Loading...
Mech_Initial Construction Control DocumentVersion 01_01_2018 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Trueliev - Northampton Date: November 6 , 2019 Property Address: 216 north king Street, Northampton MA Project: Check (x) one or both as applicable: New construction (x) Existing Construction Project description: Gut rehab of existing office building for a new medical and adult use cannabis distrabution, including new mechanical, upgrades. I James P Stroke MA Registration Number: 20068 Expiration date: 6/30/2020 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning1: Architectural Structural X Mechanical Fire Protection Electrical Other: for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the Professional Standard of Care, and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminsish or relieve the Contractor of its submittal and other responsibilities. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. The contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures, and for construction safety. 4. The performance of the services shall not require any special testing or inspections unless specifically stated in the Code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a ‘Final Construction Control Document’. Enter in the space to the right a “wet” or electronic signature and seal: Phone number:413-732-5131 Email: ddangelo@tjconway.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an ‘x’ project design plans, computations and specifications that you prepared or directly supervised. If ‘other’ is chosen, provide a description.