CS Header CalcsCS Structure™ 2018.9 [Build 16]
kmBeamEngine 2018.9.0.1
Materials Database 1572
DadmunTomZoll - Level 8 6- 4-19
4:54pm
1 of 2
All product names are trademarks of their respective owners
Copyright (C) 2018 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.
**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and
Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product
installation according to the manufacturer`s specifications.
Doug Hodgins
rk Miles Inc.
21 West St.
West Hatfield Ma.
Member Data
Description: CalcB1 Member Type: Beam Application: Floor
Comments:Top Lateral Bracing: Continuous
Bottom Lateral Bracing: Continuous
Standard Load: Moisture Condition: Dry Building Code: IBC/IRC
Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total
Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 12.0 PLF
Filename: C:\KMW\JOBS\
Other Loads
Type
(Description) Side Begin End
Trib.
Width
Other
Start End
Dead
Start End Category
Replacement Uniform (PLF) Top 0' 0.00" 12' 3.00" 385 0 Snow
Replacement Uniform (PLF) Top 0' 0.00" 12' 3.00" 301 305 Live
1 2
12 3 0
12 3 0
Bearings and Reactions
Input Min Gravity Gravity
Location Type Material Length Required Reaction Uplift
1 0' 0.000" Wall SPF Plate (425psi) N/A 3.396" 5051# --
2 12' 3.000" Wall SPF Plate (425psi) N/A 3.396" 5051# --
Maximum Load Case Reactions
Used for applying point loads (or line loads) to carrying members
Live Snow Dead
1 1829# 2338# 1926#
2 1829# 2338# 1926#
Design spans
12' 1.750"
Product: 1-3/4x11-7/8 VERSA-LAM 2.0 3100 SP 2 ply PASSES DESIGN CHECKS
Minimum 3.40" bearing required at bearing # 1
Minimum 3.40" bearing required at bearing # 2
Design assumes continuous lateral bracing along the top chord.
Design assumes continuous lateral bracing along the bottom chord.
Allowable Stress Design
Actual Allowable Capacity Location Loading
Positive Moment 15337.'# 24466.'# 62% 6.13' Total Load D+0.75(L+S)
Shear 4228.# 9081.# 46% 0.06' Total Load D+0.75(L+S)
TL Deflection 0.4169" 0.6073" L/349 6.13' Total Load D+0.75(L+S)
LL Deflection 0.2579" 0.4049" L/565 6.13' Total Load 0.75(L+S)
Control: TL Deflection
DOLs: Live=100% Snow=115% Roof=125% Wind=160%
Manufacturer's installation guide MUST be consulted for multi-ply connection details and alternatives
CS Structure™ 2018.9 [Build 16]
kmBeamEngine 2018.9.0.1
Materials Database 1572
DadmunTomZoll - Level 8 6- 4-19
4:54pm
2 of 2
All product names are trademarks of their respective owners
Copyright (C) 2018 by Simpson Strong-Tie Company Inc. ALL RIGHTS RESERVED.
**Passing is defined as when the member, floor joist, beam or girder, shown on this drawing meets applicable design criteria for Loads, Loading Conditions, and
Spans listed on this sheet. The design must be reviewed by a qualified designer or design professional as required for approval. This design assumes product
installation according to the manufacturer`s specifications.
Doug Hodgins
rk Miles Inc.
21 West St.
West Hatfield Ma.
Member Data
Description: CalcB2 Member Type: Beam Application: Floor
Comments:Top Lateral Bracing: Continuous
Bottom Lateral Bracing: Continuous
Standard Load: Moisture Condition: Dry Building Code: IBC/IRC
Live Load: 0 PLF Deflection Criteria: L/360 live, L/240 total
Dead Load: 0 PLF Deck Connection: Nailed Member Weight: 6.8 PLF
Filename: C:\KMW\JOBS\
Other Loads
Type
(Description) Side Begin End
Trib.
Width
Other
Start End
Dead
Start End Category
Replacement Uniform (PLF) Top 0' 0.00" 11' 3.00" -53 -13 Live
Replacement Uniform (PLF) Top 0' 0.00" 11' 3.00" 9 2 Live
Replacement Uniform (PLF) Top 0' 0.00" 11' 3.00" 27 7 Live
Replacement Uniform (PLF) Top 0' 0.00" 11' 3.00" 40 13 Live
Replacement Uniform (PLF) Top 0' 0.00" 11' 3.00" 87 106 Snow
1 2
11 3 0
11 3 0
Bearings and Reactions
Input Min Gravity Gravity
Location Type Material Length Required Reaction Uplift
1 0' 0.000" Wall SPF Plate (425psi) N/A 1.500" 1432# -332#
2 11' 3.000" Wall SPF Plate (425psi) N/A 1.500" 1432# -332#
Maximum Load Case Reactions
Used for applying point loads (or line loads) to carrying members
Live Snow Dead
1 423# 484# 752#
2 423# 484# 752#
Design spans
11' 1.750"
Product: Spruce-Pine-Fir #2 2 x 12 2 ply PASSES DESIGN CHECKS
Design assumes continuous lateral bracing along the top chord.
Design assumes continuous lateral bracing along the bottom chord.
Review gravity uplift reaction force of 332lbs at bearing 1 and ensure that the structure can resist appropriately.
Review gravity uplift reaction force of 332lbs at bearing 2 and ensure that the structure can resist appropriately.
Allowable Stress Design
Actual Allowable Capacity Location Loading
Positive Moment 3989.'# 5306.'# 75% 5.62' Total Load D+0.75(L+S)
Negative Moment 927.'# 4614.'# 20% 5.62' Total Load D+L
Shear 1191.# 3493.# 34% 0.06' Total Load D+0.75(L+S)
LL Deflection 0.0850" 0.3715" L/999+ 5.62' Total Load 0.75(L+S)
TL Deflection 0.1790" 0.5573" L/747 5.62' Total Load D+0.75(L+S)
Control: Positive Moment
DOLs: Live=100% Snow=115% Roof=125% Wind=160%
This member has been designed in accordance with NDS 2012