EXACTLOCATIONS.GENERAL NOTESMDP-226/28ST155ECH1ECH2ECH2ECH2ECH2EUH1EUH1EDH3EDH1HP-1A45/47/49HP-1B36/38/40ERV1HP-1B51SMEDH5HP-1B41/43/45UNIT 1-21A-2UNIT 1-23B-2UNIT 1-19A-2UNIT 1-25C-1UNIT 1-17F-2UNIT 1-27D-1UNIT 1-05B-0UNIT 1-07B-0UNIT 1-15A-2UNIT 1-09E-2UNIT 1-11E-1UNIT 1-13A-2UNIT 1-03C-0UNIT 1-01B-1UNIT 1-02B-1UNIT 1-04C-0UNIT 1-06E-0UNIT 1-08B-0UNIT 1-10A-1UNIT 1-12B-2UNIT 1-14A-2UNIT 1-16A-2UNIT 1-18F-2UNIT 1-20A-2UNIT 1-22A-2UNIT 1-26C-1UNIT 1-24B-2UNIT 1-29A-0UNIT 1-31D-2UNIT 1-32A-3UNIT 1-30C-2UNIT 1-28D-1C-1-23SOUTHSTAIRC-1-22SOUTHENTRYC-1-21SOUTHCORRIDORC-1-6COMMUNITYROOMC-1-8MANAGEMENT/LEASING OFFICEC-1-10SERVICECOORDINATIONOFFICEC-1-5MAIL ROOMC-1-4COURTYARDC-1-3NORTHCORRIDORC-1-2VESTIBULEC-1-1COVEREDENTRYC-1-11ELEVATORMACH ROOMC-1-27ELEVATORMACH ROOMC-1-26WEST ELEVLOBBYC-1-12EAST ELEVLOBBYC-1-15COMMONSPACEC-1-16EASTCORRIDORC-1-19SOUTHEASTSTAIRC-1-17NORTHEASTSTAIRC-1-37NORTHWESTSTAIRC-1-32SOUTHWESTSTAIRC-1-34MULTIPURPOSEROOMC-1-35RESTROOMC-1-36MECH RMC-1-25aMECHANICALC-1-13LAUNDRYSTORAGEC-1-28LAUNDRYJANITORC-1-29C-1-30COMMONSPACEC-1-31WESTCORRIDORC-1-25bMECHANICAL1HP-1A36/38HP-1A51/53ECR2HP-1A40/42ECR1HP-1A44/46MDP-125/27MDP-133/35MDP-129/31HP-1B42/44ECR2C-1-9RESTROOMECR2ECR2HP5HP-1B47/49HP-1B46/48HP-1B50/52GEOTHERMALPUMP STATION #25GP1GP2MDP-232MDP-234PROVIDE RECEPTACLES FORSUMP PUMP ALARM PANELS-FIELD COORDINATE EXACTLOCATION WITH PCHP-1B51/53PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-FIRST FLOORHVAC POWER PLAN1/8" = 1'-0"E1.4 1413L10KKJHGF10EDCB14984321AA13121176BCDE5FGHJ965M1211874321LSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTSKYLIGHTHP1HP2HP1HP1HP2HP1HP7HP2HP2HP2HP2HP3HP2HP3HP2HP3HP3HP1HP3HP3HP1HP2HP3HP3HP3HP3HP2HP3HP3HP2HP3HP3HP4HP4HP1HP5HP5HP5HP6HP6HP5HP5111111111111111111111111111HP-2A29/31HP-2A25/27HP-2A17/19HP-2A21/23HP-2A33/35SB-120/22HP-2A30/32HP-2A34/36HP-2B17/19HP-2B21/23HP-2B25/27HP-2B29/31HP-2B33/35HP-2B37/39HP-2B30/32HP-2B34/36HP-2B38/401SHEET KEYED NOTESHEAT PUMP SERVING APARTMENT SHALL BE POWERED FROM RESPECTIVEAPARTMENT UNIT PANEL. SEE PANELBOARD SCHEDULES ON SHEET E7.0.1.ALL HEAT PUMPS (HP-X) SHALL BE PROVIDED WITH DISCONNECT SWITCHES (FURNISHEDBY MC, INSTALLED/WIRED BY EC). DISCONNECTS NOT SHOWN ON PLAN FOR CLARITYPURPOSES.2.SEE MOTOR AND EQUIPMENT SCHEDULE ON E7.1 FOR ADDITIONAL INFORMATION ON HVACEQUIPMENT POWER REQUIREMENTS.3.SEE MECHANICAL AND PLUMBING PLANS FOR EQUIPMENT DESIGNATIONS AND EXACTLOCATIONS.GENERAL NOTESEDH4EDH2HP-2A45/47/49HP-2B45/47/49UNIT 2-21A-2UNIT 2-23B-2UNIT 2-19A-2UNIT 2-25F-1UNIT 2-17F-2UNIT 2-27D-1UNIT 2-05D-3UNIT 2-07B-0UNIT 2-15A-2UNIT 2-09A-1UNIT 2-11B-2UNIT 2-13A-2UNIT 2-06C-3UNIT 2-08B-0UNIT 2-10A-1UNIT 2-12B-2UNIT 2-14A-2UNIT 2-16A-2UNIT 2-18F-2UNIT 2-20A-2UNIT 2-22A-2UNIT 2-26F-1UNIT 2-24B-2UNIT 2-29D-0UNIT 2-31B-3UNIT 2-32A-3UNIT 2-30C-2UNIT 2-28D-1C-2-23SOUTHSTAIRC-2-22SOUTHENTRYC-2-21SOUTHCORRIDORC-2-4COURTYARDC-2-15COMMONSPACEC-2-16EASTCORRIDORC-2-19SOUTHEASTSTAIRC-2-17NORTHEASTSTAIRC-2-37NORTHWESTSTAIRC-2-32SOUTHWESTSTAIRC-1-13LAUNDRYSTORAGEC-2-28LAUNDRYJANITORC-2-30COMMONSPACEC-2-31WESTCORRIDORC-1-12EAST ELEVLOBBYC-2-26WEST ELEVLOBBYC-2-8STUDY ROOMC-2-6RESIDENTLIBRARY ROOMROOFROOFROOFECR2C-1-29ECR21ECR2C-2-9STORAGEPROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-SECOND FLOORHVAC POWER PLAN1/8" = 1'-0"E1.5 HatchHatchElevatorElevatorHatch914KHDB21110712DC5MLJFBAG6713MLKHFCAG13468JEE91421110125131348DOA1DOA2WPMDP-120/22/24MDP-27/9/11HP-2B9DRTSSPROVIDE DUCT TYPE SMOKE DETECTOR & REMOTETEST STATION FOR SUPPLY & RETURN AIR DUCTS-SMOKE DETECTORS SHALL BE FURNISHED/WIRED BY EC, INSTALLED BY MC-FIELD COORDINATE EXACT LOCATIONS WITH MC, LOCATED INDOORSDSRTSPROVIDE DUCT TYPE SMOKE DETECTOR & REMOTETEST STATION FOR SUPPLY & RETURN AIR DUCTS-SMOKE DETECTORS SHALL BE FURNISHED/WIRED BY EC, INSTALLED BY MC-FIELD COORDINATE EXACT LOCATIONS WITH MC, LOCATED INDOORSDSRTSDSRTSMAU3MAU1HP-1A41/43MAU2HP-1B32/34MAU4HP-2B41/43WPHP-2B9WPHP-2B9HP-2A41/43PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-ROOF ELECTRICALPLAN1/8" = 1'-0"E1.6 SHEET GENERAL NOTES1.CERTAIN UNITS ARE MIRROR IMAGE OF "TYPICAL" PLAN SHOWN.2.ALL RECEPTACLES SHALL BE TAMPER-RESISTANT PER NEC-2023, 406.12.3.ALL 120-VOLT, SINGLE-PHASE, 15 AND 20 AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS OR DEVICES INSTALLED IN DWELLING UNITS SHALLHAVE AFCI PROTECTION METHOD PER NEC-2023, 210.12(A) & 527 CMR.4.ALL RECEPTACLES IN BATHROOMS AND KITCHENS SHALL BE GFCI PER NEC-2023, 210.8.a.IF KITCHEN APPLIANCES ARE PROVEN INCOMPATIBLE TO THE CURRENT GENERATION OF GFCI'S, INCLUDING ANY CURRENT FIRMWARE(MANUFACTURER'S PROGRAMMING), IN ACCORDANCE WITH 527 CMR RULE 11 AND WITNESSED BY AHJ AS TRIPPING, THE EC SHALLPROVIDE STANDARD NON-GFCI BREAKERS ONLY IF DIRECTED BY OWNER AND AHJ.5.ALL UNIT KITCHENS SHALL BE PROVIDED WITH TWO (2) OR MORE 20-AMP SMALL APPLIANCE BRANCH CIRCUITS PER NEC-2023, 210.52(B).6.ALL APARTMENTS SHALL BE PROVIDED WITH A PHOTOELECTRIC SMOKE DETECTOR. LOW-FREQUENCY SOUNDER BASES SHALL BE REQUIREDAS SPECIFIED IN SECTION 28 31 11. SOUNDER BASES SHALL PROVIDE 75dB AT PILLOW (PER NFPA 72-1010, 18.4.5), HAVE A "LOW" SETTING (75dBAT 10-FEET) AND "HIGH" SETTING (85dB AT 10-FEET).7.FIRE ALARM STROBES SHALL BE INSTALLED IN GROUP 2 (ACCESSIBLE) & CBH APARTMENTS ONLY. IN ALL OTHER APARTMENT BEDROOMS,BATHROOMS & LIVING ROOMS, PROVIDE JUNCTION BOX WITH COVER AND CONDUIT WITH PULLWIRE TO THE CLOSEST HORN/STROBE DEVICEALLOWING THE CAPABILITY TO INSTALL FUTURE STROBES.8.PANELBOARDS IN ALL GROUP 2 (ACCESSIBLE) UNITS MUST BE MOUNTED IN ACCORDANCE WITH REACH RANGE REQUIREMENTS SPECIFIED IN521 CMR, SECTION 6.00. TO COMPLY WITH SECTION 6.6, SIDE REACH REQUIREMENTS, PANELBOARDS IN ACCESSIBLE UNITS SHALL BE MOUNTEDSO THAT THE CENTERLINE OF THE TOP MOST BREAKER IS NO MORE THAN 54” ABOVE THE FINISH FLOOR. ALL OTHER APARTMENT UNITS MUSTHAVE THE ABILITY TO BE CONVERTED TO FULLY ACCESSIBLE UNITS IN THE FUTURE. COORDINATE WITH GC TO CONFIRM THAT WALL FRAMINGCAN BE MODIFIED TO ACCOMMODATE RELOCATION OF PANELBOARD TO ACCESSIBLE MOUNTING HEIGHT. EC SHALL PROVIDE SUFFICIENTLENGTH OF WIRING AT ALL PANELBOARDS TO ALLOW FOR FUTURE EXTENSION TO RELOCATED PANELBOARDS.9.ALL ELECTRICAL DEVICES (OUTLETS, LIGHTS, ETC.) SHALL BE POWERED FROM THE RESPECTIVE UNIT'S PANELBOARD.10.MOUNT DEVICES IN ACCORDANCE WITH MAAB & UFAS REQUIREMENTS. REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHTS.11.SEE MECHANICAL AND PLUMBING PLANS FOR EQUIPMENT DESIGNATIONS AND EXACT LOCATIONS.UNIT TYPE A-0 (STUDIO)UNIT TYPE B-1 (ONE-BEDROOM)UNIT TYPE C-1 (ONE-BEDROOM, CBH)PROVIDE POWER FOR ELECTRIC RANGE & OVEN. CONFIRM FINAL APPLIANCES WITH GC AND APPROVED SHOP DRAWINGS.PROVIDE POWER FOR DISHWASHER. COORDINATE EXACT LOCATION WITH ARCHITECTURAL DRAWINGS.PROVIDE 120V POWER FOR RANGE HOOD.GROUP 2 (ACCESSIBLE) & CBH UNITS: PROVIDE POWER FOR ELECTRIC COOKTOP & WALL OVEN. CONFIRM FINAL APPLIANCES WITH GCAND APPROVED SHOP DRAWINGS.BASIS OF BID:COOKTOP: 3#8 + #10G (Cu)OVEN:2#12 + #14G (Cu)GROUP 2 (ACCESSIBLE) & CBH UNITS: PROVIDE 120V POWER FOR RANGE HOOD WITH REMOTE ROCKER SWITCHES AT APRON FORCONTROL OF VENT/LIGHT OPERATION.PROVIDE 120V POWER FROM RESPECTIVE UNIT LOAD CENTER TO JUNCTION BOX ABOVE CEILING FOR FUTURE DOOR OPERATOR.-PROVIDE FLUSH MOUNTED BACK BOX WITH COVER IN WALL ON BOTH THE CORRIDOR AND UNIT SIDE OF THE DOOR FOR FUTUREDOOR OPERATOR PUSH PADDLES. PROVIDE CONDUIT AND WIRING BETWEEN FUTURE PUSH PADDLES AND DOOR OPERATOR.-SAFE-OFF WIRING FOR FUTURE DEVICES. COIL AND IDENTIFY.-REFER TO ADA DOOR OPERATOR DETAIL ON SHEET E5.1PROVIDE PROVISIONS FOR AUDIO/VISUAL IMPAIRED TENANT, INCLUDING AUDIO/VISUAL ALERT SYSTEMS FOR TELEPHONE ANDDOORBELL/INTERCOM SIGNALS.-FIELD COORDINATE EXACT LOCATIONS OF ALL DEVICES WITH OWNER'S REP.STRUCTURED MEDIA CABINET LOCATED IN APARTMENT UNIT CLOSET; FIELD COORDINATE EXACT LOCATION WITH OWNER'S REP. CABLETO MEDIA CABINET WILL BE BY OWNER'S VENDOR. EC SHALL BE RESPONSIBLE FOR DISTRIBUTING CATV, DATA AND TELECOM TO JACKSIN THE RESPECTIVE APARTMENT.-FIGURE ON ONE (1) FLUSH-MOUNT STRUCTURED MEDIA ENCLOSURE PER APARTMENT UNIT. BASIS OF DESIGN: LEVITON M/N 47605-28WOR APPROVED EQUAL. PROVIDE QUAD POWER OUTLET LOCAL FROM UNIT LOADCENTER.-PROVIDE 1" CONDUIT FROM ELECTRICAL ROOM ON FIRST FLOOR TO EACH MEDIA CABINET LOCATION.SHEET KEYED NOTESACS5HINT2ACS INT2PP-XPP-XHAC3ACS S3S3 HS3UNIT TYPE B-0 (STUDIO)UNIT TYPE C-0 (STUDIO)UNIT TYPE D-0 (STUDIO)UNIT TYPE D-1 (ONE-BEDROOM)UNIT TYPE A-1 (ONE-BEDROOM, GROUP 2, HEARING IMPAIRED)TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-29TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-05, 1-06, 1-07, 1-08SECOND FLOOR: 2-07, 2-08TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-03, 1-04TYPICAL FOR THE FOLLOWING UNITS:SECOND FLOOR: 2-29TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-01, 1-02TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-25, 1-26TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-27, 1-28SECOND FLOOR: 2-27, 2-28TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-10SECOND FLOOR: 2-09, 2-10INT2PP-XACACAC3HSSS3 INT2PP-XS3ACHACSSS3S3 ACPP-XACSS HSS3S3INT2INT2PP-XACACSS3AC SBSS S SSSBSACACACJJ4S4JSS3S3S S3SS 3 PP-XINT2SHS3PP-XINT25ACJ4S 6J6SS SS3 SBSSBSJ4ACACACST ST STSTTYPICAL FOR SHEETS E2.0 & E2.1TYPICAL FOR SHEETS E2.0 & E2.1HP1117TID7TID7UNIT TYPE E-1 (ONE-BEDROOM, HEARING IMPAIRED)TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-11UNIT TYPE F-1 (ONE-BEDROOM, ADAPTABLE)TYPICAL FOR THE FOLLOWING UNITS:SECOND FLOOR: 2-25, 2-26SACHINT2PP-XSBSACACSS3 S3SS13ACAC13ACACINT2 PP-XSBSSACSSS3 SS3 S TID7TID7STST HACHP1ACACACACACSHP1 ACAC313HP1SAC31A1A1A2A2A2A3A6A3A3A3A3A6A6A6A2A2A2A2A2A2A2A1A1A1A1A1A1AC31ACACA3A3A3HHP2HP2S A2A2A2A1A6A6A3A3A3A3A2A2A2A1A1ACST177cd177cd177cd ACS SA6AC31HP3ACACA1A1A3A3SS A3SA6177cd177cdA3A1A1HP2A3A3A1A2A2A2ST177cdACS A6ACSA6 A3A3HP2HP27A2A2A2A1A1A3A3177cd177cdST177cdA3 A2A2A2A1A1A3A37653421UNIT TYPE E-0 (STUDIO)TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-06ACSSA6HP1ACAC31ACINT2 PP-XHA2A2A3A1A1SS BATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENLIVING/SLEEPINGLIVING/SLEEPINGLIVINGSLEEPINGLIVING/SLEEPINGLIVING/SLEEPINGLIVINGDININGLIVINGLIVINGDININGLIVINGLIVINGDININGDININGLIVINGBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYSSBSSBSSBSSBSSBSSBSSBSSBSSBSSBSSB888888888888A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A2A2A2UC1UC3UC1UC1UC3UC1UC1UC1UC1UC1UC1UC1UC1UC1UC1UC2UC2UC1UC3UC1UC1UC3UC3UC1UC1UC2UC2UC1UC3SUC2UC2UC2UC2UC2UC2UC2SS SS S SS S SS DSDSD DD SDDDD D D DDDDDSDD DDS3 T2T2T2T2T2T2T1T2T2T1T1T2T1T2T1T2ESESESJ6PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-TYPICALAPARTMENT UNITELECTRICAL PLANS1/4" = 1'-0"E2.0 UNIT TYPE A-2 (TWO-BEDROOM)UNIT TYPE B-2 (TWO-BEDROOM)ACPP-XHSSB1ACSSSS ACSSBINT2 S3PP-XINT2S ACAC1SSBSSB3 S4 S3S3 SH SSACSUNIT TYPE C-2 (TWO-BEDROOM)UNIT TYPE D-2 (TWO-BEDROOM)UNIT TYPE D-3 (THREE-BEDROOM)UNIT TYPE A-3 (THREE-BEDROOM)UNIT TYPE B-3 (THREE-BEDROOM)UNIT TYPE C-3 (THREE-BEDROOM)TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-13, 1-14, 1-15, 1-16, 1-19, 1-20, 1-21, 1-22SECOND FLOOR: 2-13, 2-14, 2-15, 2-16, 2-19, 2-20, 2-21, 2-22TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-12, 1-23, 1-24SECOND FLOOR: 2-11, 2-12, 2-23, 2-24TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-30SECOND FLOOR: 2-30TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-31TYPICAL FOR THE FOLLOWING UNITS:SECOND FLOOR: 2-06TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-32SECOND FLOOR: 2-32TYPICAL FOR THE FOLLOWING UNITS:SECOND FLOOR: 2-31TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-05SS3S3 3 ACAC13HACACS S3 SSSS3S3S S3 SSBSSB13ACACACPP-XINT2PP-XINT2HSS3 SSBSSBSS S 3INT2PP-X13ACACAC2HACS S3 S4 S3SSBSSBSS ACSSSSBS3 S 13ACAC2HACSSS INT2PP-XACACSSBSSBSSBSSSSS3S3S3 S3 ACSSAC1AC2PP-XINT2SSBSSBSSBSSS S4S3SH13AC2ACACINT2PP-XHSSS S3SS3S4S3S3 SSBSSBSSB333UNIT TYPE E-2 (TWO-BEDROOM, GROUP 2)TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-095ACINT2 PP-XS ACACJJ4S4J6 STSTSTSBSSBSSSHS3SSS3 A6A1A2HP2A3A3A3A2A2ACACSA6SA1A2A2A2A1HP3ACA3A3HP3A3ACS SA6 A3A3A6ACA3A2A2A2A2S33S3 A3A3A3ACSA6S ACACA2A2A2A3HP3A3A3A1A1A1A1ACSA6SA3A3HP2A3A3ACA1A2A2A2A1HP3ACACSA6SA3A3A3A3S3A2A2A2A3A3HP4ACA3A3A1A1A2A2A2A2A3A3A3HP3ACA1A1A1A2A2A2A3A3ACSA6S ACSA6177cdACST177cd177cd177cdA3A3A3A3PP-XA1A1A1A2A2A2HP3UNIT TYPE F-2 (TWO-BEDROOM)TYPICAL FOR THE FOLLOWING UNITS:FIRST FLOOR: 1-17, 1-18SECOND FLOOR: 2-17, 2-18ACPP-XHSSB1ACSSSACSSBINT2S3SS33A6 A1A2HP2A3A3A3A2ACA1SS3BATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHROOMBATHBATHBATHBATHKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENKITCHENBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMBEDROOMENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYENTRYLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGLIVINGDININGDININGDININGDININGDININGDININGDININGDININGDININGDININGSSBSSBSSBSSBSSBSSBSSBSSBSSBSSBSSBSSBSSBSSB8888888888A1A1A1A1A1A1A1A1A1A1A1A1A1A1A1A6A1A1A1A1A1A1A1A1UC1UC1UC3UC1UC3UC3UC1UC3UC1UC1UC3UC1UC2UC2UC2UC1UC3UC1UC1UC1UC1UC1UC1UC1UC3UC1UC3UC1UC3UC1UC2ACUC2UC2UC2UC2UC1UC1UC2UC1UC2UC2UC2S S S S S S S SSSDDDDDDDDDDDDDD D DDDDD3D D D D DDD D D DD DDDDD D D DDDT2T1T1T1T2T1T1T2T2T2T2T2T2T2T2T2T1T1T1T2T1T1T1T2T1T1T1T2T1T1T1T2ESPROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-TYPICALAPARTMENT UNITELECTRICAL PLANS1/4" = 1'-0"E2.1 SCALE: N.T.S.TYPICAL PANEL GROUNDING3. NEUTRAL CONDUCTOR NOT SHOWN FOR CLARITY.BE SCRAPED FREE OF PAINT AND THOROUGHLY CLEANED TO INSURE PROPER BONDING.2. AT THE POINT OF ATTACHMENT OF THE GROUNDING LUG TO THE CABINET, THE SURFACES SHALL1. ALL WIRES TO BE NEATLY LACED.BONDED TO CABINET(TYPICAL)CONNECTIONSPLIT BOLTLOCKNUTSCONDUITBUSHINGGROUNDINGCONDUITNOTES:GROUNDING LUGGROUNDING WIREGREEN OR BARECABINETPANELGROUNDING LUGGROUND WIREGROUNDING LUGCONDUIT LOCKNUTINCOMINGGROUNDING BUSHINGFIN. FL.PROVIDE A FLUSH MOUNTED 4" SQUAREWALL OR COLUMN2-1/8" DEEP BOX. SEE NOTE 1.1" CONDUITVARIESCABLES & TERMINATION/WALL PLATE/ JACK BY ECPROVIDE DRYWALL TRIMDATA & COMMUNICATIONS OUTLET DETAIL1.EC RESPONSIBILITIES FOR DATA/VOICE SYSTEMS SHALL INCLUDE INSTALLATION OFFACEPLATES, JACKS, BOXES, CABLES, MISC. HARDWARE FOR CABLE SUPPORTS ANDROUTING OF CABLES TO PLYWOOD BACKBOARD IN MAIN ELECTRICAL ROOM. OWNER SHALLBE RESPONSIBLE FOR DATA/TELECOM SERVICES AND ANY HEAD-END EQUIPMENT. GC SHALLCOORDINATE INSTALLATIONS WITH OWNER'S IT/TELECOMM VENDORS.a.PROVIDE 12-FEET OF COILED CABLE FOR EACH “HOMERUN” AT PLYWOOD BACKBOARD.b.EACH FACEPLATE SHALL HAVE FOUR (4) POSITIONS: TWO (2) SPARE, ONE (1) DATAJACK/CABLE AND ONE (1) VOICE JACK/CABLE.c.CONTRACTOR SHALL INSTALL, TERMINATE, TEST AND LABEL ALL CABLES. PROVIDEOWNER WITH COPY OF TEST RESULTS.d.CABLING SHALL BE INSTALLED TO INDUSTRY STANDARDS.2.THE FOLLOWING ITEMS SHALL BE USED AS THE BASIS OF DESIGN:a.DATA CABLING: MOHWAK CAT6 YELLOW; MOHAWK PN. M57195 (PLENUM)b.VOICE CABLING: MOHWAK CAT6 BLUE; MOHWAK PN. M57193 (PLENUM)c.HUBBELL 4 POS. FACEPLATE (OFFICE WHITE); HUBBELL PN. IFP14OWd.HUBBELL DATA JACK (WHITE); HUBBELL PN. HXJ6We.HUBBELL VOICE JACK (BLACK); HUBBELL PN. HXJ6BK3.COORDINATE EXACT LOCATION & MOUNTING HEIGHT OF DATA & COMMUNICATIONS OUTLETSWITH OWNER'S REP.NOTES:HANGER(TYPE.)CABLES BY ECINSULATEDBUSHINGPROVIDEDECK CLG.SCALE: N.T.S.AT MINIMUM, ELECTRICAL CONTRACTOR SHALL PROVIDE TYPED LABELS WITH PTOUCHMACHINE TO INDICATE PANEL NAME AND CIRCUIT NUMBER. COORDINATE EXACT NAMINGSCHEME WITH FACILITY'S PERSONNEL.LABEL ALL DATA AND VOICE OUTLETS. LABEL SHALL BE CLEAR MYLAR.QUANTITY OF DATA PORTS AND RECEPTACLES MAY VARY. COORDINATE WITHELECTRICAL PLANS.NOTES:SEE NOTE 1PROVIDE COVERPLATE ANDRECEPTACLE. GENERALRECEPTACLES SHALL BEOF COLOR INDICATED BYARCHITECT1.2.3.PNL PB-X, CK #16LABELLABELSEE NOTE 2SCALE: N.T.S.ELEVATOR ELECTRICAL WORK DETAILPROVIDE FIRE CAULKINGAT RATED WALLSMICROPHONEILLUMINATOR LED"IN USE" INDICATORLIGHTNFC SENSORSENSOR (IF SENSOR DETECTSMOTION, LCD DISPLAY WILLILLUMINATE)CANCEL BUTTONFORWARD SEARCH BUTTONBACK SEARCH BUTTONCALL BUTTONCAMERA3.5" COLOR LCDDISPLAYSPEAKERKEYPADINTERCOM SYSTEM DETAILSVIDEO ENTRANCE STATIONSCREEN BRIGHTNESSCONTROLCALL TONE VOLUMECONTROLRECEIVE VOLUMECONTROLMICROPHONE3.5" COLOR LCDVIDEO SCREENDOOR RELEASEBUTTONADJUST BUTTONZOOM/WIDEBUTTONSPEAKEROPTION BUTTONTALK/OFFBUTTONSTATUSINDICATORLIGHTVIDEO TENANT STATIONPHOTOELECTRIC CONTROLUNIT-MOUNT AS HIGH ASPRACTICAL AND AWAY FROMTREES/SHRUBS ON NORTHFACE OF WALLLIGHTING CIRCUITPANELDESIGNATED SITE LIGHTINGBRANCH CIRCUITS.TO DESIGNATEDEXTERIOR BUILDINGMOUNTED AND SITEPOLE LIGHTINGFIXTURESCOMMERCIALLY AVAILABLECADDY L-BRACKETS.ORIENTATION AS REQUIRED.EXTERIOR LIGHTING CONTROL SYSTEM DETAILTIMECLOCK PANEL-SEE PLANS1. FOR THIS PROJECT, EXTERIOR LIGHTING INCLUDES EXTERIOR LIGHTING POLES,LANDSCAPE LIGHTING, EXTERIOR BUILDING MOUNTED FIXTURES AND CANOPYDOWNLIGHTS.NOTES:PANELBOARD CLEARANCE REQUIREMENTSNECWORKINGSPACE30" MIN.6'-6" MIN. 6'-0" (OR LESS)36" MIN.NECWORKINGSPACEPANELBOARDWALLPANELBOARDFIN. FL.FIN. CLG.FIN. FL.FIN. CLG.NEC DEDICATEDELECTRICALSPACESIDE VIEWELEVATION1.2.PER NFPA-70, 2017 EDITION, A DEDICATED ELECTRICAL SPACE IS DEFINED AS THE SPACEEQUAL TO THE WIDTH AND THE DEPTH OF THE EQUIPMENT EXTENDING FROM THE FLOOR TO AHEIGHT OF 6'-0" ABOVE THE EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER.SYSTEMS OR EQUIPMENT FOREIGN TO THE ELECTRICAL INSTALLATION, SUCH AS PLUMBING,HVAC PIPING, DUCTS AND EQUIPMENT, ARE NOT ALLOWED IN DEDICATED ELECTRICAL SPACEAND MUST BE INSTALLED OUTSIDE THIS SPACE.FOREIGN SYSTEMS (PIPING, ETC.) ARE ALLOWED IN THE AREA ABOVE THE DEDICATEDELECTRICAL SPACE, AT LEAST 6'-0" ABOVE THE EQUIPMENT, AS LONG AS THE ELECTRICALEQUIPMENT IS PROPERLY PROTECTED AGAINST LEAKS.IN THE STATE OF MASSACHUSETTS, SHORTER WORKING SPACE DEPTHS MAY BE PERMITTEDBY SPECIAL PERMISSION BY THE AHJ, IN ACCORDANCE WITH 527 CMR 12.00 (110.26(A)(1)).NOTES:3.FIN. FL.FIN. CLG.FIN. FL.FIN. CLG.SIDE VIEWELEVATIONWORKING SPACEDEDICATED ELECTRICAL EQUIPMENT SPACE4.NOTE: REFERENCE NEC ARTICLE 110 FOR UPDATES AND EXCEPTIONS.SCALE: N.T.S.CAST METAL"WHILE-IN-USE"WP COVER(S) &RECEPTACLE(S).CAST METAL, 2-GANG,NEMA 3R JUNCTIONBOX W/ THREADEDHUBSRIGID STEEL CONDUITFOR WIRING12" MAX [305 mm] 18" MAX [460 mm]AASECTION "A-A"ELEVATIONRIGID STEEL CONDUITFOR SUPPORT PER N.E.C.ART. 314ROOF PENETRATION ANDCONDUIT SUPPORTRECEPTACLE ROOF MOUNTING DETAILCAST METAL"WHILE-IN-USE"WP COVER(S) &RECEPTACLE(S).RIGID STEEL CONDUITFOR SUPPORT PERN.E.C. ART. 314RIGID STEEL CONDUITFOR WIRINGTYP. RECEPTACLE & TEL/DATA OUTLET LABELSSCALE: N.T.S.SCALE: N.T.S.ELECTRIC SERVICE EQUIPMENT CLEARANCE REQUIREMENTSFIN. CLG.FIN. CLG.NECWORKINGSPACENECWORKINGSPACEELECTRICSWITCHBOARDELECTRICSWITCHBOARDELECTRICSWITCHBOARDFIN. FL.FIN. FL.CONDITION #1CONDITION #3INSULATED WALL(i.e. WOOD,PLASTER)EXPOSEDLIVE PARTSEXPOSEDLIVE PARTSFIN. CLG.NECWORKINGSPACEELECTRICSWITCHBOARDFIN. FL.CONDITION #2GROUNDED WALL(i.e. CONCRETE,STEEL)EXPOSEDLIVE PARTSNEC DEDICATEDELECTRICALSPACE6'-0"(OR LESS)NEC DEDICATEDELECTRICALSPACE6'-0"(OR LESS)NEC DEDICATEDELECTRICALSPACE6'-0" (OR LESS)NEC DEDICATEDELECTRICALSPACENOMINALVOLTAGE TO GROUND(L-N)MINIMUM CLEAR DISTANCECONDITION #1CONDITION #2CONDITION #30-1503'-0"3'-0"3'-0"151-6003'-0"3'-6"4'-0"601-1,0003'-0"4'-0"5'-0"1,001-2,5003'-0"4'-0"5'-0"2,501-9,0004'-0"5'-0"6'-0"9,001-25,0005'-0"6'-0"9'-0"1.2.PER NFPA-70, 2023 EDITION, A DEDICATED ELECTRICAL SPACE IS DEFINED AS THE SPACEEQUAL TO THE WIDTH AND THE DEPTH OF THE EQUIPMENT EXTENDING FROM THE FLOOR TO AHEIGHT OF 6'-0" ABOVE THE EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER.SYSTEMS OR EQUIPMENT FOREIGN TO THE ELECTRICAL INSTALLATION, SUCH AS PLUMBING,HVAC PIPING, DUCTS AND EQUIPMENT, ARE NOT ALLOWED IN DEDICATED ELECTRICAL SPACEAND MUST BE INSTALLED OUTSIDE THIS SPACE.FOREIGN SYSTEMS (PIPING, ETC.) ARE ALLOWED IN THE AREA ABOVE THE DEDICATEDELECTRICAL SPACE, AT LEAST 6'-0" ABOVE THE EQUIPMENT, AS LONG AS THE ELECTRICALEQUIPMENT IS PROPERLY PROTECTED AGAINST LEAKS.IN THE STATE OF MASSACHUSETTS, SHORTER WORKING SPACE DEPTHS MAY BE PERMITTEDBY SPECIAL PERMISSION BY THE AHJ, IN ACCORDANCE WITH 527 CMR 12.00 (110.26(A)(1)).NOTES:3.SEE TABLEBELOWSEE TABLEBELOWSEE TABLEBELOW4.NOTE: REFERENCE NEC ARTICLE 110 FOR UPDATES AND DETAILED CONDITION DEFINITIONS.SCALE: N.T.S.KEY NOTESPROVIDE FUSIBLE DISCONNECT SWITCH WITH DUAL ELEMENT TIME DELAY FUSES DIAGRAM WITHAUXILIARY CONTACTS AND ALARM CONTACTS.MOUNT WITHIN 18" OF STRIKE SIDE OF DOOR ELEVATOR MACHINE ROOM. THE SWITCH SHOULD NOTEXTEND MORE THAN 5'-6" AFF.OMITTEDPROVIDE DEDICATED CIRCUIT FOR LIGHTING AND RECEPTACLE. CONNECT CIRCUIT TO LUMINAIRESUPSTREAM OF GFCI RECEPTACLE. (TYP. FOR MACHINE ROOM, ELEVATOR PIT & TOP OF SHAFT).ROOM LIGHTING; SEE FLOOR PLAN FOR TYPE AND QUANTITY.PROVIDE DEDICATED LOCKABLE 15-AMP/1-POLE FUSED DISCONNECT WITH DEDICATED 120-VOLT,20-AMP CIRCUIT FOR ELEVATOR CAR LIGHTING, ALARM CIRCUIT. PROVIDE GFCI BREAKER IN SOURCEPANEL.PROVIDE SMOKE DETECTOR FOR ACTIVATION OF ELEVATOR RECALL.COORDINATE SPACING FOR ALL ELECTRICAL EQUIPMENT WITH ELEVATOR SUPPLIER/INSTALLER PRIORTO ROUGH-IN.PROVIDE DEDICATED PHONE LINE IN 1" CONDUIT TO TELEPHONE TERMINAL BOARD AND ALLPERTINENT TERMINATIONS UNLESS OTHERWISE NOTED. COORDINATE EXACT REQUIREMENTS ANDLOCATION OF TERMINATION WITH ELEVATOR VENDOR.PROVIDE SURFACE MOUNTED LED STRIP LIGHT WITH WIRE GUARD. MOUNT ONE LUMINAIRE ON THEFRONT ELEVATOR PIT WALL OR TOP OF SHAFT AS APPLICABLE. THE SECOND ON THE OPPOSITE WALL.MOUNT LUMINAIRES SUCH THAT LIGHT IS NOT OBSTRUCTED BY BEAMS OR OTHER STRUCTURES.MOUNT WEATHERPROOF TOGGLE SWITCH FOR PIT & TOP OF SHAFT LIGHTING CIRCUIT SO THAT IT ISREADILY ACCESSIBLE FROM THE ACCESS DOOR.PROVIDE GFCI OUTLET FOR ELEVATOR PIT SUMP PUMP. MOUNT ON AREA OF PIT WALL ADJACENT TOSUMP HOLE. PROVIDE DEDICATED CIRCUIT. SEE PANEL SCHEDULES FOR CIRCUIT NUMBER.PROVIDE A STOP SWITCH THAT IS TO:a.BE OF THE MANUALLY OPENED AND CLOSED TYPE,b.HAVE A RED OPERATING HANDLES OR BUTTON,c.BE CONSPICUOUSLY AND PERMANENTLY MARKED "STOP", AND SHALL INDICATE THE "STOP"AND "RUN" POSITIONS.d.MOUNT THE SWITCH ADJACENT TO THE NEAREST POINT OF ACCESS TO PIT/TOP OF SHAFTFROM THE ACCESS DOOR.CONNECT FIRE ALARM SYSTEM FOR MONITORING OF CONTROL POWER AND ELEVATOR EMERGENCYRECALL OPERATION. PROVIDE (4)#12, (1)#12G, 3/4"C.MOUNT SMOKE DETECTOR IN ELEVATOR LOBBY ON CEILING TO WITHIN 6.4 M (21'-00") OF ELEVATORDOOR. EXCEPT FOR LOBBY CEILING CONFIGURATIONS EXCEEDING 4.6 M (15'-0") IN HEIGHT OR THATARE OTHER THAN FLAT AND SMOOTH LOCATION OF DETECTORS MUST BE DETERMINED PER CHAPTER2 OF NFPA 72.151413111098765432112SMOKE DETECTOR459214111312414961#4AWG, CuS7101015715DISTRIBUTION PANELELEVATOR FEEDER FROM POWERWIRING BY ELEVATOR INSTALLERTO PHONE SYSTEMTO FAS (ELECT. ROOM)ELEVATOR CONTROLLER/DRIVEWPGFIWPGFI24"24"24"S WIRING SCHEMATICHOISTWAY ELEVATIONELEVATOR CONTROLLERTYPICAL ELEVATOR MACHINE ROOM PLANPITELEVATORLOBBYTYPICAL ELEVATORLOBBYTYPICAL ELEVATORHOISTWAYELEVATORPROVIDE ADDRESSABLE FIRE ALARM CONTROL RELAY ANDWIRING AND ALL PERMANENT TERMINATIONS FROM PANEL TOELEVATOR CONTROLLER TO ACTIVATE FIREMAN HAT LIGHT INELEVATOR CAB UPON INITIATION OF SMOKE DETECTION INELEVATOR HOISTWAY OR MACHINE ROOM.PROVIDE ADDRESSABLE FIRE ALARM CONTROL RELAY AND WIRING ANDALL PERTINENT TERMINATIONS TO ELEVATOR CONTROLLER/DRIVE FORELEVATOR PRIMARY RECALLPROVIDE ADDRESSABLE FIRE ALARM CONTROL RELAYFROM PANEL TO ELEVATOR CONTROLLER FOR ELEVATORALTERNATE RECALLELEVATOR CAR LIGHTSFROM POWER DISTRIBUTION PANELFUSEDDISCONNECTSWITCHFUSIBLEDISCONNECTSWITCH-200A, 3P W/175A FUSESBATTERY LOWERINGDEVICECONTROL WIRINGWPGFI24"13101024"411SSCALE: N.T.S.PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-ELECTRICALDETAILSN.T.S.E5.0 SERVICE GROUNDING DETAILABNCABC#4/0 SDBCBURIEDUTILITY PAD MOUNTTRANSFORMERDRIVEN GROUNDROD (TYP. OF 2)MAINDISC.SWITCHMBUILDINGSTEELGROUNDING RINGCOLD WATER MAINFROM WELLSTREET SIDE#3/0 COPPERBONDING COND.#3/0 COPPERBONDING COND.GND. BAR IN MAINELEC RMSGND. BUS.NEUT. BUS.#3/0 COPPERBONDING COND.#3/0 COPPERBONDING COND.#3/0 COPPERBONDING COND.SERVICE RATED EQUIPMENTCONCRETEFOUNDATIONPRIMARYSECONDARY12"12"12"24"8-FOOT COPPERWELD GROUNDRODTYPE "C"COMPRESSIONCONNECTOR2/0 Cu BARESOFT DRAWN19 STRANDDETAIL ADETAIL B12"GRADE2/0 Cu BARESOFT DRAWN19 STRANDGROUNDCLAMP(TOP VIEW)GROUNDCLAMPDETAIL B(TYP.)DETAIL A(TYP.)8-FOOT COPPER WELDGROUND RODBURIED CONDUIT DETAILRIGID STEELCONDUIT (RSC)SCHEDULE80 PVCRIGID STEELCONDUIT (RSC)SCHEDULE80 PVCCONCRETESURFACESEALANT ALLAROUNDPVC SLEEVE 1"ØLARGER THANRSCLANDSCAPEDSURFACE(GRASS, ETC.)REFER TO PIPETRENCH DETAIL FORCONDUIT BEDDINGMATERIALTRANSITIONCOUPLING(TYP.)TYPICAL TRENCHING DETAILNOTES:1.ALL PVC CONDUIT SHALL BE ELECTRICAL GRADE LISTED AND LABELED FOR DIRECT BURIAL. PVCCONDUIT MAY ONLY BE UTILIZED WHERE CONDUIT IS BURIED AND AS INDICATED IN THE SPECIFICATIONS.TRANSITION FROM PVC TO RSC (SEE BURIED CONDUIT DETAIL) PRIOR TO EXITING TRENCH.2.CAUTION TAPE SHALL BE RED WITH A CONTINUOUS PRINTED WARNING MESSAGE IN BLACK INACCORDANCE WITH ELECTRICAL UTILITY COMPANY & NEC REQUIREMENTS.3.ALL CONDUIT SHALL BE SIZED IN ACCORDANCE WITH THE NEC.TRENCHING AND BACKFILLINGUNDERGROUND CONDUCTORS AND RACEWAYFREE FROM ROCKSUITABLE BACKFILL MATERIALCONCRETE/SEED/OTHER BY GC24" MIN.FINISH GRADE12"- SEE NOTE 1WARNING TAPEAS REQ'D- QUANTITIES MAY VARYSCALE: N.T.S.SCALE: N.T.S.SCALE: N.T.S.J1.ALL LOW VOLTAGE WIRING SHALL BE FURNISHED AND INSTALLED BY ELECTRICAL CONTRACTOR. SECURITYEQUIPMENT SHALL BE BY SECURITY VENDOR.2.COORDINATE EXACT LOCATIONS AND MOUNTING REQUIREMENTS OF ALL DEVICES WITH THE ARCHITECTURALDRAWINGS.3.PROVIDE INSULATED BUSHINGS ON ALL CONDUITS.4.ELECTRIC DOOR STRIKES AND HINGES SHALL BE FURNISHED AND INSTALLED BY THE HARDWARE CONTRACTOR.5.VERIFY DOOR HARDWARE CONNECTIONS WITH MANUFACTURER'S INSTALLATION MANUAL.STUB INTO DOOR FRAMEFOR WIRING OF ELECTRICALDOOR STRIKE.STUB DOWN INWALL FOR WIRINGTO DEVICESJ-HOOKS AS REQUIRED BACKTO COMMUNICATION CLOSET-CABLING BY EC18/4 AWG IN CONCEALEDCONDUIT BY ELECTRICALCONTRACTORJUNCTION BOX (SIZE & QUANTITY ASREQUIRED) MOUNTED ON STRUCTURALCEILING (TYP.)PRE-INSTALLED ELECTRICDOOR STRIKEDOORJAMBDOOR CONTACTCONCEALED IN DOORJAMB AND IN DOORSTUB INTO DOOR FRAME FORWIRING OF DOOR CONTACTSJKEY FOB PANEL (LOCATEDOUTSIDE SECURED AREA).ELECTRICAL CONTRACTORSHALL PROVIDE FLUSHMOUNTED BACK BOX.NOTES:STRUCTURAL CEILINGESKFDOOR ACCESS CONTROL DETAILSCALE: N.T.S.J120V POWER CIRCUITFOR ELECTRIC STRIKEPOWER SUPPLYTHREE-PHASE PRIMARY CABLE INSTALLATION - DIRECT BURIED CONDUITSCALE: N.T.S.FINISH GRADE12"CAUTION TAPENOTES:1.CONDUIT SIZE AND QUANTITY AS INDICATED ON PLAN(S) AND/OR SCHEDULES.2.ENSURE BOTTOM OF TRENCH IS WELL-TAMPED AND FREE OF ROCKS.3.INSTALL CONDUIT, GLUING ALL COUPLINGS.4.INSTALL SECONDARIES AND OTHER UTILITY CABLES OR CONDUITS IN TRENCH.5.BACKFILL WITH 12-INCHES CLEAN FILL, NOT TO CONTAIN STONES LARGES THAN 2-INCHES MAX. DIAMETER.10.INSTALL CABLE WARNING TAPE 12-INCHES OVER CONDUIT. CAUTION TAPE SHALL BE RED WITH A CONTINUOUS PRINTED WARNINGMESSAGE IN BLACK IN ACCORDANCE WITH NATIONAL GRID & NEC REQUIREMENTS.11.FILL IN REMAINDER OF TRENCH WITH NATIVE BACKFILL.12.INSTALL PULL LINE, INCLUDING 10-FEET OF SLACK, AND SECURE TO CONDUIT PLUG AT EACH END OF CONDUIT RUN. 1/4-INCH DIAMETERNYLON PULL LINE AND PLASTIC CONDUIT PLUGS TO BE SUPPLIED AND INSTALLED BY CONTRACTOR.14.TRENCH SHALL BE BACKFILLED IMMEDIATELY FOLLOWING PLACEMENT OF CONDUIT.15.COMPLY WITH UTILITY TRENCH SPECIFICATIONS.30" MIN.-NOTE 4CLEAN FILLCONCRETE/SEED/OTHER BY GCAS REQ'DCONDUIT FOR PRIMARY CABLE(SCHEDULE 40 PVC)SECONDARY AND/OR OTHERUTILITIES WITH OR WITHOUTCONDUITTRENCHING AND18" MIN.IN ALLDIRECTIONSFUEL ORWATER LINEBACKFILLINGSCALE: N.T.S.GEN EPOWARNINGTHIS BUTTON SHUTS DOWNGENERATOR POWER USE FOREMERGENCY SHUTDOWNONLY.GENERATOR REMOTE EMERGENCY STOP DETAILRUN 4#14 AWG WIRESFROM E-STOP TOGENERATOR SETTO GENERATORNOTES:1.EPO SHALL BE PROVIDED FOR SELECTIVESHUTDOWN OF GENERATOR. BASIS OFDESIGN: PILLA M/N ST120ES W/P1LCLHCOV1 ACCESSORY.2.PROVIDE 4#14 WIRES FROM E-STOP TOGENERATOR. (2) FOR ACTION TO TIE INTOALARM FOR REMOTE STOP.3.EPO SHALL SHUT DOWN GENERATOR ANDOPEN THE BREAKER IN ACCORDANCE WITHNEC 445.18 AND NFPA 110.SCALE: N.T.S.WEATHERPROOFENCLOSURECONDUIT SHALL BE INSTALLED PER NATIONAL GRID STANDARDS BEFORE SLAB IS POURED.CONDUITS SHALL BE RAISED A MINIMUM OF 1 INCH OVER THE CONCRETE SLAB. EXPANDING FOAM HILTI INC. (CF810) SHALL BEUSED TO FILL INSIDE THE CONDUITS AFTER THE PRIMARY/SECONDARY CONDUIT ARE INSTALLED.AFTER PULLING TAPE IS IN, INSTALL THE EXPANDING FOAM IN ANY SPARE/EMPTY CONDUITS. PLACE A RAG INTO EMPTY CONDUITSPRIOR TO THE FOAM AS A SUPPORT FOR THE FOAM WHILE CURING TAKES PLACE.AFTER THE CONCRETE PAD IS CURED, THE REMAINDER OF THE CONDUIT PRIMARY AND SECONDARY OPENINGS THROUGH PADSHALL BE SEALED WITH GROUT. BEFORE SEALING STEEL SWEEPS, THE SWEEPS SHALL HAVE A BOND CLAMP ATTACHED WITH A #4CU TAP TO CONNECT TO THE GROUND GRID.FILL THE CONDUIT PRIMARY AND SECONDARY OPENINGS WITH SAND (NO AGGREGATE) TO A GRADE OF APPROXIMATELY 2 INCHESBELOW THE TOP OF THE CONCRETE PAD. PLACE A LAYER OF CONCRETE GROUT (NO AGGREGATE) 1 TO 2 INCHES THICK ON TOP OFTHE SAND LAYER TO SEAL THE CONDUIT ENTRANCE. DO NOT COVER THE CONDUIT GROUND CLAMPS WITH GROUT. EXPANDINGFOAM MAY BE USED AS AN ALTERNATE FOR FILLING IN THE OPENING WITH SAND AND CONCRETE GROUT.CONDUIT LAYOUT: WINDOW IN PAD FOR PRIMARY CONDUCTORS AND SECONDARY CONDUCTORS SHALL BE COORDINATED WITHTRANSFORMER.SEE SITE AND ELECTRICAL PLANS/RISERS FOR QUANTITIES OF CONDUIT.5'-4"6'-9"12"8"15"22"15"8"6"TRANSFORMER CONDUIT NOTES:1.2.3.4.5.CONCRETE SHALL BE A MIX M-4, 5% PLUS OR MINUS 1.5% AIR ENTRAINMENT, 3,000 PSI AT 28 DAYS, 1-1/2" MAXIMUM AGGREGATE, 2"MAX SLUMP, IN ACCORDANCE WITH ASTM C94. TOP SURFACE SHALL BE TROWEL FINISHED.REINFORCING IN PAD SHALL BE #5 GRADE 60 BARS AND SHALL CONFORM TO ASTM STANDARD A-615 OF LATEST DATE.REINFORCING RODS ARE TO BE LOCATED IN CENTER OF THE SLAB, WITH A MINIMUM OF 2 INCHES OF CLEARANCE FROM FACE OFCONCRETE.ALL TRANSFORMER PADS MUST HAVE AND ADEQUATE BASE OF SAND AND GRAVEL. GRAVEL SHALL BE THOROUGHLY COMPACTEDAND THE SAND THOROUGHLY WETTED IMMEDIATELY BEFORE PLACING THE CONCRETE.THE LOCATION OF THE CONCRETE TRANSFORMER PAD SHALL BE APPROVED BY NATIONAL GRID PRIOR TO CONSTRUCTION.PROVIDE NATIONAL GRID WITH SUFFICIENT NOTIFICATION (24 HOURS MINIMUM) TO INSPECT THE FORMING AND REINFORCING OFTHE PAD, SUB GRADE PREPARATION, AND GROUND GRID PRIOR TO THE POURING OF CONCRETE.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING EXACT DIMENSIONS/LAYOUT OF TRANSFORMER PAD AND CURB WITHNATIONAL GRID PRIOR TO COMMENCING THE WORK. DIMENSIONS/LAYOUT SHOWN FOR BIDDING PURPOSES.TRANSFORMER PAD NOTES:1.2.3.4.6.5.CONCRETETRANSFORMERPAD7.PRIMARYSECONDARY6"REINFORCING#5@12" MAXIMUMSPACING ON CENTEREACH WAY MID-DEPTH3/4" CHAMFER10" 4"FINISHEDGRADEUNDISTURBED EARTHSANDGRAVEL12"10"2"3/4" CHAMFERCONCRETETRANSFORMERPAD1"SCHED. 80 PVC CONDUITW/PRIMARY CONDUCTORSSCHED. 80 PVC CONDUITW/SECONDARY CONDUCTORSTRANSFORMER EQPT. PAD DETAILSOIL CONTAINMENT CURB DETAILSEE OIL CONTAINMENT CURBDETAIL THIS SHEETSCALE: N.T.S.FOR EXACTCONCRETE SLABDIMENSIONS ANDDETAILS SEENATIONAL GRIDSPECIFICATIONSREBARREINFORCINGGROUND GRID2'-6"12"2'-6"12"12"2'-6"2'-6"12"30"6"24"CONDUITSWEEPGROUND RODREBAR (TYP.)SEALGROUND GRIDSEE TRANSFORMER PADDETAIL THIS SHEETFINAL GRADE6"CRUSHEDROCKSANDCONCRETEWALL (TYP.)COMPACTED GRAVELGEOTEXTILE FABRICSITE CONTRACTOR TO PROVIDE CONCRETE BOLLARDSINSTALLED PER UTILITY PLANNER DIRECTION IN FIELD-TO BE CONFIRMED IF REQUIRED WITH UTILITY PLANNEROIL CURB SHOULD BE INSTALLED WITH CONCRETE IN ACCORDANCE WITHUTILITY SPECIFICATIONS. REINFORCEMENT TO BE #4, GRADE 60 RODSMINIMUM, 6 INCHES ON CENTER, BEND RODS AROUND CORNERS. CURB TO BE24" DEEP WITH A MINIMUM THICKNESS OF 6".INSTALL GEOTEXTILE LINER FROM TOP OF WALLS AND AROUND BOTTOM OFCONTAINMENT AREA. IN AREAS WHERE CONDUIT CROSSES, OVERLAP LINERAROUND CONDUIT AND SEAL WITH EXPANDING FOAM.a GEOTEXTILE LINER SHALL BE 16oz POLYPROPYLENE GEOTEXTILE, ALSOCALLED FILTER FABRIC, WEIGHING 16oz/sq yd.INSTALL 6" OF SILTY SAND ON TOP OF LINER.INSTALL SECOND LAYER OF GEOTEXTILE LINER AS NOTED IN STEP 2.BUILDING UP AREA FOR TRANSFORMER PAD WITH 6" OF COMPACTED GRAVELAND LEVEL.INSTALL GROUND GRID.SET/BUILD TRANSFORMER PAD.FILL IN CONDUIT OPENINGS WITH SILTY SAND OR EXPANDING FOAM UP TOTHE LAST TWO INCHES OF THE PAD. FILL REST OF CONDUIT OPENING WITHCONCRETE GROUT OR EXPANDING FOAM.FILL AREA BETWEEN SLAB AND CURB WITH 1-1/2 INCHES UNIFORMLY GRADEDCRUSHED ROCK.OIL CONTAINMENT CURB NOTES:1.2.3.4.5.6.7.8.9.NOTE: EC SHALL BASE BID ON OIL CONTAINMENT CURB AND FIELD CONFIRMWITH UTILITY PLANNER. CERTAIN PLANNERS MAY OPT TO OMIT OIL CURBINGDUE TO TYPE OF TRANSFORMER PROVIDED BY UTILITY.SCALE: N.T.S.13-12 AWGIN 3/4" EMT120V ACBY ELECTRICALCONTRACTOR3-12 AWG IN CONCEALEDCONDUIT BY ELECTRICALCONTRACTORCONCEALED CONDUITBY ELECTRICALCONTRACTORPUSHBUTTON(BEYOND)FLUSH MOUNTED BOXBY ELECTRICALCONTRACTOR,COORDINATE EXACTLOCATION WITH THEARCHITECT PRIOR TOROUGH-INDOOR OPERATOR18/4 AWG INCONCEALED CONDUITBY ELECTRICALCONTRACTORCEILINGJUNCTION BOX BYELECTRICALCONTRACTORNOTES:1. DOOR OPERATOR AND PUSHBUTTONS BY DOOR HARDWARE VENDOR.2. ROUTING OF ALL EXPOSED RACEWAYS MUST BE APPROVED BY THE ARCHITECT PRIOR TOINSTALLATION.3. DOOR OPERATOR & PUSHBUTTONS TO BE WIRED BY THE ELECTRICAL CONTRACTOR.VERIFY WIRING WITH DOOR & OPENER MANUFACTURER PRIOR TO INSTALLATION.4. PROVIDE RELAY TO INTERFACE WITH ACCESS CONTROL SYSTEM IF APPLICABLE.ADA DOOR OPERATOR DETAILPUSHBUTTONTRANSFORMER GROUNDING DETAILSCALE: N.T.S.PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-ELECTRICALDETAILSN.T.S.E5.1 SERVICE CONDUCTORS WITH 6 SETS OF 4-#600KCM (CU) IN 5-4" PVC SCH. 80 U.G. (COORDINATEWITH UTILITY AND OWNER) + (1) 4" SPARE WITHPULL WIRES1000kVA PAD MOUNTEDUTILITY TRANSFORMER120/208V, 3Ø, 4WSECONDARY VOLTAGEPRIMARY CONDUCTORSBY UTILITY-SEE SHEET E001SWITCHGEAR 120/208V, 3000A, 3Ø, 4W, 42 KAIC-CONFIRM 55,600 KAIC WITH UTILITY PLANNERPRIOR TO EQUIPMENT ORDER125A/2P PP1-25APT.PANEL120/208V,1Ø, 3W,125A MLO,22K AIC125A/2P PP1-11APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-11APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-13APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-13APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-15APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-15APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-17APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-17APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-19APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-19APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-21APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-21APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-09APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-09APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-23APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-23APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC200A/3P MDP-1 120/208V, 1200A, 3Ø, 4W, 42 KAIC34AFLAELEV60A/3PELEVATORCONTROLLER200A/3P SPD60A/3P HP-1A120/208V3Ø, 4W200A MLO10KAICHP-2A120/208V3Ø, 4W10KAICPROVIDE APARTMENT LOAD CENTERW/ SURGE PROTECTIVE DEVICE (TYP.)-BASIS OF DESIGN: EATON M/N CHSPT2ULTRAFEEDER/BRANCH CIRCUIT SCHEDULE (600V AND BELOW)WIREDESIGNATION(AMP/#WIRES)CONDUITSIZEWIRE SIZE(AWG IF NOTOTHERWISENOTED)NEUTRALWIRE SIZEGROUNDWIRE SIZEREMARKS(3) 3"(3)#300KCMIL(1)#300KCMIL(1)#1/01-1/2"(3)#4-(1)#101-1/2"(3)#4(1)#4(1)#10NOTES1.FOR ALL FEEDERS WITH MULTIPLE CONDUITS. PROVIDE THE INDICATED PHASE,NEUTRAL AND GROUND WIRES IN EACH CONDUIT.2.ALL FEEDER SIZES BASED ON COPPER, CONDUCTOR MATERIALS.3.NOT ALL FEEDERS ARE NECESSARILY USED. REFER TO ONE LINE DIAGRAM,MOTOR AND EQUIPMENT SCHEDULE, PLANS FOR ACTUAL FEEDERS REQUIRED.4.IF NOT OTHERWISE NOTED USE 3/4" CONDUIT WITH (2)#12, (1)#12 G. FOR 2-WIREFEEDER/BRANCH CIRCUIT AND 3/4" CONDUIT WITH (3)#12, (1)#12 G. FOR 3-WIREFEEDER/BRANCH CIRCUIT.5.FEEDER SHOWN CONSISTS OF TWO PHASE WIRES. THE SAME DESIGNATION ISALSO APPLICABLE FOR FEEDER WITH ONE PHASE WIRE AND A NEUTRAL WIRE.6.FOR ALL FEEDERS UPSIZED DUE TO VOLTAGE DROP PROVIDE TERMINALBLOCKS OR OTHER APPROVED MEANS TO TERMINATE WIRES.7.DO NOT PROVIDE GROUNDING WIRE WITH SERVICE CONDUCTORS. SEE RISERFOR SERVICE SIZE.2"(2)#1/0(1)#1/0(1)#62"(3)#1/0(1)#1/0(1)#6NOTE 5SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1COORDINATION WITH UTILITY:1.EC SHALL CONFIRM MAXIMUM ANTICIPATED FAULT CURRENTWITH UTILITY PLANNER PRIOR TO EQUIPMENT ORDER.2.EC SHALL CONFIRM SWITCHBOARD AND METERINGEQUIPMENT DURING SHOP DRAWING PROCESS. NOEQUIPMENT SHALL BE RELEASED UNTIL UTILITY HASAPPROVED EQUIPMENT.40A/2P EV CHARGING STATION 40A/2P EV CHARGING STATION1200AT1200AF (4) 3"(3)#350 KCMIL(1)#350KCMIL(1)#3/0(2) 3"(3)#350KCMIL(1)#350KCMIL(1)#11200/4125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3125/3125/3125/3125/3125/3125/32 400/4 125/3 200/4 200/4 UTILITY ELECTRICAL SERVICE REQUEST STATUSUTILITY: NATIONAL GRIDADDRESS:737 BRIDGE STREETGREAT BARRINGTON, MA 01230UTILITY PROJECT MANAGER: TBDESR NUMBER: TBDUTILITY PLANNER: TBDACTION STATUS: EC SHALL COORDINATE WITH UTILITY FORSERVICE UPGRADE.60A/3P 60/4 CONFIRM FINAL FUSES W/APPROVED ELEVATORSHOP DRAWINGS (TYP.)(TYP.)SPD1NOTE 1NOTE 1NOTE 11PANEL DP-1, 120/208V, 3Ø, 4W, 400A MLO, 22 KAIC400A3P600A3PSPD60A3P2500AMAINBREAKERMETERING CONFIGURATIONTO BE CONFIRMED WITHNATIONAL GRIDMSURGE PROTECTIONDEVICEHOT SEQUENCEUTILITY METER2400A3P400/4 1200A3P1200A3PALTERNATE METERLOCATION IF ACCEPTABLETO UTILITY PLANNERPANEL DP-2, 120/208V, 3Ø, 4W, 400A MLO, 22 KAIC200A/3P MDP-2 120/208V, 1200A, 3Ø, 4W, 42 KAIC34AFLAELEV60A/3P200A/3P SPD60A/3P HP-1B120/208V3Ø, 4W200A MLO10KAICHP-2B120/208V3Ø, 4W200A MLO10KAIC40A/2P 40A/2P1200AT1200AF 200/4 200/4 60A/3P 60/4 FUTURE EV CHARGING STATION FUTURE EV CHARGING STATION1200/425kW, 120/208V, 3-PHASE PROPANE GENERATORIN ATTENUATED, WEATHERPROOF ENCLOSURE-NOTE: GENERATOR NEUTRAL SHALL NOT BEGROUNDED AT THE GENERATOR (NOTSEPARATELY DERIVED) IN ACCORDANCE WITHNEC ARTICLE 250, EXHIBIT 250.BGFI RECEPTACLEIN WEATHERPROOF"IN-USE" ENCLOSUREWP100A/3PGENERATORSTANDBYANNC1"C FOR CONTROL WIRING TOANNUNCIATOR (DC SIGNAL)51-1/2"C TO PANEL MDP-2 FOR GENERATORAUXILIARY POWER:-CKT 36/38: 2P/20A, BATTERY CHARGER-CKT 40/42: 2P/20A, BLOCK HEATER-CKT 34: 1P/20A, WEATHERPROOF RECEPTACLE-CKT 44/46: 2P/20A, COOLANT HEATER3100A/3P 100/4 40A/2P 40A/2P FUTURE EV CHARGING STATIONNATS-SB100A3P, 4W100/4E PP-SB1120/208V3Ø, 4W100A MLO35-KAIC100/4 STANDBYPANELSEE ELECTRICAL PLANSFOR LOCATION OF REMOTEANNUNCIATOR(2) 2-1/2"(3)#3/0(1)#211"C FOR CONTROLWIRING TO ATS(DC SIGNALS)461-1/2"(3)#1(1)#1(1)#82-1/2"(3)#3/0(1)#3/0(1)#6REMOTE EMERGENCYPOWER OFF (EPO) SWITCHMOUNTED ON POST FORGENERATOR-TIE INTO GENERATOR-SEE DETAIL(1)#3/0400A3PSOLAR PVRAPIDSHUTDOWNDISCONNECT400A SERVICE RATED VISIBLE BREAK DISCONNECT FUSED AT 400A-FIELD COORDINATE EXACT SOLAR PV REQUIREMENTS WITH SOLAR PV PROVIDERTO SOLAR PV ARRAYBY PV CONTRACTOR400A/3PFIELD CONFIRM ROUTING OF OUTDOOR CONDUIT/WIRING WITH DIG SAFE PRIOR TO INSTALLATION.APPROXIMATE LOCATION OF NEW 1000kVA PAD MOUNTED UTILITY TRANSFORMER FURNISHED & INSTALLED BYNATIONAL GRIDELECTRICAL CONTRACTOR MUST PROVIDE THE FOLLOWING:A.TRANSFORMER PAD FOUNDATION PER NATIONAL GRID SPECIFICATIONSB.GROUNDING GRID PER NATIONAL GRID SPECIFICATIONSC.PRIMARY CABLE TRENCH SHALL BE BY SITE CONTRACTORD.PAD MOUNTED TRANSFORMER FOUNDATION EXCAVATION SHALL BE BY SITE CONTRACTORE.AFTER PRIMARY CABLE INSTALLATION BY NATIONAL GRID , SITE CONTRACTOR SHALL BACKFILL ALLTRENCHINGF.BOLLARDS, AS REQUIRED BY NATIONAL GRID SHALL BE BY SITE CONTRACTORG.OIL CONTAINMENT PAD PER NATIONAL GRID SPECIFICATIONSH.EC SHALL FURNISH PRE-CAST CONCRETE TRANSFORMER PAD AND OIL CONTAINMENT CURBING FORINSTALLATION BY THE SITE CONTRACTOR. SEE DETAILS ON SHEET E-502.I.PAD MOUNT TRANSFORMER SWEEPS SHALL BE GALVANIZED RIGID STEEL OR SCHEDULE 40 - PVC, WITH THETRANSFORMER SWEEPS RISING TYPICALLY 1" ABOVE THE CONCRETE PAD.J.EC SHALL INSTALL BELL ENDS ON THE CONDUITS AND INSTALL CONDUIT PLUGS IN ALL UNUSED CONDUITSAND PULLING TAPE.(1) 1-1/2"C WITH 6#8AWG +#10G FOR AUXILIARY POWER WIRING TO GENERATOR SERVICES FOR BLOCK HEATER,BATTERY CHARGER AND MAINTENANCE OUTLET.(1) 1"C FOR CONTROL WIRING FROM GENERATOR TO TRANSFER SWITCH. FIGURE ON 8#14 AWG (DC SIGNALS) TOATS 4#14 AWG TO EPO (TOTAL 12#14 DC SIGNALS). CONFIRM WITH APPROVED SUBMITTAL.(1) 1"C FOR CONTROL WIRING TO REMOTE ANNUNCIATOR; FIGURE ON 2#10 AND BELDEN 9841 (DC SIGNAL);CONFIRM WITH APPROVED SUBMITTAL.EC TO PROVIDE (3) 20A/2P AND (1) 20A/1P CIRCUIT BREAKERS IN PANEL HP-1A:-2P, 20A BREAKER FOR BLOCK HEATER-2P, 20A BREAKER FOR COOLANT HEATER-2P, 20A BREAKER FOR BATTERY CHARGER-1P, 20A BREAKER FOR WEATHERPROOF GFCI RECEPTACLE-COORDINATE EXACT CIRCUIT BREAKER AND CIRCUIT REQUIREMENTS WITH APPROVED GENERATOR SHOP DRAWINGSEC SHALL PROVIDE AC WIRING TO CONNECT EQUIPMENT BY PV SQUARED SOLAR. SEE PV-E1.0 THRU PV-E2.1 FORADDITIONAL DETAILED INFORMATION.METER SOCKET WITH 1-1/2"C AND PULLSTRING FROM METER SECTION OF SWITCHBOARD. METER WIRING SHALLBE BY NATIONAL GRID.-FIELD COORDINATE EXACT LOCATION OF METER SOCKET ON BUILDING.ANTICIPATED FAULT CURRENT FROM UTILITY IS 55,600-AMPS AT TRANSFORMER OUTPUT TERMINALS, BELOW42,000-AMPS AT SWITCHBOARD, BELOW 42,000-AMPS AT MDP AND MDP-1, AND BELOW 22,000-AMPS AT DP-1, DP-2AND DP-3, USING COPPER CONDUCTOR MATERIALS.-ADVISE ENGINEER IF CONDUCTOR SIZES, MATERIAL, OR SERVICE EQUIPMENT LOCATIONS CHANGE FROM THATSHOWN ON SITE PLAN AS PART OF SHOP DRAWING PROCESS.-DO NOT PURCHASE/ORDER FINAL EQUIPMENT WITHOUT COORDINATING WITH ENGINEER AND NATIONAL GRIDPLANNER.SHEET KEYED NOTES654321740A/2P 40A/2P 40A/2P FUTURE EV CHARGING STATIONCTCABINETELECTRIC SERVICEMETERCONFIRM AVAILABLE FAULT CURRENTWITH NATIONAL GRID PLANNER ANDREPORT ANY DISCREPANCY TOENGINEER IN WRITING (TYP.)-HOT SEQUENCEPHASE 1: (2) RUNS OF 3"CBASIS OF PRICING:100-FEETSOLAR PVRAPIDSHUTDOWNDISCONNECT600A SERVICE RATED VISIBLE BREAK DISCONNECT FUSED AT 600A-FIELD COORDINATE EXACT SOLAR PV REQUIREMENTS WITH SOLAR PV PROVIDER-PROVIDE CONDUIT PATHWAY ONLY, PHASE 2 METER ANDDISCONNECT TO BE PROVIDED AS PART OF PHASE 2TO SOLAR PV ARRAYBY PV CONTRACTOR600A/3PCTCABINETBY THISCONTRACTBY PVCONTRACTORPHASE 2: (3) RUNS OF 3"CBASIS OF PRICING:100-FEET8FAULT CURRENT WRITTEN CONFIRMATION BYCONTRACTOR WITH UTILITYPOWER RISER WRITTEN APPROVAL BYCONTRACTOR WITH UTILITYREVISED (VE) POWER RISER WRITTEN APPROVALBY CONTRACTOR WITH UTILITYPOWER GEAR SUBMITTAL WRITTEN APPROVALBY CONTRACTOR WITH UTILITYDATE122A3CONTRACTOR/UTILITY COORDINATIONDESCRIPTIONMETERSOCKET889PP2-25APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P PP1-27APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-02APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-12APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-03APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-14APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-04APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-16APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-05APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-18APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-06APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-20APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-07APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-22APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-01APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-10APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-08APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-24APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 SPD1PP2-26APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P PP1-28APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P PP1-29APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P PP1-30APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P PP1-31APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P PP1-32APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3125A/2P PP1-26APT.PANEL120/208V,1Ø, 3W,125A MLO,18K AIC125A/2P PP1-12APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-06APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-14APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-07APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-16APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-08APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-18APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-27APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-20APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-28APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-22APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-29APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-10APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-05APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP1-24APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAIC125A/2P PP2-30APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1SPD1125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 125/3 SPD1PANEL DP-3, 120/208V, 3Ø, 4W, 400A MLO, 22 KAICPP2-31APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 125A/2P APT.PANEL120/208V,1Ø, 3W,125A MLO,18KAICSPD1125/3 PP2-32400A3P400/4 ELECTRIC SERVICEMETERFUTURE EV CHARGING STATION FUTURE EV CHARGING STATION EV CHARGING STATION99 99999NOTE:1.CIRCUIT BREAKERS 1200A AND ABOVE SHALL BE PROVIDEDWITH AN ARC ENERGY REDUCING MAINTENANCE SELECTORSWITCH WITH A LOCAL STATUS INDICATOR. THE CONTROLAND INDICATION OF THIS FUNCTION SHALL BE PROVIDED ONA BREAKER-BY-BREAKER INDIVIDUAL BASIS.PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-POWER RISERDIAGRAMN.T.S.E6.0 FIRE ALARM RISER DIAGRAMFACP100,000 CANDELA STROBESEXTERIOR OF BUILDINGKNOXBOXDIGITALCOMMUNICATIONSTSTNOTES:STSTFTAMPER BATTERYCABINETLOCATE WITHIN20-FEET OFFACPDEDICATED 20A,120V CIRCUITFIRE ALARMANNUNCIATORPANELTO ANALOGTELEPHONE LINEFAMMAMMAMMAMMEOLFSTSFSTSFFFSTF1.PROVIDE INITIATING DEVICE CIRCUITS AS REQUIRED TO CONNECT ALL DEVICES.2.PROVIDE NOTIFICATION APPLIANCE CIRCUIT POWER EXTENDER PANELS AS REQUIRED. LOCATE IN FIELD TO OPTIMIZE NAC WIRING.PROVIDE 120V, 20A DEDICATED BRANCH CIRCUIT FROM CLOSEST POWER PANEL FOR EACH NAC PANEL.3.SMOKE ALARMS IN EACH APARTMENT SHALL BE INTERCONNECTED SUCH THAT ACTIVATION OF ONE ALARM WILL ACTIVATE ALL OF THEALARMS IN EACH INDIVIDUAL APARTMENT.4.RISER IS DIAGRAMMATIC ONLY AND NOT INTENDED TO INDICATE ROUTING OF WIRING OR QUANTITIES OF DEVICES. PROVIDE WIRING FOR ACOMPLETE AND FUNCTIONAL SYSTEM AS REQUIRED BY SYSTEM MANUFACTURER.FHCMCMCMEOLTYPICAL CONTROL MODULEELEVATOR RECALLAPARTMENT DEVICES(NOTIFICATION)FWET SPRINKLER TAMPER/FLOW SWITCHES- CONFIRM EXACT QUANTITY W/ APPROVED FP. SHOP DRAWINGSFAANAAMSBHWIRING LEGEND (THIS SHEET):1 PAIR #16 AWG FIRE WIRE, NON-SHIELDED, TYPE FPL24-VOLT, #14/4 FIRE WIRE TYPE FPLPAPARTMENT DEVICES(INITIATION)FIREDPT.POLICEDPT.BDA-FDBDA-PDSPLITTER/COMBINER(TYP.)COAXIAL CABLE TO OUTSIDEANTENNAELECTRICALROOMBDASIGNAGEBI DIRECTION AMPLIFIER-PROVIDE BATTERYBACK-UP FORTWENTY-FOUR (24)HOURS (TYP.)FIRE ALARM PANEL INPUTS:1. SIGNAL BOOSTER TROUBLE2. NORMAL AC POWER3. FAILURE OF BATTERY CHARGER4. LOW BATTERY CAPACITY5. ANTENNA MALFUNCTIONNOTES:1.CABLES MUST BE SUPPORTED AT LEAST EVERY 4-FEET WITH APPROVED MOUNTING HARDWARE.2.RISER DIAGRAMS ARE FOR REFERENCE ONLY. EC SHALL USE THE RISER DIAGRAM AND CABLING SCHEME PROVIDED BY THE MANUFACTURER ORMANUFACTURER'S REPRESENTATIVE FOR BIDDING AND INSTALLATION PURPOSES. RISER DIAGRAM IS NOT INTENDED TO DEPICT ALL REQUIRED DEVICES ANDCABLING.3.IF LENGTH OF THE RUN REQUIRES IT, REPLACE COAXIAL CABLES WITH FIBER OPTIC CABLES.4.FURNISH AND INSTALL 1P, 20A CIRCUIT BREAKER IN NEW PANELBOARD AND PROVIDE CIRCUIT HOMERUN.5.DAS VENDOR/MANUFACTURER'S REP. SHALL SURVEY BUILDING PRIOR TO THE SUBMITTAL PHASE AND PROVIDE ALL REQUIRED DEVICES FOR FULLCOVERAGE/COMMUNICATION CAPACITIES THROUGHOUT THE BUILDING.a.) EC & DAS VENDOR/MANUFACTURER'S REP. SHALL ARRANGE A MEETING WITH THE LEE POLICE AND FIRE DEPARTMENTS TO REVIEW AND COORDINATELOCAL REQUIREMENTS FOR DAS SYSTEM AND INCLUDE MINUTES FROM THIS MEETING IN THE DAS SUBMITTAL.b.)SURVEY FOR BUILDING DAS REQUIREMENTS SHALL BE PERFORMED PRIOR TO COMPLETION OF ABATEMENT WORK.EXTERIOR OMNI COVERAGE ANTENNA (TYP.)-FIELD COORDINATE EXACT LOCATION WITH DASSYSTEM MANUFACTURER-EC SHALL FURNISH AND INSTALL ALL REQUIREDSUPPORTS AND FASTENING SYSTEMS-GC SHALL PROVIDE ALL ASSOCIATED ROOFINGWORK (FLASHING, BOOTS FOR CONDUIT, ETC.)SYSTEM B:POLICE DEPARTMENTSYSTEM A:FIRE DEPARTMENTLOCATE LIGHTNING PROTECTIONUNIT AS CLOSE TO CABLE ROOFENTRY AS POSSIBLE, BOUND TOBUILDING GROUND (TYP.)DIRECTIONAL INTERIORANTENNA (DAS) (TYP.)PLENUM RATED1/2" COAXIAL CABLEPLENUM RATED1/2" COAXIAL CABLEPLENUM RATED1/2" COAXIAL CABLEPLENUM RATED1/2" COAXIAL CABLESECOND FLOORFIRST FLOORPROVIDE DEDICATED20A, 120V POWER-NOTE 4COORDINATE EXACT SIGNAGEREQUIREMENTS WITH THE FIREDEPARTMENTPROVIDE DEDICATED20A, 120V POWER-NOTE 4ROOFDAS SYSTEM RISER DIAGRAMSBE6.1DAS SYSTEM IS SHOWN SCHEMATICALLY. EC SHALL MEET WITH FIRE DEPARTMENT AND POLICE DEPARTMENT ONSITE ONCE BUILDING HAS BEEN FRAMED TO DETERMINE IF DAS SYSTEM IS REQUIRED.BASE BID:EC SHALL COORDINATE WITH POLICE/FIRE DEPARTMENT AND PERFORM ALL TESTING REQUIRED TO DETERMINE IFDAS SYSTEM IS REQUIRED.ADD ALTERNATE:EC SHALL FURNISH AND INSTALL ALL DEVICES, RACEWAY, CABLING, ETC. TO PROVIDE FULLY FUNCTIONAL DASSYSTEM.SSSSSSSSSPROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-DAS SYSTEM & FIREALARM RISERDIAGRAMSN.T.S.E6.1 HEAT PUMPS IN THE FOLLOWING UNITSSHALL BE 2P/20A: 2-22, 2-24HEAT PUMPS IN THE FOLLOWING UNITSSHALL BE 2P/20A: 1-32, 2-32NOTES:1.IN ACCORDANCE WITH C405.13.1, PROVIDE AUTOMATIC LOAD MANAGEMENT SYSTEM (ALMS) TO CONTROL EV LOADS SHARING ASINGLE BRANCH CIRCUIT.NOTES:1.IN ACCORDANCE WITH C405.13.1, PROVIDE AUTOMATIC LOAD MANAGEMENT SYSTEM (ALMS) TO CONTROL EV LOADS SHARING ASINGLE BRANCH CIRCUIT.PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-ELECTRICALSCHEDULESN.T.S.E7.0 MOTOR AND EQUIPMENT SCHEDULEUNITLOAD REQUIREMENTS / SERVICESCONTROLLER/DISCONNECTING MEANSTAGDESCRIPTIONLOCATIONHP/kWMCAVOLTSPHASECIRCUITBREAKERPOWER SOURCECIRCUIT FROM POWER SOURCETO LOADDISCONNECTFURNISHED BY DIV. 23AND WIRED BY DIV. 26LOCAL DISCONNECTBY DIV 26NOTESCONTROLLERFURNISHED BY DIV. 23AND WIRED BY DIV. 26HP-1HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES5.220812P/15AABBREVIATIONS:1. PACKAGED CONTROL UNIT; PROVIDE SINGLE POINT CONNECTION. SUPPLIED WITH INTEGRAL MOTOR CONTROLLERS AND DISCONNECT, EXCEPT AS INDICATED OTHERWISE.COORDINATE ELECTRICAL EQUIPMENT SHIPPED LOOSE TO BE WIRED AND INSTALLED BY EC. EC SHALL ASSUME LOCAL DISCONNECT IS REQUIRED FURNISHED BY MC AND WIRED BY EC.COMB -COMBINATION MAGNETIC STARTERREVIEW APPROVED SHOP DRAWINGS AND DO NOT PROVIDE DUPLICATE DISCONNECTS IF ALREADY FURNISHED BY VENDOR.MSS -MOTOR STARTER SWITCH2. EC TO PROVIDE RECEPTACLE AS INDICATED LOCAL TO UNIT AND IN COMPLIANCE WITH NEC. WHERE FURNISHED WITH MECHANICAL UNITS, EC SHALL ASSUME REQUIREMENT TO INSTALL AND WIRE IF SHIPPED LOOSE.PTSPROGRAMMABLE TIMER SWITCH3. IF EC ELECTS TO USE MC CABLE, EC SHALL BE RESPONSIBLE TO DESIGN WIRE MESH CABLE TRAYS SYSTEMS INCLUDING SIZING AND ROUTING TO SUPPORT MC CABLE IN A NEAT AND WORKMANLIKE MANNER.PCU -PACKAGED CONTROL UNITVFD -VARIABLE FREQUENCY DRIVESS -NON FUSED SAFETY SWITCH4. ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE TO COORDINATE WITH GENERAL CONTRACTOR (GC) MECHANICAL CONTRACTOR (MC), PLUMBING CONTRACTOR (PC), ANDFSS -FUSED SAFETY SWITCHTEMPERATURE CONTROLS CONTRACTOR (TC) FOR APPROVED EQUIPMENT SUBMITTAL ELECTRICAL DATA. ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE TO PROVIDEIDS -INTEGRAL DISCONNECT SWITCHADJUSTMENTS TO SIZES OF ELECTRICAL EQUIPMENT INCLUDING BREAKERS IN EC SCOPE IN ACCORDANCE WITH NEC ARTICLE 240/430, AS APPLICABLE. ELECTRICAL CONTRACTOR SHALL ALSOHTR-ELECTRIC HEATER ACCESSORYCHECK ALL ELECTRICAL EQUIPMENT NAMEPLATES IN FIELD AND ADVISE ENGINEER/ARCHITECT IF DIFFERENT FROM VALUES FOUND IN SCHEDULES ON CONTRACT DOCUMENTS.LVT-LINE VOLTAGE THERMOSTATEPO-EMERGENCY POWER OFFMTS-MOTOR RATED TOGGLE SWITCH5. INTEGRAL DISCONNECT/CONTROLS, SEE MECHANICAL/PLUMBING SCHEDULE, COORDINATE WITH RELATED TRADES.6.DUCT SMOKE DETECTORS ARE FURNISHED BY THE ELECTRICAL CONTRACTOR, INSTALLED IN THE DUCT WORK BY THE MECHANICAL CONTRACTOR AND WIRED BY THEELECTRICAL CONTRACTOR. PROVIDE SUPERVISED RELAY AND WIRING TO MOTOR CONTROL CIRCUIT TO INITIATE FAN SHUTDOWN.7. DUCT SMOKE DETECTORS SHALL BE PROVIDED WITH REMOTE TEST SWITCH IN A LOCATION ACCESSIBLE AND ACCEPTABLE TO THE LOCAL FIRE DEPARTMENT. PROVIDE DUCT SMOKE ALARMINDICATOR IN THE CEILING OR WALL BELOW THE DETECTOR.HP-2HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES8.520812P/15AHP-3HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES10.520812P/15AHP-4HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES12.620812P/20AHP-5HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES7.720812P/15AHP-6HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES8.820812P/15AHP-7HEAT PUMPSEE PLANS-NOTES 3, 4 & 6--2#12, (1)#12G, 3/4"C-YESVARIES1020812P/15AHP-8HEAT PUMPSEE PLANS-NOTES 3, 4 & 6---YESVARIES2620812P/40A2#8, (1)#10G, 1"CDOA-1DEDICATED OUTDOOR AIR UNITROOF-NOTES 1, 3, 4, 6, & 7--18720833P/200AMDP-2DOA-2DEDICATED OUTDOOR AIR UNITROOF-NOTES 1, 3, 4, 6, & 7-3#3/0, (1)#6G, 2-1/2"C-18720833P/200AMDP-2HPWH-1HEAT PUMP WATER HEATERMECH ROOM-NOTES 3, 4 & 6--SS--9720833P/100AMDP-13#1, (1)#8G, 1-1/2"CHPWH-2HEAT PUMP WATER HEATERMECH ROOM-NOTES 3, 4 & 6--SS--9720833P/100AMDP-13#1, (1)#8G, 1-1/2"C3#3/0, (1)#6G, 2-1/2"CSP-1SUMP PUMP1/2 HP-12011P/20AELEVATOR2#12, (1)#12G, 3/4"CGFCI OUTLETNOTES 1, 2, 3 & 4VARIES--TMV-1THERMOSTATIC MIXING VALVE--12011P/20AMECH ROOM2#12, (1)#12G, 3/4"CGFCI OUTLETNOTES 1, 2, 3 & 4MDP-2--RCP-1RECIRCULATION PUMP45W-12011P/20A2#12, (1)#12G, 3/4"CMSSNOTES 1, 3 & 4MECH RMMDP-2--ERV-1ENERGY RECOVERY VENTILATORSEE PLANS-NOTES 3, 4 & 6--MSS2#12, (1)#12G, 3/4"C--1812011P/20AVARIESEDH-1ELECTRIC DUCT HEATERSEE PLANS-NOTES 3, 4 & 6--73.920833P/100AHP-1A3#1, (1)#8G, 1-1/2"CEDH-2ELECTRIC DUCT HEATERSEE PLANS-NOTES 3, 4 & 6--73.920833P/100AHP-2A3#1, (1)#8G, 1-1/2"CEDH-3ELECTRIC DUCT HEATERSEE PLANS-NOTES 3, 4 & 6--73.920833P/100AHP-1B3#1, (1)#8G, 1-1/2"CEDH-4ELECTRIC DUCT HEATERSEE PLANS-NOTES 3, 4 & 6--73.920833P/100AHP-2B3#1, (1)#8G, 1-1/2"CMAU-1MAKE-UP AIR UNITSEE PLANS-NOTES 3, 4 & 6-2#12, (1)#12G, 3/4"C-YES720812P/15AVARIES-MAU-2MAKE-UP AIR UNITSEE PLANS-NOTES 3, 4 & 6-2#12, (1)#12G, 3/4"C-YES720812P/15AVARIES-MAU-3MAKE-UP AIR UNITSEE PLANS-NOTES 3, 4 & 6-2#12, (1)#12G, 3/4"C-YES720812P/15AVARIES-MAU-4MAKE-UP AIR UNITSEE PLANS-NOTES 3, 4 & 6-2#12, (1)#12G, 3/4"C-YES720812P/15AVARIES-GP-1GEOTHERMAL PUMP (QTY 4)2.1 HP7.1423012P/15A2#12, (1)#12G, 3/4"CSSNOTES 1, 3, 4 & 8MECH RMMDP-2--ST-1SWING TANK12kW-24012P/60AMSSNOTES 1, 3 & 4MECH RMMDP-2--2#4, (1)#10G, 1-1/2"CEDH-5ELECTRIC DUCT HEATERSEE PLANS-NOTES 3, 4 & 6--14.520833P/15AHP-1B8. GEOTHERMAL PUMP STATION INCLUDES FOUR (4) PUMPS CONNECTED TO A SINGLE CONTROL PANEL. EC SHALL PROVIDE DISCONNECT FOR EACH PUMP. ALL FOUR (4) PUMPS SHALL BECONNECTED TO A SINGLE 2P/15A CIRCUIT BREAKER.ECH-1ECH-2ECR-1EUH-1ELECTRIC CABINET HEATERELECTRIC CABINET HEATERELECTRIC HEATERELECTRIC UNIT HEATERSEE PLANSSEE PLANSSEE PLANSSEE PLANS3kW6kW3kW2082082081112P/20A2P/40A2P/20A11.1-11.1VARIESVARIESVARIES2#12, (1)#12G, 3/4"C2#12, (1)#12G, 3/4"CYESINTEGRAL THERMOSTAT----YESECR-2ELECTRIC HEATERSEE PLANS2kW5kW20812P/15A-20812P/30A19.4VARIESVARIES2#12, (1)#12G, 3/4"C2#8, (1)#10G, 1"C2#10, (1)#10G, 3/4"C-YESYESYESINTEGRAL THERMOSTATINTEGRAL THERMOSTATINTEGRAL THERMOSTATINTEGRAL THERMOSTATNOTES 3, 4 & 6NOTES 3, 4 & 6NOTES 3, 4 & 6NOTES 3, 4 & 6NOTES 3, 4 & 63#12, (1)#12G, 3/4"C-YES-YESYES-YES-YES-YES-YES-GP-2GEOTHERMAL PUMP (QTY 4)2.1 HP7.1423012P/15A2#12, (1)#12G, 3/4"CSSNOTES 1, 3, 4 & 8MECH RMMDP-2--PROSPECT PLACE737 BRIDGE ROADPARCEL 18C-048-001737 BRIDGE ROADJANUARY 9, 2023M-SCI02LBMTSCALE:REVISIONS:No.DATESEAL:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:DATE:DRAWN BY:CHECKED BY:PROJECT No:FILE:SCALE:REVISIONS:No.DATEDESCRIPTIONSEAL:2A RIVER STREETADAMS, MA 01220P: (413) 743.9500F: (413) 743.3313www.HESNOR.comTHESE DRAWINGS (INSTRUMENTS OF SERVICE) WERE PREPARED IN A DESIGN-BUILD FASHION WITH A COLLABORATION BETWEEN HESNOR ENGINEERING ASSOCIATES, PLLC AND SALOOMEY CONSTRUCTION. THESE INSTRUMENTS OF SERVICE ARE FOR USE SOLELY BY SALOOMEY CONSTRUCTION. ANY UNAUTHORIZED USE OF THE INSTRUMENTS OF SERVICE SHALL BE AT THE OWNER'S SOLE RISK AND WITHOUT LIABILITY TO HESNOR ENGINEERING ASSOCIATES, PLLC OR SALOOMEY CONSTRUCTION.CITY OF NORTHAMPTONHAMPSHIRE COUNTYMASSACHUSETTSM-SCI02.A02/14/24PRIOR REVISIONSB02/14/24CONFORMED SETREVISIONS02/24/24PERMIT SET-ELECTRICALSCHEDULESN.T.S.E7.1