Loading...
32A-072-002 BP-2024-0625 19 UNION ST COMMONWEALTH OF MASSACHUSETTS Map:Block:Lot: 32A-072-002 CITY OF NORTHAMPTON. Permit: Alts Renovations Repair PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) BUILDING PERMIT Permit# BP-2024-0625 PERMISSION IS HEREBY GRANTED TO: Project# ROOF 2024 Contractor: License: PEAK PERFORMANCE ROOFING Est.Cost: 24900 LLC CS-103061 Const.Class: Exp.Date: 09/21/2024 Use Group: Owner: GUZMAN DILLON BRIAN W&JORGE A Lot Size(sq.ft.) Zoning: URC Applicant:pplicant: PEAK PERFORMANCE ROOFING LLC Applicant Address Phone:, Insurance: 1 LOVEFIELD ST 413-203-5888 R2WC493286 EASTHAMPTON, MA 01027 ISSUED ON: 05/17/2024 TO PERFORM THE FOLLOWING WORK: STRIP AND REROOF, REPLACE 3 SKYLIGHTS POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Final: Final: Final: Rough Frame: Gas: Fire Department I)ri%erwa)• Final: Fireplace/Chimney: Rough: Oil: Insulation: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fees Paid: $80.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Office of the Building Commissioner DocuSign Envelope ID:FFDB2CA3-43D9-434F-92D8-F66F62335705 _ 1- fit. r- - 7 MAY 1 6 2024 1 �, The Commonwealth of Massachusetts Board of Building Regulations and Standards --MU�aQPR��� ALITY tfr Massachusetts State Building Code,780 gmit T OP EiuiLnus insa�criq B i ORTHA'R1�'f ON.MA 01000 Building Permit Application To Construct,Repair.Renovate Or Demolish a sedrMar 2(111 One-or Two-Fainliv Dwelling This Section For Official Use Only Building omit Number. 60—.1.44 (/LS Date Applied: h..› 47, ///,jG 5- 17- 20+`1 Building Official(Print Name) Signature Date i SECTION 1: SITE INFORMATION i E 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 19 Union St. , 1.1 a Is this an accepted street?yes no Map Number Parcel Number 11.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Usc Lot Area(sq ft) Frontage(ft) • 1.5 Building Setbacks(ft) Front Yard Side Yards I Rear Yard j Required Provided Required Provided Required Provided 1 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public 0 Private 0 Zone.: _ Outside Flood"Lone? Municipal 0 On site disposal system 0 Check ifyesD SECTION 2: PROPERTY ONVNERSHIP1 2.1 Owner'of Record: Jorge Guzman Northampton Name(Print) city,State.ZIP 19 Union St. 202-595-4399 jaguzman@umass.edu No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK2(check all that apply) New Construction 0 Existing Building 0 Owner-Occupied 0 Repairs(s) 0 Alteration(s) 0 Addition 0 Demolition 0 Accessory Bldg.0 Number of Units Other 0 Specify: Brief Description of Proposed Work2: Strip and replace asphalt roof. Ref ace 3 skylights. Remove 3 chimneys down to roof line. 1 SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs. Official Use Only (Labor and Materials) I.Building s 24900 1. Building Permit Fee: $ Indicate how fee is determined: 2.Electrical S 0 Standard City/Town Application Fee ❑Tonal Project Cost'(item 6)x multiplier x 3.Plumbing S 12. Other Fees: S 4.Mechanical (11VAC) I S List: 5.Mechanical (Fire $ Suppression) Total All Fee *S Check No.& 4V Check Amount: ' Cash Amount: 6. Total Project Cost: S 24900 ❑Paid in Full 0 Outstanding Balance Due: DocuSign Envelope ID:FFDB2CA3-43D9-434F-92D8-F66F62335705 SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-103061 09/21/2024 James Flannery License Number Expiration Date Name of CSL Holder Ll 1 Lovefield St. ; List CSL Type(see below) No.and StreetType Description U Unrestricted(Buildings up to 35,000 cu.IL) Easthampton. MA 01027 R Restricted 1&.2 Family Dwelling City/Town.State,ZIP M` Masonry RC Roofing Covering DVS Window and Siding SF Solid Fuel Burning Appliances 413-203-5888 peakperformanceroofingllc@gmail.com I I Insulation Telephone Email address I D Demolition 5.2 Registered Home Improvement Contractor(HIC) 183698 11/03/2025 James Flannery/ Peak Performance Roofing LLC MC Registration Number Expiration Date HIC Company Nang or HIC Registrant Name 1 Lovefield St. peakperformanceroofingllc@gmail.com No.and Street Email address Easthampton, MA 01027 413-203-5888 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Siened Affidavit Attached? Yes No 0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR WELDING PERMIT I,as Owner of the subject property,hereby authorizeJames Flannery/Peak Performance Roofing LLC to act on my behalf,in all matters relative to work authorized by this building permit application. .- '�. 5/13/2024 r n vmer°'s Name(Electronic Signature) Date SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. James Flannery ,amec Rar.tleot 5/8/2024 } Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oca Information on the Construction Supervisor License can be found at www.mass.eov.'dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system ' Number of decks/porches Type of cooling system • Enclosed Open 3. ''Total Project Square Footage"may be substituted for"Total Project Cost" _- The Commonwealth of Massachusetts Department of Industrial Accidents _;?1111= 1 Congress Street, Suite 100 7111110 t�=_ Boston, MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WiTH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name (Business/Organization/Individual): PEAK PERFORMANCE ROOFING, LLC Address: 1 LOVEFIELD STREET City/State/Zip: EASTHAMPTON, MA 01027 Phone#:413-203-5888 Are you an employer?Check the appropriate box: Type of project(required): LEI I am a employer with 4 employees(full and/or part-time).* 7. ❑ New construction 2.0 I am a sole proprietor or partnership and have no employees working for me in 8. ❑ Remodeling any capacity.[No workers'comp.insurance required.] 9. ❑Demolition 3.12 1 am a homeowner doing all work myself.[No workers'comp.insurance required.]i 4.0 i am a homeowner and will be hiring contractors to conduct all work on my property. I will 10 El Building addition ensure that all contractors either have workers'compensation insurance or arc sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.0 i am a general contractor and i have hired the sub-contractors listed on the attached sheet. 13. Roof repairs These sub-contractors have employees and have workers'comp.insurance.' 6.❑We arc a corporation and its officers have exercised their right of exemption per MGL c. 14.El Other 152,*1(4),and we have no employees.[No workers'comp.insurance required.] *Any applicant that checks box I I must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. :Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. 1 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:BERKSHIRE HATHAWAY GUARD Policy#or Self-ins. Lic. #: R2WC493286 Expiration Date:04/27/2025 Job Site Address: 19 UNION ST. City/State/Zip: NORTHAMPTON, MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152, §25A is a criminal violation punishable by a fine up to S1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Signature: James J Flannery Date:5/14/2024 Phone#:413-203-5888 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111 , S 150A. Address of the work: 19 UNION ST. The debris will be transported by: Aaron's 24/7 Towing and Roll-On The debris will be received by: Valley Recycling Building permit number: Name of Permit Applicant Peak Performance Roofing LLC/James Flannery 5/14/2024 James Flannery Fiarneri. Date Signature of Permit Applicant DocuSign Envelope ID:FFDB2CA3-43D9-434F-92D8-F66F62335705 Peak Performance Roofing LLC 1 Lovefield St. P E K Easthampton, MA 01027 413-203-5888 PERFOR CE peakperformanceroofingllc@gmail.com ROOFING MA HIC#183698 MA CSL#103061 Contract ADDRESS CONTRACT# 11255 Jorge Guzman DATE 05/08/2024 19 Union St Northampton 202-595-4399 jaguzman@umass.edu JOB LOCATION 19 Union St,Northampton DESCRIPTION - See#3 for important details. - SKYLIGHT REPLACEMENT (3) Peak Performance Roofing will provide the labor and materials to perform the following: 1. Remove existing materials from the roof area. 2. Inspect sheathing for compromised areas; replace as needed. (If new plywood is necessary: +$60/sheet*** or$6/foot) 3. Remove three chimneys down to the roof line and ply over. 4. Install ice/water shield(6 feet on eaves, 3 feet in valleys/around penetrations). 5. Apply synthetic underlayment to remaining roof areas. 6. Install 8" aluminum drip edge to all eaves and rakes. 7. Install architectural shingles by CertainTeed: Landmark PRO Shingles COLOR: TBD 8. Install Shingle Vent II Ridge Vent on suitable peaks. 9. Complete all necessary flashings, including LIFETIME pipe boots, chimney base, and the larger Skylight Unit that won't be replaced. * 10. SKYLIGHT REPLACEMENT: (3) 19"x 36" DocuSign Envelope ID: FFDB2CA3-43D9-434F-92D8-F66F62335705 DESCRIPTION Remove all debris from premises, and throughout the job, continue cleanup and keep the premises undamaged. WE ARE NOT RESPONSIBLE FOR DEBRIS THAT MAY FALL INTO ATTIC/INTERIOR. Please use reasonable caution during the installation process: do not walk or drive under active work or on areas of potential roofing debris. Installations are weather permitting; inclement weather will cause scheduling delays. Peak Performance Roofing LLC will obtain the building permit. Warranty confirmation shall be provided upon final payment. Installation and manufacturer warranties are not in effect until Paid In Full. Includes CertainTeed Lifetime Limited Warranty(Transferable)with 10 year SureStart period. https://www.certainteed.com/resources/Asphalt_Warranty_CTR3 782_1912_E.pdf Total: $24,900 A one-third deposit of$8,300 will secure contract,permitting, material order, and priority scheduling. The balance shall be due upon completion,within 10 days of invoice. Accounts outstanding over 30 days subject to 2% finance charge monthly. DISCLAIMERS 1) *SKYLIGHTS Peak Performance Roofing LLC highly recommends replacing the old, existing skylights during the installation of the new roof. Reasons for this have been discussed with the customer. Peak Performance Roofing LLC is NOT RESPONSIBLE for any leaks,damage, or other issues that may occur due to the old skylights not being replaced. 2) LEAKING CHIMNEY Peak Performance Roofing LLC takes measures to prevent water penetration at the chimney-roof connection by installing high-quality flashing. However, leaks that stem from the chimney structure itself, particularly in adverse weather conditions like diagonal,wind-driven rain are not covered under our 5- YEAR labor warranty. Homeowners are encouraged to arrange for ongoing chimney care and repair with a certified mason. 2) PROJECT MAP IT Upon signing, you consent to have your project included on our public work map after completion. This project entry will only be used to aid future customers in their decision-making process. Only non- sensitive,public information will be shown. Please inform us if you would like to opt out. Thank you for choosing Peak Performance Roofing! TOTAL $24,900.00 DocuSigned by: jorl, 5/13/2024 Accepted By -89698ADaaECCa8E Accepted Date DocuSign Envelope ID:FFDB2CA3-43D9-434F-92D8-F66F62335705 The Roofing Process : What to Expect When will my roof be scheduled? Once the contract, deposit, and building permit are all in place, we can proceed with installing your roof. Roofing is hazardous and the safety of our crew is a priority. We must work around the weather forecast; here in New England, this means we can't plan our schedule very far in advance, and can't promise specific installation dates. Long stretches of inclement weather will cause delays. We appreciate your flexibility and patience in our dealings with Mother Nature! Your project manager will contact you a few days before they wish to proceed. Our crews are hardworking and efficient; most residential installations take only 1-2 days to install. Do I need to do anything to prepare? As noted on your contract, we are not responsible for dirt/debris that may fall into the attic. Depending on the condition of the plywood, you may see little to no debris, or it could be more substantial. If you store items in the attic, we recommend covering with plastic sheeting. Do I need to notify my neighbors? If your home is extremely close to other homes or driveways, there's a possibility we may need to be on their property temporarily to lay protection or collect debris. In this case, yes, please notify your neighbors. Otherwise, it is a courtesy. Your neighbors will likely appreciate notification of the noise/traffic. Materials and Dumpster Delivery: The materials and dumpster may arrive the day before the scheduled installation (especially if your installation is taking place on a weekend). Depending on your home's layout and driveway(s), we may need vehicles moved at this point. Parking: On the day of the installation, we ask that you move ALL vehicles out of ALL driveways, and away from the house, to avoid any damage, and for our access. How early will you start? Our crews will begin as early as 7.30am. They will work a long day, often until dark if necessary. We aim to have the installation completed in as few days as possible to minimize disruption to you and your neighbors. Do I need to be home? It's up to you. Some customers like to keep an eye on what's going on. Others would rather not be home because of the noise. Be aware that roofing is loud (banging, nail guns, etc) so you may need to make arrangements for residents, tenants or pets. Please do not plan on outdoor activities while we are working, for safety's sake. Please keep pets inside, or on a leash away from the roofing activities. DocuSign Envelope ID: FFDB2CA3-43D9-434F-92D8-F66F62335705 What if I have an urgent question? If you have an urgent issue outside of regular office hours, call or text your project manager directly on his cell. Unforeseen Issues: Once we remove the existing roofing, we can inspect the underlying sheathing. Your contract states we will replace a small amount of plywood at no additional cost if needed. If more serious issues are found, the project manager will contact you to explain. There may need to be an upcharge on the final bill, consistent with the per sheet or square foot amount quoted in your estimate. Cleanup: No way around it, roofing is messy work. Rest assured that when the job is done, we will pickup all debris and do magnetic sweeps. Since we may work until dark, the main crew may need to leave before cleaning up, or if the job ends midday, they may leave to start another job. Another staff person will come later or the next day for more cleaning. There are materials left over. Did I get charged for those? Your job is priced according to the measurements. We always bring extra material for the jobsite, just to be safe. You were not charged for those and we will be collecting them. One of our staff will pick up the extra material after the installation crew is gone, usually within 1-2 days. When will the dumpster be removed? The dumpster is usually removed the next business day after the main crew has finished. Weekends or holidays may delay pickup. The dumpster company should check for any debris after removal, but please do a visual check before walking or driving over the area where the dumpster was located. If you see any debris there, please let us know. The job is done but I have concerns, what should I do? Please be aware that even after the main installation crew has left, that doesn't mean our job is done. The project manager will be coming by as soon as possible to do a final inspection, and a staff person will come by to do a final sweep, and pickup leftover items. Depending on our schedule, all of the final touchups, cleaning & pickups are usually completed in about 1-3 days after main installation is complete. If you have any other questions, please let us know. Thank you for choosing Peak Performance Roofing! We will do our very best to make this major home improvement a smooth experience for you! —Docu39nen by /(' 5/13/2024 ' —48,A.CV4ECC4CE.. PE K 1 Lovefield St., Easthampton MA 01027 P E R F O R CE 413-203-5888 M-F 9am-4pm ROOFING peakperformanceroofinglIc@gmail.com