525 Park Hill 2020-01-14UP
DN
1'-3 1/2"5'-1"10 5/8"10 5/8"5'-1"1'-5 1/4"1'-2"3'-5"3'-9 1/4"Entry
101
Living Room
102
Dining Room
103
Kitchen
104
Bath
105 Family Room
106
Room
107
Garage
110
3'-1 1/4"Remove and replace
existing window
Remove and replace
existing window
Demo existing wood and
aluminium siding and trim
Demo existing wood
and aluminum siding
and trim
Repaint door and
jamb (exterior)
Demo and rework
existing handrail and
guard
Remove and replace
existing windows
Remove and replace
existing windows
Existing door switchesStep
Step
Existing condenser unitsModify existing trim
Rework existing
ceiling trim
Repaint DR, LR, Kitch & Hall
walls, ceiling and trim
Remove existing storm
door and replace
Remove plaster round at
center of starburst. Replace
with flat trim (Hardie or PVC)
to match rear entry starburst
Investigate and make
existing outlet safe
Update existing
outlets as required
(Allowance / ea.)4'-5 3/4"7'-4 1/4"2'-6"11'-9 1/2"26'-1 1/2"2'-6"6'-8 1/4"2'-6"6'-3 1/2"
15'-5 3/4"1'-2"3'-5"3'-9 1/4"8'-4 1/4"7'-5 1/8"8'-0"10'-2 3/4"
7'-3 1/8"7'-4 7/8"
23'-11"
24'-10 3/4"8'-4 1/4"10'-0 3/8"22'-10"9'-5 1/2"34'-5 3/4"Replace bottom stair
tread as req'd
Closet
Closet
All existing recessed
fixtures to have trim
and lamps replaced
(approx 28)
LED 2700K
dimmable
Upgrade dimmers
NO WORK NO WORK
NO WORK
Existing fan
to remain
DN3'-5 1/4"1'-9"8 1/2"2'-11"8 1/2"1'-9"3'-5 1/4"14'-8 1/4"4'-0 7/8"6'-11 5/8"4'-1 3/8"5"15'-11 1/2"1'-2 1/2"6'-1 3/8"8 3/4"
15'-1 1/2"
Exercise Room
205
Bath
202
Master Bedroom
206
24'-0 1/8"12'-9"5"4'-0"5"5'-4"2'-4 3/4"11'-2"7'-8 3/4"8'-2 1/2"6'-7 1/2"5'-6 1/4"11 3/4"7'-2 5/8"5'-6 3/8"3'-3 1/4"
4'-5"
Demo
knee wall
section
Demo windows Demo doors
Demo wall
1'-11 1/4"3'-8 3/4"Demo
bypass door
and replace
Demo door jamb
Existing door
previously
removed4'-2"4'-2"Demo all wall,
ceiling and floor
finishes 4'-9 1/2"Demo door
Demo wall
and doors
Demo wall
finishes only
Demo closet
Crawlspace
Crawlspace
Crawlspace
10'-5 3/4"2'-5 1/2"2'-10 1/4"
16'-7 1/2"
20'-4 1/2"
No work
Existing roofing
to remain
Existing roofing
to remain
Office
204
Hall
201
Guest Bedroom
203
7'-7 5/8"7'-8 3/4"25'-3 3/4"Demo
walls and
finishes
Salvage faucetInvestigate hot air
baseboard (return?)
and remove if
possible
Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
1/14/2020 3:08:53 PM1/4" = 1'-0"
Existing Plans
A.1
2020-01-14
Permit Set
19-045 (DES)
Geoff &
Linda Post
525 Park Hill Road
Florence MA
Description Date
Permit Set 01-14-20
Walkthrough Set 12-17-19
1/4" = 1'-0"1 Existing 1st Floor
1/4" = 1'-0"2 Existing 2nd Floor
Demo
existing
Hardie
siding
Demo aluminum trim
Demo existing
aluminum siding,
trim, and wood
siding below
(assumed)
Demo
windows
Demo existing
wood and trim
siding
Demo roof trim
Demo
windows
Demo existing
wood siding
and trim
Demo existing
wood siding
and trim
Existing roofing to remain
Existing
roofing to
remain
Existing
roofing to
remain
Existing Hardie
siding to remain
8'-0"8'-4 1/4"20'-11 3/8"5'-3 5/8"
26'-3"
Demo existing
wood and trim
siding
Existing roofing to remain
Existing Hardie
siding to remain
Existing Hardie
siding to remain
Demo existing
wood and trim
siding
Existing
roofing to
remain
Demo existing
asphalt shingles
Existing roofing to remain
Demo
windows
Demo
windows Demo
window
Repair existing jamb
Demo existing wood
and trim siding
Repaint
door
15'-5 3/4"25'-0 1/4"
Existing roofing to remain
Demo existing wood
and trim siding
Demo existing wood
and trim siding
Demo
windows
Existing
roofing to
remain
8'-5"8'-0"
Remove plaster
"Buddha belly"
Paint existing door
Replace existing wood trim
Replace existing
wood trim
Replace existing wood trim
Demo and replace asphalt
shingles to match existing
Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
1/14/2020 3:08:55 PM1/4" = 1'-0"
Existing
Elevations
A.2
2020-01-14
Permit Set
19-045 (DES)
Geoff &
Linda Post
525 Park Hill Road
Florence MA
Description Date
Permit Set 01-14-20
Walkthrough Set 12-17-19
1/4" = 1'-0"1 Existing South Elevation
1/4" = 1'-0"2 Existing West Elevation
1/4" = 1'-0"3 Existing North Elevation
1/4" = 1'-0"4 Existing East Elevation
UP
DN
A.3
2
4
Entry
101
Living Room
102
Dining Room
103
Kitchen
104
Bath
105
Family Room
106
Room
107
Laundry
108
Garage
110
Investigate and make
existing outlet safe
Update existing
outlets as required
(Allowance / ea.)
A.3
5
All existing recessed
fixtures to have trim
and lamps replaced
(approx 28)
LED 2700K
dimmable
Upgrade dimmers
Repair existing
rotten jamb
Repaint exterior of
door and jamb
(Charcoal)
Replace siding with new
textured Hardie (Arctic White)
Replace siding
with new
textured Hardie
(Arctic White)
A.3
3
Closet
Closet
Trim and drywall work -
both sides of wall
See elevations and
details
New Larsonstorm
door (model TBD)
Repaint exterior
of door and jamb
(Charcoal)
Mini-split outdoor unit
New Marvin Elevate
double casement window
ICA21592W
New construction in
existing opening
Divided lights with spacer
Custom painted interior
VERIFY SIZE ON SITE
New Marvin Elevate
triple casement window
ICA21593W
New construction in
existing opening
Divided lights with
spacer
Custom painted interior
VERIFY SIZE ON SITE
Install new
guardrail (to
be designed)
Replace first
oak tread
(to be
designed)
Step
Step
New Marvin Essential
double hung window
ITDH3052
New construction in
existing opening
Divided lights 6/6
VERIFY SIZE ON SITE
New Marvin Essential
double hung window
ITDH3052
New construction in
existing opening
Divided lights 6/6
VERIFY SIZE ON SITE
Paint all walls,
ceilings-new
trim to be
painted -existing
trim to remain
NO WORK NO WORK
NO WORK
NO WORK
Existing condenser unitsPaint all walls,
ceilings -trim to
remain
Repaint exterior
of door and jamb
(Charcoal)
Repaint exterior
of door and jamb
(Charcoal)Remove two existing quad tube flourescent fixtures and replace with studio lighting (to be designed)Consdier using Waveform Lighting Northlux lamps and/or fixturesUpgrade other existing lamps to match (9) (fixtures to remain)Existing pendant
light to remain
21'-8 1/4"9'-5 1/2"18'-11 5/8"4 1/2"2'-4 1/8"9'-5 1/2"1'-6 1/8"26'-1 1/2"8'-4 1/4"8'-0"7'-3 1/8"
New Marvin Elevate
double casement window
ICA21592W
New construction in
existing opening
Divided lights with spacer
Custom painted interior
VERIFY SIZE ON SITE
10'-2 3/4"
7'-4 7/8"8'-4 1/4"40'-0 3/8"3'-4"23'-10"27'-3 1/8"7'-11 3/8"7'-6 3/8"2'-10 1/2"5'-5 3/4"3'-10"3'-5 1/8"13'-1"13'-0 1/2"3'-4 1/8"4'-0 3/4"2'-10 1/2"5'-5 3/4"23'-11"
15'-5 3/4"24'-10 3/4"27'-2 1/8"10'-5 1/4"3'-2 5/8"6'-6 1/2"New continuous
handrail
3'-7 1/8"
Paint
existing
brick
Patch and repair GWB
as required
Fire tape existing
joints on adjacent wall
and ceiling
New white K-style gutters at all eaves
Connect downspouts to existing
underground evacuation system
EXISTING stove
location -Granite
countertop edges
(3 sides) to be
trimmed in place
for new slide in
stove
DN
7
Existing granite
Existing
wall
Add
blockingAdd drywall and flat tape
to granite
4 1/2"1 1/4"Existing granite
New drywall cornerNew drywall corner
Demo existing crown molding
Patch GWB corner req'd
Demo existing crown
molding to corner -patch
and infill South wall crown
as required
Patch GWB corner as req'd
5'-7 3/4"7'-9 1/4"8'-9"
Replace first tread
Existing
fireplace
Existing crown -cut to fit
Existing trim -cut to fit
Existing crown -cut to fit
Existing trim -cut to fit
Infill panel at thickness
and profile to match
vertical trim
Replace first step
Paint existing brick
Infill panel at thickness
and profile to match
vertical trim
(See detail A.3 -5)
Existing thermostat
Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
1/14/2020 3:08:56 PMAs indicated
Proposed First
Floor Plan
A.3
2020-01-14
Permit Set
19-045 (DES)
Geoff &
Linda Post
525 Park Hill Road
Florence MA
Description Date
Permit Set 01-14-20
Walkthrough Set 12-17-19
1/4" = 1'-0"1 Proposed 1st Floor
6" = 1'-0"5 Proposed Fireplace Detail 1
1/2" = 1'-0"2 Proposed fireplace wall (East)
1/2" = 1'-0"3 Proposed fireplace wall (West)
Infill with solid wood
panel -profile edge to
match vertical trim
3/8" = 1'-0"6 Fireplace panel detail
NOT TO SCALE
1/2" = 1'-0"4 Proposed Stair Guardrail (North)
First floor paint: (Verify on site)
Walls -BM OC-18 Dove Wing
Trim -BM 1530 Ocean Pebbles
Ceiling -White
Custom guard rail to be compliant
with IRC 2015 R312.1 and
corresponding MA ammendments
Final design TBD
1/2" = 1'-0"7 Proposed Stair Guardrail (West)
DN
A.62
A.6 3
A.4
4 8"A.3
2
45'-4 1/8"4'-0"5'-3 1/4"5'-2 3/8"14'-7 3/8"4'-0 3/8"6'-11 5/8"4'-1 3/8"19'-9 3/4"15'-1 1/2"
13'-7 1/2"4 1/2"1'-11 1/2"
5"
2'-3"4'-7 7/8"8 3/4"
1'-8 5/8"
10'-11 3/4"2'-6"2'-8 7/8"6'-10 5/8"4'-0"3'-8 3/4"5'-3 3/4"3'-4 3/4"4'-4"No work
Exercise Room
205
Guest Bedroom
203
Master Bedroom
206
Closet
Hall
201
Bath
202
Office
204
3
2'-4"
New 2x6
exterior
walls
Infill
window
opening1'-9"1'-9"New 2-1/4"
oak strip floor
to match
existing
Refinish
existing oak
floor
Refinish
existing oak
floor
Refinish
existing oak
floor
Option to refinish
existing oak stair
treads
5'-1 3/8"Replace existing bypass
door and jamb with new
4'-0" painted solid core 6
panel doors
Cut height to fit
New 6'-8" high opening -
wall to wall for custom
cabinet installation (by
owner)
New 2x10-2 header above
to replace existing
New walls
Existing 2x4 wall furred to 5-1/2"
Verify existing return
and remove if defunct
New floor
mounted
mini-split
A.6
A.64
3'-4 1/2"3'-4"A.6
6
5
A.6
7
A.6
8
New Dormer
Infill
window
opening
5
Replace siding
with new
textured Hardie
(Arctic White)
Replace siding on
gable wall with new
textured Hardie
(Arctic White)
Replace siding on
gable wall with new
textured Hardie
(Arctic White)
Replace siding on
dormer wall with
new textured Hardie
(Arctic White)
New frosted
full glass door
New frosted
full glass door
New Coax connection
New Marvin Essential
double casement window
ICA2036
New construction in new
opening
Divided lights with spacer
To match existing
VERIFY SIZE ON SITE
New Marvin Essential
casement window
IFCA2636
New construction in new
opening
Divided lights with spacer
To match existing
VERIFY SIZE ON SITE
Replace siding on
gable wall with new
textured Hardie
(Arctic White)
New 2x6 exterior wall
construction 16" o.c. -
3" closed cell foam in
bays
New continuous
handrail
7
4'-1 3/8"6'-11 5/8"4'-0 3/8"1'-2"4'-5"2'-3 1/2"3'-10 1/8"4'-0 3/8"7'-10 1/2"7'-1 5/8"11 1/8"7'-0 5/8"
New red oak strip flooring to
match existing
2'-5"3'-6"6'-8 1/2"Existing floor framing, insulation and GWB (below) to remain
Grills to
match
existing
4'-0 3/8"5'-2 3/8"14'-7 3/8"4'-0"7'-10 1/2"New red oak strip
flooring to match
existing
New frosted full
glass interior
primed french
door
5'-2 3/4"2x6 Rafters 16" o.c. -6.5" closed cell foam in bays
Existing floor framing, insulation and GWB (below) to remain
E
xisting rafters a
nd c
ollar tie
s to re
m
ain -
n
e
w G
WB an
d foa
m insulatio
nExisting walls
structure to remain -
new foam insulation,
new GWB
New GWB 2'-4 3/8"2'-10"7'-6 3/4"7'-3 5/8"7'-3 5/8"5'-4 1/2"5'-8 5/8"5'-4 1/2"
2'-3"1'-0"2'-7 3/4"11 1/8"
Existing
fan vent
to remain
6'-0"EQ EQ 2'-0"2'-0"4'-3 5/8"1'-7"1'-8"7'-7 1/2"6'-0"EQEQ3'-5 7/8"3'-5 7/8"EQEQEQEQ1'-6"
10 5/8"
New floor mount
mini-split
2'-4 3/4"New red oak strip flooring to
match existing 6'-7 1/4"3'-11"
Existing floor framing, insulation and GWB (below) to remain
New GWB
Existing walls
structure to remain -
new foam insulation,
new GWB
New 2x10-2 header above
Infill wall framing
as req'd
2x6 Rafters 16" o.c. -6.5" closed cell foam in bays
E xistin g rafters and co lla r tie s to re m a in -n ew G W B and foam in sula tionTeagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
1/14/2020 3:08:58 PMAs indicated
Proposed Second
Floor
A.4
2020-01-14
Permit Set
19-045 (DES)
Geoff &
Linda Post
525 Park Hill Road
Florence MA
Description Date
Permit Set 01-14-20
Walkthrough Set 12-17-19
1/4" = 1'-0"1 Proposed 2nd Floor
1/2" = 1'-0"4 Proposed Exercise Room (West)
1/2" = 1'-0"3 Proposed Exercise Room (North)
1/4" = 1'-0"2 2nd Floor Ceiling / Lighting
1/2" = 1'-0"5 Proposed Exercise Room (South)
Existing beam and floor system to remain
New textured Hardie
siding to match
existing (Arctic White)
and Boral trim
New trim and siding
New textured Hardie
siding to match
existing (Arctic White)
New Roof New Roof
New trim
and siding
New trim
and siding
3'-11 1/8"8'-1 3/8"3'-5 5/8"
Existing windows to remain New Roof
Existing
roofing to
remain
Existing roofing to remain
New windows casement
windows to replace existing
Repair rot
& paint
existing
door
New window
New window
New trim
and siding
New trim
and siding
New trim
and siding
New trim
and siding
New trim
and siding
New
trim
and
siding
Existing roofing to remain
New trim and siding
New Boral trim and
Hardie siding
New
windows
Existing
roofing to
remain
Repalce plaster
"Buddha belly"
with painted
MDO
Paint existing door
New Boral trim
New Boral trim
New asphalt shingles to
match existing
New Boral trim
Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
1/14/2020 3:08:59 PM1/4" = 1'-0"
Proposed
Elevations
A.5
2020-01-14
Permit Set
19-045 (DES)
Geoff &
Linda Post
525 Park Hill Road
Florence MA
Description Date
Permit Set 01-14-20
Walkthrough Set 12-17-19
1/4" = 1'-0"1 Proposed South Elevation
1/4" = 1'-0"4 Proposed West Elevation
1/4" = 1'-0"3 Proposed North Elevation
1/4" = 1'-0"2 Proposed East Elevation
A.628"8"
Existing plumbing stack
clearance (approx.)
7'-7 5/8"
2'-3"5 5/8"2'-4"1'-10 1/4"8 3/4"
1'-10"4'-10 1/4"5 3/4"2'-4 3/4"7'-8 3/4"New
elongated
toilet
Tub and
enclosure
to remain
New tile floor
Existing Moen T6420
(ORB) to be reused
New faucet to
match existing
7'-9 5/8"
7'-7 5/8"
A.64New solid surface countertop and backsplashRod and shelf1'-8 5/8"
1'-10 3/8"
2'-8 7/8"2'-10 3/4"5'-7"2'-6 3/4"2'-0"
Switch door swing or
replace with new pre-hung
door to match
2'-4"
3/4"
1'-6"1'-0"2'-3"2'-3"8"4'-2"4"1 1/2"2'-10 1/2"1'-1"2'-8"3'-9"Plumbing chase7'-0 3/4"
7'-8 3/4"7'-6"Artwork
by
owner
7"New lightingExisting fan /
light to remain
New
medicine
cabinet
New
medicine
cabinet
4" Backsplash
and
sidesplashes
7'-6"2'-6 3/4"9 1/2"4'-0"9 1/2"2'-10 3/4"6 1/2"3'-4"6 1/2"4'-3 7/8"7'-6"6'-8"10 5/8"1'-8"10 5/8"2'-8"4'-0"10"1'-0"1'-0"1'-0"1'-0"3/8" Glass
shelves x3
Drywall back and
returns
Lighting above
(2ea.)
WAC HR-
LED87-2700K-BN
or similar
Drywall back and
returns
Lighting above
(2ea.)
WAC HR-
LED87-2700K-BN
or similar
3'-4 3/4"8 3/4"2'-6"4'-6 1/4"2'-2"7'-0 3/4"3'-8"3'-0"10"6'-8"New frosted glass
pocket door
8 1/2"
2x10 Studs
1/2" GWB
1/2" CDX
plywood
3/8" Glass shelf
Glass brackets to be
selected
8 3/4"
1/2" CDX plywood
1/2" GWB
2x6 Studs
5"6 1/2"EQ EQ
Existing 2x4 stud 2x4 Timberstand studs on the flat6 1/2"Pad out existing studs
5 1/2"Guest Bedroom
Hallway
Colonial casing to match existing
1x Trim -screw Bedroom
side with finish screws to
allow for access
New frosted full light door
panel to be painted
Teagno Construction Inc.24x36(413) 549-0803
design@teagnoconstruction.comTitlePageScale:
TEAGNO CONSTRUCTION INC.
Revisions
1/14/2020 3:09:00 PMAs indicated
Proposed Second
Floor Details
A.6
2020-01-14
Permit Set
19-045 (DES)
Geoff &
Linda Post
525 Park Hill Road
Florence MA
Description Date
Permit Set 01-14-20
Walkthrough Set 12-17-19
1/2" = 1'-0"1 Proposed 2nd Floor (Bathroom)1/2" = 1'-0"2 Proposed Bathroom (South)
1/2" = 1'-0"3 Proposed Guest Bedroom Elevation
1/2" = 1'-0"4 Hallway Niche 1
1/2" = 1'-0"5 Hallway Niche 2
6" = 1'-0"6 Proposed Niche detail
6" = 1'-0"7 Proposed Niche detail 2
3" = 1'-0"8 Proposed Pocket door detail
Second floor paint: (Verify on site)
Walls -BM (TBD)
Trim -BM (TBD)
Ceiling -White